-1- brLWHCATIONS: FLORIDA DEPARTMENT OF TRANSPORTATION
<br />-STANDARD SPECIFICATIONS FOR ROAD AND BRIDGE CONSTRUCTION' DATED
<br />NUARY 2022 AND INDIANINDIANRIVER COUNTY STANDARD SPECIFICATIONS.
<br />2. CA
<br />ONSTRUCTION DETAILS SHALL BE N ACCORDANCE WITH FLORIDA
<br />DEPARTMENT OF TRANSPORTATION STANDARD PLANS FY 2D21.22.
<br />3. ALL STATIONS AND OFFSETS ARE REFERENCED TO BASELINE OFSURVEY.
<br />4. ALL DISTURBED - SHALL BE SODDm WITHIN SEVEN DAYS OF FINAL GRADING.
<br />ALL SOD PLACED ON A SLOPE STEEPER THAN 4:1 SHALL BE PEGGED, COST OF
<br />PEGGING SOD SHALL BE INCLUDED IN PERFORMANCE TURF UNIT COST. ALL SOD
<br />TO BE NON4NVASNVE-
<br />5. THE CONTRACTOR WILL RESTORE ALL AREAS DISTURBED BY THIS
<br />CONSTRUCTION TO A CONDITION EQUAL TO, OR BETTER THAN THAT NOW
<br />EXISTING.
<br />6. ITEMS IN CONFLICT WITH CONSTRUCTION SUCH AS EXISTING SIDEWALKS,
<br />DRAINAGE STRUCTURES, PAVEMENT AND RASE AND EXCESS EXCAVATIONS ARE
<br />TO BE REMOVED By CONTRACTOR AND DISPOSED OF IN A LEGAL AND PROPER
<br />MANNER AWAY FROM THE JOB SITE ATTHE CONTRACTOR'S EXPENSE, UNLESS
<br />THE ITEMS ARE SPECIFIED TO BE REUSED ON THE PROJECT.
<br />7. EXISTING TREES WITHIN THE PROJECT LIMITS ARE INTENDED TO REMAIN,
<br />UNLESS THEY ARE IN DIRECT CONFLICT WITH THE PROPOSED IMPROVEMENTS
<br />OR NOICATED TO BE REMOVED. CONTRACTOR SHALL TAKE DUE CARE AS TO
<br />PROTECT EXISTING TREES WITHIN THE PROJECT LIMITS THAT ARE NOT IN
<br />DIRECT CONFLICT WITH THE IMPROVEMENTS. THE CONTRACTOR SHALL REMOVE
<br />ALL EXOTIC VEGETATION LOCATED WITH THE PROJECT LIMITS WITHIN PUBLIC
<br />RIGHT OF WAY_ COST OF TREE PRESERVATION SHALL BE INCLUDED WITHIN PAY
<br />ITEM 104.2 AND EXOTIC VEGETATION REMOVAL SHALL BE INCLUDED WITHIN PAY
<br />ITEM 1141-1.
<br />B. STAGING AND MATERIAL STORAGE SHALL NOT BE CONDUCTED ON ANY
<br />ABUTTING PRIVATE PROPERTY WITHOUT WRITTEN AGREEMENT APPROVAL FROM
<br />THE OWNER UPON PROJECT COMPLETION, SHOULD CONTRACTOR HAVE
<br />STAGED MIDAIR STORED MATERIAL ON PRIVATE PROPERTY THE CONTRACTOR
<br />SHALL OBTAIN A WRITTEN RELEASE FROM THE PROPERTY OWNER. A COPY OF
<br />THE WRITTEN RELEASE SHALL BE PROVIDED TO THE COUNTY.
<br />9- NO EXISTING BASE MATERIAL REMOVED IN EXCAVATION SHALL BE REUSES[ AS
<br />PROPOSED BASE MATERIAL.
<br />10. CLEARING AND GRUBBING- WITHIN THE UMITS OF CONSTRUCTION, ALL
<br />VEGETATION AND ROOT MATERIAL SHALL BE REMOVED.
<br />11. ALL VEGETATION, DEBRIS, A.C., CONCRETE OR OTHER UNSUITABLE MATERIAL
<br />SHALL BE DISPOSED OF OFFSITE BY THE CONTRACTOR IN LEGAL MANNER AT
<br />THE CONTRACTOR'S EXPENSE-
<br />12.
<br />XPENSE12. SOD PLACEMENT SHALL BE AS PER F.DO.T. INDEX 4105. SOD TYPE SHALL MATCH
<br />EXISTING GRASS AND NOT SE OFANYTYpE OF INVASIVE SPECIES.
