Laserfiche WebLink
-1- brLWHCATIONS: FLORIDA DEPARTMENT OF TRANSPORTATION <br />-STANDARD SPECIFICATIONS FOR ROAD AND BRIDGE CONSTRUCTION' DATED <br />NUARY 2022 AND INDIANINDIANRIVER COUNTY STANDARD SPECIFICATIONS. <br />2. CA <br />ONSTRUCTION DETAILS SHALL BE N ACCORDANCE WITH FLORIDA <br />DEPARTMENT OF TRANSPORTATION STANDARD PLANS FY 2D21.22. <br />3. ALL STATIONS AND OFFSETS ARE REFERENCED TO BASELINE OFSURVEY. <br />4. ALL DISTURBED - SHALL BE SODDm WITHIN SEVEN DAYS OF FINAL GRADING. <br />ALL SOD PLACED ON A SLOPE STEEPER THAN 4:1 SHALL BE PEGGED, COST OF <br />PEGGING SOD SHALL BE INCLUDED IN PERFORMANCE TURF UNIT COST. ALL SOD <br />TO BE NON4NVASNVE- <br />5. THE CONTRACTOR WILL RESTORE ALL AREAS DISTURBED BY THIS <br />CONSTRUCTION TO A CONDITION EQUAL TO, OR BETTER THAN THAT NOW <br />EXISTING. <br />6. ITEMS IN CONFLICT WITH CONSTRUCTION SUCH AS EXISTING SIDEWALKS, <br />DRAINAGE STRUCTURES, PAVEMENT AND RASE AND EXCESS EXCAVATIONS ARE <br />TO BE REMOVED By CONTRACTOR AND DISPOSED OF IN A LEGAL AND PROPER <br />MANNER AWAY FROM THE JOB SITE ATTHE CONTRACTOR'S EXPENSE, UNLESS <br />THE ITEMS ARE SPECIFIED TO BE REUSED ON THE PROJECT. <br />7. EXISTING TREES WITHIN THE PROJECT LIMITS ARE INTENDED TO REMAIN, <br />UNLESS THEY ARE IN DIRECT CONFLICT WITH THE PROPOSED IMPROVEMENTS <br />OR NOICATED TO BE REMOVED. CONTRACTOR SHALL TAKE DUE CARE AS TO <br />PROTECT EXISTING TREES WITHIN THE PROJECT LIMITS THAT ARE NOT IN <br />DIRECT CONFLICT WITH THE IMPROVEMENTS. THE CONTRACTOR SHALL REMOVE <br />ALL EXOTIC VEGETATION LOCATED WITH THE PROJECT LIMITS WITHIN PUBLIC <br />RIGHT OF WAY_ COST OF TREE PRESERVATION SHALL BE INCLUDED WITHIN PAY <br />ITEM 104.2 AND EXOTIC VEGETATION REMOVAL SHALL BE INCLUDED WITHIN PAY <br />ITEM 1141-1. <br />B. STAGING AND MATERIAL STORAGE SHALL NOT BE CONDUCTED ON ANY <br />ABUTTING PRIVATE PROPERTY WITHOUT WRITTEN AGREEMENT APPROVAL FROM <br />THE OWNER UPON PROJECT COMPLETION, SHOULD CONTRACTOR HAVE <br />STAGED MIDAIR STORED MATERIAL ON PRIVATE PROPERTY THE CONTRACTOR <br />SHALL OBTAIN A WRITTEN RELEASE FROM THE PROPERTY OWNER. A COPY OF <br />THE WRITTEN RELEASE SHALL BE PROVIDED TO THE COUNTY. <br />9- NO EXISTING BASE MATERIAL REMOVED IN EXCAVATION SHALL BE REUSES[ AS <br />PROPOSED BASE MATERIAL. <br />10. CLEARING AND GRUBBING- WITHIN THE UMITS OF CONSTRUCTION, ALL <br />VEGETATION AND ROOT MATERIAL SHALL BE REMOVED. <br />11. ALL VEGETATION, DEBRIS, A.C., CONCRETE OR OTHER UNSUITABLE