Laserfiche WebLink
At Form 521) 010 60eB S FAT E OF FLORIDA DEPARTMENT OF TRANSPORTATION <br />525 -011 -OR <br />STATE -FUNDED GRANT AGREEMENT <br />PROGRAM <br />1801 27th Street <br />MANAGEMENT <br />Vero Beach, FL 32960 <br />8121 <br />Page 1 of 1 <br />EXHIBIT B <br />) <br />LOCAL FUNDS <br />SCHEDULE OF FINANCIAL ASSISTANCE <br />Indicate source of <br />Local funds <br />RECIPIENT NAME & BILLING ADDRESS: <br />FINANCIAL PROJECT NUMBER: <br />Indian River County <br />441919-1-54-01 <br />1801 27th Street <br />Vero Beach, FL 32960 <br />MAXIMUM PARTICIPATION <br />TOTAL PROJECT FUNDS <br />) <br />LOCAL FUNDS <br />STATE FUNDS <br />Indicate source of <br />Local funds <br />PHASE OF WORK by Fiscal Year: <br />Design- Phase 34 Maximum Department Participation <br />$ <br />$ <br />$ <br />E] In -Kind <br />FY: (Insert Program Name) <br />❑ Cash <br />FY: Maximum Department Participation <br />$ <br />$ <br />$ <br />In -Kind <br />(Insert Program Name) <br />Cash <br />Total Design Cost <br />$ 0.00 <br />$ 0.00 <br />$ 0.00 <br />Right -of -Way- Phase 44Maximum Department Participation <br />$ <br />$ <br />$ <br />In -Kind <br />FY: (Insert Program Name) <br />E] Cash <br />FY: Maximum Department Participation <br />$ <br />$ <br />$ <br />E] In -Kind <br />(Insert Program Name) <br />El Cash <br />Total Right -of -Way Cost <br />$ 0.00 <br />$ 0.00 <br />$ 0.00 <br />Construction- Phase 54 Maximum Department Participation <br />$2,561,609.00 <br />$1,123,303.00 <br />$1,438,306.60 <br />In -Kind <br />FY: 2022 (Small County Outreach Program <br />® Cash <br />FY: 2023 Maximum Department Participation <br />$3,027,062.00 <br />$619,645.00 <br />$2,407,418.00 <br />E] In -Kind <br />(ISmall County Outreach Program) <br />® Cash <br />Total Construction Cost <br />$5,588,671.00 <br />$1,742,948.00 <br />$3,845,724.00 <br />Construction Maximum Department Participation <br />$ <br />$ <br />$ <br />In -Kind <br />Engineering and (Insert Program Name) <br />El Cash <br />Inspection - Phase 64 <br />FY: <br />FY: Maximum Department Participation <br />$ <br />$ <br />$ <br />In -Kind <br />(Insert Program Name) <br />Cash <br />Total Construction Engineering and Inspection Cost <br />$ 0.00 <br />$ 0.00 <br />$ 0.00 <br />(Phase : ) Maximum Department Participation <br />$ <br />$ <br />$ <br />In -Kind <br />FY: (Insert Program Name) <br />E]Cash <br />FY: Maximum Department Participation <br />$ <br />$ <br />$ <br />E] In -Kind <br />(Insert Program Name) <br />E] Cash <br />Total Cost <br />$ 0.00 <br />$ 0.00 <br />$ 0.00 <br />TOTAL COST OF THE PROJECT <br />$5,588,671.00 <br />$1,742,948.00 <br />$3,845,724.00 <br />COST ANALYSIS CERTIFICATION AS REQUIRED BY SECTION 216.3475, FLORIDA STATUTES: <br />I certify that the cost for each line item budget category has been evaluated and determined to be allowable, reasonable, and necessary as required by <br />Section 216.3475, F.S. Documentation is on file evidencing the methodology used and the conclusions reached. <br />Susan Dale <br />District Grant Manager Name <br />Signature Date <br />