<br />13, ANY EXISTING ROADWAY ANDIOR UTILITY THAT N OA IVE BY THE
<br />CONTRACTOR SHALL BE CORRECTED AT THE CONTRACTORS EXPENSE.
<br />14. EXISTING DRAINAGE STRUCTURE$ AND PIPES WITHIN THE CONSTRUCTION
<br />LIMITS SHALL REMAIN UNLESS OTHERWISE NOTED.
<br />15. SURFACE COURSE -TYPE F.C. 9.5 AND STRUCTURAL COURSE -TYPE S.P. 125
<br />SHALL CONFORM TO THE REQUIREMENTS OF THE FO.O.T. SPECIFICATIONS, 2022
<br />EDITION, SECTION 334, THE MINIMUM COMPACTED THICKNESS TO BE AS NOTED.
<br />18. EMBANKMENT, SUBGRADE, BASE AND ASPHALT ARE 'IN PLACE' MEASUREMENTS.
<br />17. THERE SHALL BE NO EXCAVATIONS LEFT OPEN AFTER END OF SHIFT,UNLESS
<br />POSITIVELY SHIELCEO.
<br />1& ALL CONSTRUCTION EQUIPMENT AND MATERIALS SHALL BE STORED IN AN AREA
<br />DESIGNATED BY THE PARKS MANAGEMENT STAFF TO AVOID IMPACTS TO THE
<br />ENVIRONMENTALLY SENSITIVE AREAS.
<br />10. THE CONTRACTOR SHALL NOTIFY IRC MPO AT (T72) 2261034 8 FDLP PARKS
<br />MANAGEMENT STAFF, 48 HOURS PRIOR TO BEGINNING CONSTRUCTION.
<br />20. GUARANTEE - ALL MATERIAL AND EQUIPMENT TO BE FURNISHED AND/OR
<br />INSTALLED BY THE CONTRACTOR UNDER THIS CONTRACT SHALL BE
<br />GUARANTEED FOR A PERIOD OF ONE YEAR FROM THE DATE OF FINAL
<br />ACCEPTANCE THEREOF. AGAINST DEFECTIVE MATERIALS, DESIGN AND
<br />WORKMANSHIP. UPON RECEIPT OF NOTICE FROM THE OWNER OF FAILURE OF
<br />ANY PART OF THE GUARANTEED EQUIPMENT OR MATERIALS DURING THE
<br />GUARANTY PERIOD. THE AFFECTED PART, PARTS OR MATERIALS SHALL BE
<br />REPAIRED OR REPLACED BY THE CONTRACTOR AT NO EXPENSE TO THE OWNER
<br />IN THE EVENT THE CONTRACTOR FAILS TO MAKE THE NECESSARY
<br />REPLACEMENT OR REPAIRS WITHIN SEVEN DAYS AFTER NOTIFICATION BY THE
<br />OWNER. THE OWNER MAY ACCOMPLISH THE WORK AT THE EXPENSE OF THE
<br />CONTRACTOR (FINAL ACCEPTANCE IS CONSIDERED TO BE FINAL APPROVAL BY
<br />THE IRC, BOARD OF COUNTY COMMISSIONERS-)
<br />21. ALL CHANGES SHALL BE APPROVED IN WRITING BY INDIAN RIVER COUNTY AND
<br />THE ENGINEER OF RECORD.
<br />CHANGED N SIZE BY REPRODUCTION. THIS MUST BE CONSIDERED WHEN
<br />OBTAINING SCALED DATA
<br />23. CONTRACTOR SHALL UTILIZE CONSTRUCTION METHODS AND DEVICES SUCH AS
<br />TURBIDITY BARRIERS, SYNTHETIC BALES AND FLOATING SILT BARRIERS WHERE
<br />NECESSARY TO COMPLY WITH ALL LOCAL, STATE AND FEDERAL WATER QUALITY
<br />STANDARDS.
<br />24. CONTRACTORTO INCLUDE ALL CONSTRUCTION SURVEY STAKE-Wr. A"UiLTS
<br />AND SOILS I COMPACTION TESTING IN BID.
<br />FOEP SPECIAL CONDMNS-
<br />1. CONTRACTOR SHALL DECONTAMINATE ALL EQUIPMENT BEFORE ENTERING OR LEAVING
<br />THE PROJECT AREA TO ENSURE THAT NO PROPAGATES OR REPRODUCTIVE MATERIAL
<br />IS TRANSPORTED BETWEEN TREATMENT SITES OR MANAGED AREAS.