MATERIAL <br />SHALL BE DISPOSED OF OFFSITE BY THE CONTRACTOR IN LEGAL MANNER AT <br />THE CONTRACTOR'S EXPENSE- <br />12. <br />XPENSE12. SOD PLACEMENT SHALL BE AS PER F.DO.T. INDEX 4105. SOD TYPE SHALL MATCH <br />EXISTING GRASS AND NOT SE OFANYTYpE OF INVASIVE SPECIES. <br />13, ANY EXISTING ROADWAY ANDIOR UTILITY THAT N OA IVE BY THE <br />CONTRACTOR SHALL BE CORRECTED AT THE CONTRACTORS EXPENSE. <br />14. EXISTING DRAINAGE STRUCTURE$ AND PIPES WITHIN THE CONSTRUCTION <br />LIMITS SHALL REMAIN UNLESS OTHERWISE NOTED. <br />15. SURFACE COURSE -TYPE F.C. 9.5 AND STRUCTURAL COURSE -TYPE S.P. 125 <br />SHALL CONFORM TO THE REQUIREMENTS OF THE FO.O.T. SPECIFICATIONS, 2022 <br />EDITION, SECTION 334, THE MINIMUM COMPACTED THICKNESS TO BE AS NOTED. <br />18. EMBANKMENT, SUBGRADE, BASE AND ASPHALT ARE 'IN PLACE' MEASUREMENTS. <br />17. THERE SHALL BE NO EXCAVATIONS LEFT OPEN AFTER END OF SHIFT,UNLESS <br />POSITIVELY SHIELCEO. <br />1& ALL CONSTRUCTION EQUIPMENT AND MATERIALS SHALL BE STORED IN AN AREA <br />DESIGNATED BY THE PARKS MANAGEMENT STAFF TO AVOID IMPACTS TO THE <br />ENVIRONMENTALLY SENSITIVE AREAS. <br />10. THE CONTRACTOR SHALL NOTIFY IRC MPO AT (T72) 2261034 8 FDLP PARKS <br />MANAGEMENT STAFF, 48 HOURS PRIOR TO BEGINNING CONSTRUCTION. <br />20. GUARANTEE - ALL MATERIAL AND EQUIPMENT TO BE FURNISHED AND/OR <br />INSTALLED BY THE CONTRACTOR UNDER THIS CONTRACT SHALL BE <br />GUARANTEED FOR A PERIOD OF ONE YEAR FROM THE DATE OF FINAL <br />ACCEPTANCE THEREOF. AGAINST DEFECTIVE MATERIALS, DESIGN AND <br />WORKMANSHIP. UPON RECEIPT OF NOTICE FROM THE OWNER OF FAILURE OF <br />ANY PART OF THE GUARANTEED EQUIPMENT OR MATERIALS DURING THE <br />GUARANTY PERIOD. THE AFFECTED PART, PARTS OR MATERIALS SHALL BE <br />REPAIRED OR REPLACED BY THE CONTRACTOR AT NO EXPENSE TO THE OWNER <br />IN THE EVENT THE CONTRACTOR FAILS TO MAKE THE NECESSARY <br />REPLACEMENT OR REPAIRS WITHIN SEVEN DAYS AFTER NOTIFICATION BY THE <br />OWNER. THE OWNER MAY ACCOMPLISH THE WORK AT THE EXPENSE OF THE <br />CONTRACTOR (FINAL ACCEPTANCE IS CONSIDERED TO BE FINAL APPROVAL BY <br />THE IRC, BOARD OF COUNTY COMMISSIONERS-) <br />21. ALL CHANGES SHALL BE APPROVED IN WRITING BY INDIAN RIVER COUNTY AND <br />THE ENGINEER OF RECORD. <br />CHANGED N SIZE BY REPRODUCTION. THIS MUST BE CONSIDERED WHEN <br />OBTAINING SCALED DATA <br />23. CONTRACTOR SHALL UTILIZE CONSTRUCTION METHODS AND DEVICES SUCH AS <br />TURBIDITY BARRIERS, SYNTHETIC BALES AND FLOATING SILT BARRIERS WHERE <br />NECESSARY TO COMPLY WITH ALL LOCAL, STATE AND FEDERAL WATER QUALITY <br />STANDARDS. <br />24. CONTRACTORTO INCLUDE ALL CONSTRUCTION SURVEY STAKE-Wr. A"UiLTS <br />AND SOILS I COMPACTION TESTING IN BID. <br />FOEP SPECIAL CONDMNS- <br />1. CONTRACTOR SHALL DECONTAMINATE ALL EQUIPMENT BEFORE ENTERING OR LEAVING <br />THE PROJECT AREA TO ENSURE THAT NO PROPAGATES OR REPRODUCTIVE MATERIAL <br />IS TRANSPORTED BETWEEN TREATMENT SITES OR MANAGED AREAS. <br />2 IT SHALL BE THE RESPONSIBILITY OF THE ST. SEBASTIAN RIVER PRESERVE STATE PAR( <br />STAFF TO NSPECTALL EQUIPMENT PRIOR TO WORK COMMENCING ON THE FIRST DAY <br />AT THE PROJECT SITE, ON ANY OCCASION THAT THE EQUIPMENT LEAVES THE PROJECT <br />SRF, AND ANY TIME DURING THE COURSE OF THE CFEAATION ARRANGEMENTS FOR <br />INSPECTIONS MUST BE MADE N ADVANCE BY THE CONTRACTOR WITH PARK STAFF. <br />UNIDENTIFIEDAREAS OFCONTAMINP.TION <br />3. WHEN ENCOUNTERINGOR EXPOSING ANY ABNORMAL CONDITION INDICATING THE <br />PRESENCE OF A HAZARDOUS OR TOXIC WASTE, OR CONTAMINANTS, CEASE <br />OPERATIONS IMMEDIATELY N THE VICINITY AND NOTIFY THE INDIAN RIVER COUNTY LAP <br />ENGINEER. THE PRESENCE OF TANKS OR BARRELS DISCOLORED EARTH, METAL, <br />WOOD, GROUND WATER, ETC.; VISIBLE FUMES; ABNORMAL ODORS; EXCESSIVELY HOT <br />EARTH: SMOKE; OR OTHER CONDITIONS THAT APPEAR ABNORMAL MAY INDICATE <br />HAZARDOUS OR TOXIC WASTES OR CONTAMINANTS AND MUST BE TREATED WITH <br />EXTREMECAUTION. <br />4. MANE EVERY EFFORT TO MINIMIZE THE SPREAD OF CONTAMINATION INTO <br />UNCONTAMINATED AREAS. IMMEDIATELY PROVIDE FOR THE HEALTH AND SAFETY OF <br />ALL WORKERS AT THE JOB SITE AND MAKE PROVISIONS NECESSARY FOR THE HEALTH <br />AND SAFETY OF THE PUBUC THAT MAY BE EXPOSED TO ANY POTENTIALLY <br />HAZARDOUS CONDITIONS. PROVISIONS SHALL MEET ALL APPLICABLE LOCAL, STATE, <br />AND FEDERAL LAWS, RULES. REGULATIONS OR CODES COVERING HAZARDOUS <br />CONDITIONS AND WILL BE IN A MANNER COMMENSURATE WITH THE GRAVITY OF THE <br />CONDITIONS. <br />5. THE R'OLAN RIVER COUNTY LAP ENGINEER WILL COORDINATE AND MOBILIZE A <br />QUALIFIED CONTAMINATION ASSESSMENTNEMEDIATION (CAR.) CONTRACTOR. <br />QUALIFICATIONS OF SUCH CAR CONTRACTOR SHALL INCLUDE, BUT NOT BE <br />LIMITED TO: EXPERIENCE AND PERSONNEL TO PREPARE CONTAMINATION <br />ASSESSMENT PIANS, CONDUCT CONTAMINATION ASSESSMENTS, PREPARE SITE <br />ASSESSMENT REPORTS, REMEDIATION PLANS, NPLEMENT REMEO WL ACTION PLANS, <br />RISK BASED CORRECTIVE ACTIONS, STORAGE