<br />2 IT SHALL BE THE RESPONSIBILITY OF THE ST. SEBASTIAN RIVER PRESERVE STATE PAR(
<br />STAFF TO NSPECTALL EQUIPMENT PRIOR TO WORK COMMENCING ON THE FIRST DAY
<br />AT THE PROJECT SITE, ON ANY OCCASION THAT THE EQUIPMENT LEAVES THE PROJECT
<br />SRF, AND ANY TIME DURING THE COURSE OF THE CFEAATION ARRANGEMENTS FOR
<br />INSPECTIONS MUST BE MADE N ADVANCE BY THE CONTRACTOR WITH PARK STAFF.
<br />UNIDENTIFIEDAREAS OFCONTAMINP.TION
<br />3. WHEN ENCOUNTERINGOR EXPOSING ANY ABNORMAL CONDITION INDICATING THE
<br />PRESENCE OF A HAZARDOUS OR TOXIC WASTE, OR CONTAMINANTS, CEASE
<br />OPERATIONS IMMEDIATELY N THE VICINITY AND NOTIFY THE INDIAN RIVER COUNTY LAP
<br />ENGINEER. THE PRESENCE OF TANKS OR BARRELS DISCOLORED EARTH, METAL,
<br />WOOD, GROUND WATER, ETC.; VISIBLE FUMES; ABNORMAL ODORS; EXCESSIVELY HOT
<br />EARTH: SMOKE; OR OTHER CONDITIONS THAT APPEAR ABNORMAL MAY INDICATE
<br />HAZARDOUS OR TOXIC WASTES OR CONTAMINANTS AND MUST BE TREATED WITH
<br />EXTREMECAUTION.
<br />4. MANE EVERY EFFORT TO MINIMIZE THE SPREAD OF CONTAMINATION INTO
<br />UNCONTAMINATED AREAS. IMMEDIATELY PROVIDE FOR THE HEALTH AND SAFETY OF
<br />ALL WORKERS AT THE JOB SITE AND MAKE PROVISIONS NECESSARY FOR THE HEALTH
<br />AND SAFETY OF THE PUBUC THAT MAY BE EXPOSED TO ANY POTENTIALLY
<br />HAZARDOUS CONDITIONS. PROVISIONS SHALL MEET ALL APPLICABLE LOCAL, STATE,
<br />AND FEDERAL LAWS, RULES. REGULATIONS OR CODES COVERING HAZARDOUS
<br />CONDITIONS AND WILL BE IN A MANNER COMMENSURATE WITH THE GRAVITY OF THE
<br />CONDITIONS.
<br />5. THE R'OLAN RIVER COUNTY LAP ENGINEER WILL COORDINATE AND MOBILIZE A
<br />QUALIFIED CONTAMINATION ASSESSMENTNEMEDIATION (CAR.) CONTRACTOR.
<br />QUALIFICATIONS OF SUCH CAR CONTRACTOR SHALL INCLUDE, BUT NOT BE
<br />LIMITED TO: EXPERIENCE AND PERSONNEL TO PREPARE CONTAMINATION
<br />ASSESSMENT PIANS, CONDUCT CONTAMINATION ASSESSMENTS, PREPARE SITE
<br />ASSESSMENT REPORTS, REMEDIATION PLANS, NPLEMENT REMEO WL ACTION PLANS,
<br />RISK BASED CORRECTIVE ACTIONS, STORAGE TANKS SYSTEM REMOVAL, HIGHWAY
<br />SPILL RESPONSE AS WELL AS EXPERIENCE WITH INFRASTRUCTUREfCONSTRLcnoN
<br />AOTMTIES WITHIN (POTENTIALLY) CONTAMINATED AREAS SPECIFIC TO
<br />TRANSPORTATION SYSTEMS.
<br />6. ALL THE WORK PERFORMED BY THE CAR CONTRACTOR SHALL BE PERFORMED IN
<br />COMPLIANCE NTH ALL APPLICABLE LOCAL, STATE AND FEDERAL REGULATIONS
<br />RN
<br />GOVEING WORKER SAFETY AND ENVIRONMENTAL REGULATIONS. THIS IS TO
<br />INCLUDE OCCUPATIONAL EXPOSURE TD CONTAMINATED SOILS, GROUNDWATER,
<br />WASTES ANDATMOSPHERE DURING THE CONSTRUCTION OFALL FEATURES INCLUDED
<br />IN THE CONSTRUCTION PLANS. IN ADDITION, THE CAR CONTRACTOR MUST BE
<br />STAFFED WITH FLORIDA LICENSED TECHNICAL PROFESSION/LLS (GEOLOGISTS AND
<br />ENGINEERS) WHO WILL BE INVOLVED WITH THE PROJECT AND KNOWLEDGEABLE OF
<br />THE WORKACTVITIES CONDUCTED WITHIN THE IDENTIFIED CONTAMINATED AREAS
<br />AND W HO WOULD SIGN AND SEAL PROJECT REPORTS AS REQUIRED FOR SUBMITTAL TO
<br />THE APPROPRIATE ENVIRONMENTAL REGULATORY AGENCIES.