TANKS SYSTEM REMOVAL, HIGHWAY <br />SPILL RESPONSE AS WELL AS EXPERIENCE WITH INFRASTRUCTUREfCONSTRLcnoN <br />AOTMTIES WITHIN (POTENTIALLY) CONTAMINATED AREAS SPECIFIC TO <br />TRANSPORTATION SYSTEMS. <br />6. ALL THE WORK PERFORMED BY THE CAR CONTRACTOR SHALL BE PERFORMED IN <br />COMPLIANCE NTH ALL APPLICABLE LOCAL, STATE AND FEDERAL REGULATIONS <br />RN <br />GOVEING WORKER SAFETY AND ENVIRONMENTAL REGULATIONS. THIS IS TO <br />INCLUDE OCCUPATIONAL EXPOSURE TD CONTAMINATED SOILS, GROUNDWATER, <br />WASTES ANDATMOSPHERE DURING THE CONSTRUCTION OFALL FEATURES INCLUDED <br />IN THE CONSTRUCTION PLANS. IN ADDITION, THE CAR CONTRACTOR MUST BE <br />STAFFED WITH FLORIDA LICENSED TECHNICAL PROFESSION/LLS (GEOLOGISTS AND <br />ENGINEERS) WHO WILL BE INVOLVED WITH THE PROJECT AND KNOWLEDGEABLE OF <br />THE WORKACTVITIES CONDUCTED WITHIN THE IDENTIFIED CONTAMINATED AREAS <br />AND W HO WOULD SIGN AND SEAL PROJECT REPORTS AS REQUIRED FOR SUBMITTAL TO <br />THE APPROPRIATE ENVIRONMENTAL REGULATORY AGENCIES. <br />7. THE INDIAN RIVER COUNTY LAP ENGINEER WILL IMMEDIATELY NOTIFY THE FLORIDA <br />DEPARTMENT OF TRANSPORTATION (FOOT) DISTRICT N CONTAMINATION IMPACT <br />COORDINATOR (DCIC) AT (964) 7774268 AFTER ENCOUNTERING THE UNIDENTIFIED <br />AREAS OF CONTAMINATION PREUMINARY INVESTIGATION BY THE CAR. CONTRACTOR <br />WILL DE, ERMNE THE COURSE OF AGTIO14 NECESSARY FOR SITE SECURTYAND THE <br />STEPS NECESSARY UNDER APPLICABLE LAWS, RULES, AND REGULATIONS FOR <br />ADDITIONAL ASSESSMENT AND/OR REMEDIATION WORK TO RESOLVE THE <br />CONTAMINATION ISSUE. <br />B. FOLLOWING COMPLETION OF THE PROJECT, THE CAR. CONTRACTOR SHN.L BE <br />REQUIRED TO PROVIDE COPIES OF ALL REPORTS SUBMITTED TO REGULATORY <br />AGENCIES. WASTE MATERIAL PROFILES MANFEBTB ANDIOR DISPOSAL RECEIPTS FOR <br />THE HANDLING OF ALL CONTAMINATED MEDIA INCLUDING BUT NOT LIMITED TPD GROUND <br />WATER WASTE WATER, SOILS, SOLID WASTES, SLUDGE, HAZARDOUS WASTES, AIR <br />MONITORING RECORDS AND SAMPLE RESULTS FOR ALL MATERIALS TESTED AND <br />ANALYZED TOTHE INDIAN RIVER COUNTY LAP ENGINEER AND THE FOOT DCIC. <br />�MBY <br />1835 MOTH STREET <br />VENO MOTH TFL RJ2D66 <br />PH. (772) 6694=6 HISTORIC TRANS -FLORIDA RAIL <br />L6Alll FX. 1772) 7763817 <br />ENGINEERING, INC TRAIL EXTENSION <br />111V.�WEf W.WVM•NlOCup MBA6LIIKFI-FM/FAS/}In0 <br />aP10 �O+wamolwNaww G�vA .�Cln.nIPT41lW>d i INDIPII RIVER (X%KNTY <br />9. THIS PROJECT DOES NOTANTICIPATE THE USE OF ANY TEMPORARY FILLS. SHOULD <br />THE CONTRACTOR NEED TO UTILIZE TEMPORARY FILL DURING THE CONSTRUCTION <br />PHASE. THESE FILLS SHALL BE RFJMOVED UPON COMPLETION AND THE AREA <br />RESTORED TO PRE -CONSTRUCTION CONDIT10148 PURSUANT NT TO F.A.C_ 62.73.217. <br />INVA ESPECFS YANAOENE3JT:OECOIRAABNAIN)N GUIDELINE'S FOR EQUIPMENT AND WE <br />PRELIM14N2Y STATEMENT EXAMPLES: <br />i. THE CONTRACTOR SHALL REQUIRE ALL PERSONNEL TO PRACTICE PROPER SANITATION <br />PROCEDURES FOR ALL EQUIPMENT QNCLUDING PERSONAL PROTECTIVE GEAR) TO AVOID <br />UNNEECESSARY SPREADING OF INVASIVE AND EXOTIC PEST PLAN SPECIES WITHIN AND <br />FROM THE TREATMENT SITE. <br />2. CONTRACTORS WORKING ON INVASIVE EXOTIC REMOVAL PROJECTS MUST ADHERE TO THE <br />FOLLOWING PROTOCOL: <br />A. MANDATORY DECONTAMINATION PROTOCOLS MUST BE FOLLOWED FOR VEHICLES <br />AND EQUIPMENT PRIOR TO ENTERING INDIAN RIVER COUNTY FROM OUTSIDE OF THE <br />COUNTY <br />B. WHEN MOVING EQUIPMENT FROM SIT TO SITE VVTDHN INDIAN RIVER COUNTY, <br />DECONTAMINATION REQUIREMENTS WILL BE AT THE DISCRETION OF THE PROJECT <br />MANAGER AND WILL BE DEPENDANT UPON THE EXOTIC SPECIES THAT WERE <br />TREATED AT THE PREVIOUS SITE. AND ON THE NATURE OF THE TREATMENT SITES. <br />C. IF DECONTAMINATION IS REQUIRED BY THE PROJECT MANAGER THEN THE <br />CONTRACTOR MUST UIELTZE A DESIGNATED DECONTANINATTON SITE WIn-mN IND IAN <br />RIVER COUNTY. THE PROJECT MANAGER SHALL SUPPLY THE CONTRACTOR WITH A <br />LIST OF DESIGNATED DECONTAMINATION SITES [THESE MAY INCLUDE COUNTY <br />TRANSFER STATIONS AMD DOT STORAGE SITES). <br />3. PRIOR TO THE COMMFNCEMENT OF AN INVASIVE PLAN REMOVAL PROJECT, THE SITE <br />MANAGER SHALL ADDRESS THE NECESSITY FOR A DECONTAMINATION PLAN. IF THE <br />PROJECT MANAGER REQUIRES PLAN THEN THE CONTRACTOR SHALL SUBMIT ABRIEF <br />DECONTAMINATION PLAN IN WRITING, TO THE PROJECT MANAGER FOR APPROVAL, THE <br />DECONTAMINATION PLAN SHALL IDENTIFY SPECIFIC DECONTAMINATION PROCEDURES AND <br />DECONTANINATION LOCATIONS. DECONTAMINATION PROTOCOLS MAY VARY DEPENDING <br />UPON THE NATURE OF THE TREATMENT SITE, TYPE OF TREATMENT CONDUCTED AT THE <br />SITE, AND EXOTIC SPECIES THAT ARE SCHEDULED FOR TREATMENT. <br />A IT WILL BE THE RESPONSIBILITY OF THE SITE MANAGER TO INSPCT ALL EQUIPMENT <br />PRIOR TO WORK COMMENCING ON THE FIRST DAY AT THE PROJECT SITE, ON ANY <br />OCCASION THAT THE EOLAPMENT LEAVES THE PROJECT SITE, AND ANY TIME DURING <br />THE COURSE OF THE CONTROL OPERATION. <br />B. FAILURE