<br />7. THE INDIAN RIVER COUNTY LAP ENGINEER WILL IMMEDIATELY NOTIFY THE FLORIDA
<br />DEPARTMENT OF TRANSPORTATION (FOOT) DISTRICT N CONTAMINATION IMPACT
<br />COORDINATOR (DCIC) AT (964) 7774268 AFTER ENCOUNTERING THE UNIDENTIFIED
<br />AREAS OF CONTAMINATION PREUMINARY INVESTIGATION BY THE CAR. CONTRACTOR
<br />WILL DE, ERMNE THE COURSE OF AGTIO14 NECESSARY FOR SITE SECURTYAND THE
<br />STEPS NECESSARY UNDER APPLICABLE LAWS, RULES, AND REGULATIONS FOR
<br />ADDITIONAL ASSESSMENT AND/OR REMEDIATION WORK TO RESOLVE THE
<br />CONTAMINATION ISSUE.
<br />B. FOLLOWING COMPLETION OF THE PROJECT, THE CAR. CONTRACTOR SHN.L BE
<br />REQUIRED TO PROVIDE COPIES OF ALL REPORTS SUBMITTED TO REGULATORY
<br />AGENCIES. WASTE MATERIAL PROFILES MANFEBTB ANDIOR DISPOSAL RECEIPTS FOR
<br />THE HANDLING OF ALL CONTAMINATED MEDIA INCLUDING BUT NOT LIMITED TPD GROUND
<br />WATER WASTE WATER, SOILS, SOLID WASTES, SLUDGE, HAZARDOUS WASTES, AIR
<br />MONITORING RECORDS AND SAMPLE RESULTS FOR ALL MATERIALS TESTED AND
<br />ANALYZED TOTHE INDIAN RIVER COUNTY LAP ENGINEER AND THE FOOT DCIC.
<br />�MBY
<br />1835 MOTH STREET
<br />VENO MOTH TFL RJ2D66
<br />PH. (772) 6694=6 HISTORIC TRANS -FLORIDA RAIL
<br />L6Alll FX. 1772) 7763817
<br />ENGINEERING, INC TRAIL EXTENSION
<br />111V.�WEf W.WVM•NlOCup MBA6LIIKFI-FM/FAS/}In0
<br />aP10 �O+wamolwNaww G�vA .�Cln.nIPT41lW>d i INDIPII RIVER (X%KNTY
<br />9. THIS PROJECT DOES NOTANTICIPATE THE USE OF ANY TEMPORARY FILLS. SHOULD
<br />THE CONTRACTOR NEED TO UTILIZE TEMPORARY FILL DURING THE CONSTRUCTION
<br />PHASE. THESE FILLS SHALL BE RFJMOVED UPON COMPLETION AND THE AREA
<br />RESTORED TO PRE -CONSTRUCTION CONDIT10148 PURSUANT NT TO F.A.C_ 62.73.217.
<br />INVA ESPECFS YANAOENE3JT:OECOIRAABNAIN)N GUIDELINE'S FOR EQUIPMENT AND WE
<br />PRELIM14N2Y STATEMENT EXAMPLES:
<br />i. THE CONTRACTOR SHALL REQUIRE ALL PERSONNEL TO PRACTICE PROPER SANITATION
<br />PROCEDURES FOR ALL EQUIPMENT QNCLUDING PERSONAL PROTECTIVE GEAR) TO AVOID
<br />UNNEECESSARY SPREADING OF INVASIVE AND EXOTIC PEST PLAN SPECIES WITHIN AND
<br />FROM THE TREATMENT SITE.
<br />2. CONTRACTORS WORKING ON INVASIVE EXOTIC REMOVAL PROJECTS MUST ADHERE TO THE
<br />FOLLOWING PROTOCOL:
<br />A. MANDATORY DECONTAMINATION PROTOCOLS MUST BE FOLLOWED FOR VEHICLES
<br />AND EQUIPMENT PRIOR TO ENTERING INDIAN RIVER COUNTY FROM OUTSIDE OF THE
<br />COUNTY
<br />B. WHEN MOVING EQUIPMENT FROM SIT TO SITE VVTDHN INDIAN RIVER COUNTY,
<br />DECONTAMINATION REQUIREMENTS WILL BE AT THE DISCRETION OF THE PROJECT
<br />MANAGER AND WILL BE DEPENDANT UPON THE EXOTIC SPECIES THAT WERE
<br />TREATED AT THE PREVIOUS SITE. AND ON THE NATURE OF THE TREATMENT SITES.