TO COMPLY WITH THE DECONTAMINATION PROTOCOLS CONSTRUITSA <br />REASON FOR CONTRACT CANCELLATION AND DISMISSAL OF THE CONTRACTOR. <br />PROTOCOL EXAMPLES: <br />1. ALL EQUIPMENT INCLUDING BUT NOT LIMITED TO VEHICLES, TRAILER, ATV'S, AND CHIPPERS <br />MUST BE CLEANED WITH A PRESSURE WASHER (AT AFACLIIY APPROVED BY THE <br />MANAGING AGENCY'S PROJECT MANAGER). DECONTAMINATION PROTOCOLS INCLUDE <br />SPRAYING DOWN ALL EQUIPMENT SURFACES INCLUDING THE UNDERCARRIAGE AND TIRES <br />TO INSURE MUD, VEGETATIVE DEBRIS AND OTHER DEBRIS N NOT TRANSPORTED FROM THE <br />PREVIOUS TREATMENT SITE SPECIAL ATTENTION WILL BE PAID TO EQUIPMENT THAT HAS <br />WORKED AT SITE WHERE LYGOIMITA COGAN GRASS AND OTHER EXOTICS SPECIFIC TO THE <br />MAINLAND WERE TREATED TO PREVENT THE SPREAD OF THESE INTO MONRDE COUNTY. <br />A EQUIPMENT SUCH AS CHAIN SAWS, LOPPERS, ETC. USED FOR CUT STUMP <br />TREATMENT MUST BE WIPED DOWN AND CLEANED SO THAT THEY ARE FREE OF <br />DEBRIS. <br />2. ALL EQUIPMENT INCLUDING BUT NOT UNITED TO VEHICLES, TRAILER, ANS, AND <br />CHIPPERS MUST BE CLEANED WITH A PRESSURE WASHER TO REDUCE THE SPREAD THE <br />SPREAD OF EXOTIC VEGETATION PRIOR TO INITIATING WOR(ACTIVI IES ON PUBLIC <br />LANDS. DECONTAMINATION PROTOCOLS INCLUDE SPRAYING DOWN ALL EQUIPMENT <br />SURFACES INCLUDING THE UNDERCARRIAGE AND TIRES TO INSURE MLID, VEGETATIVE <br />DEBRIS AND OTTER DEBRIS IN NOT TRANSPORTED FROM THE PREVIOUS TREATMENT <br />SITE. ALL HAND-Ha0 EQUIPMENT SUCH AS CHAIN SAWS, LOPPERS, ETC. TO BE USED <br />FOR TREATMENT ACTIVITIES MUST BE WIPED DOWN AND CLEANED SO THAT THEY ARE <br />FREE OF OEERL4. <br />A IN AREAS OF KNOWN LYGOD IM POPULATIONS, CONCERTED EFFORT WILL BE MADE <br />TO REMOVE SPORES FROM CATHING AND BOOTS BY USE OF COMPRESSED AIR ON <br />GARMENTS AND CLEANING BOOT LUGS PRIOR TO LEAVING THE TREATMENT SITE. <br />3 QUARANTINEEQUIPMENT ATASTAGING ARENAND SPRAY EQUIPMENT THOROUGHLY, <br />INCLUDING THE UNDERCARRIAGE AND TIRES, <br />US F)§H /y�0 YYIj�IJFI; SERVICE SPECIAL CON67RNTI04 NOTES: <br />1. ALL CONSTRUCTION AND PAVING ACTIVITIES WILL OCCUR OUTSIDE OF THE FLORIDA <br />SCRUB -JAY NESTING SEASON FROM JULY ISM TO FEBRUARY 15TH. <br />Z STORAGE OF MATERIALS AND EQUIPMENT ASSOCIATED WITH THE PROJECT WILL NOT <br />OCCUR IN NEAR SUITABLE HABITAT FOR THE FLORIDA SCRUB -.NY AND WILL BE UMITED <br />TO DISTURBED AREAS TO HAVE THE GREATEST EXTENT PRACTICABLE, <br />FLORIDA <br />GENERAL NOTES AND <br />SPECIAL CONDITIONS <br />C9 <br />