<br />C. IF DECONTAMINATION IS REQUIRED BY THE PROJECT MANAGER THEN THE
<br />CONTRACTOR MUST UIELTZE A DESIGNATED DECONTANINATTON SITE WIn-mN IND IAN
<br />RIVER COUNTY. THE PROJECT MANAGER SHALL SUPPLY THE CONTRACTOR WITH A
<br />LIST OF DESIGNATED DECONTAMINATION SITES [THESE MAY INCLUDE COUNTY
<br />TRANSFER STATIONS AMD DOT STORAGE SITES).
<br />3. PRIOR TO THE COMMFNCEMENT OF AN INVASIVE PLAN REMOVAL PROJECT, THE SITE
<br />MANAGER SHALL ADDRESS THE NECESSITY FOR A DECONTAMINATION PLAN. IF THE
<br />PROJECT MANAGER REQUIRES PLAN THEN THE CONTRACTOR SHALL SUBMIT ABRIEF
<br />DECONTAMINATION PLAN IN WRITING, TO THE PROJECT MANAGER FOR APPROVAL, THE
<br />DECONTAMINATION PLAN SHALL IDENTIFY SPECIFIC DECONTAMINATION PROCEDURES AND
<br />DECONTANINATION LOCATIONS. DECONTAMINATION PROTOCOLS MAY VARY DEPENDING
<br />UPON THE NATURE OF THE TREATMENT SITE, TYPE OF TREATMENT CONDUCTED AT THE
<br />SITE, AND EXOTIC SPECIES THAT ARE SCHEDULED FOR TREATMENT.
<br />A IT WILL BE THE RESPONSIBILITY OF THE SITE MANAGER TO INSPCT ALL EQUIPMENT
<br />PRIOR TO WORK COMMENCING ON THE FIRST DAY AT THE PROJECT SITE, ON ANY
<br />OCCASION THAT THE EOLAPMENT LEAVES THE PROJECT SITE, AND ANY TIME DURING
<br />THE COURSE OF THE CONTROL OPERATION.
<br />B. FAILURE TO COMPLY WITH THE DECONTAMINATION PROTOCOLS CONSTRUITSA
<br />REASON FOR CONTRACT CANCELLATION AND DISMISSAL OF THE CONTRACTOR.
<br />PROTOCOL EXAMPLES:
<br />1. ALL EQUIPMENT INCLUDING BUT NOT LIMITED TO VEHICLES, TRAILER, ATV'S, AND CHIPPERS
<br />MUST BE CLEANED WITH A PRESSURE WASHER (AT AFACLIIY APPROVED BY THE
<br />MANAGING AGENCY'S PROJECT MANAGER). DECONTAMINATION PROTOCOLS INCLUDE
<br />SPRAYING DOWN ALL EQUIPMENT SURFACES INCLUDING THE UNDERCARRIAGE AND TIRES
<br />TO INSURE MUD, VEGETATIVE DEBRIS AND OTHER DEBRIS N NOT TRANSPORTED FROM THE
<br />PREVIOUS TREATMENT SITE SPECIAL ATTENTION WILL BE PAID TO EQUIPMENT THAT HAS
<br />WORKED AT SITE WHERE LYGOIMITA COGAN GRASS AND OTHER EXOTICS SPECIFIC TO THE
<br />MAINLAND WERE TREATED TO PREVENT THE SPREAD OF THESE INTO MONRDE COUNTY.
<br />A EQUIPMENT SUCH AS CHAIN SAWS, LOPPERS, ETC. USED FOR CUT STUMP
<br />TREATMENT MUST BE WIPED DOWN AND CLEANED SO THAT THEY ARE FREE OF
<br />DEBRIS.
<br />2. ALL EQUIPMENT INCLUDING BUT NOT UNITED TO VEHICLES, TRAILER, ANS, AND
<br />CHIPPERS MUST BE CLEANED WITH A PRESSURE WASHER TO REDUCE THE SPREAD THE
<br />SPREAD OF EXOTIC VEGETATION PRIOR TO INITIATING WOR(ACTIVI IES ON PUBLIC
<br />LANDS. DECONTAMINATION PROTOCOLS INCLUDE SPRAYING DOWN ALL EQUIPMENT
<br />SURFACES INCLUDING THE UNDERCARRIAGE AND TIRES TO INSURE MLID, VEGETATIVE
<br />DEBRIS AND OTTER DEBRIS IN NOT TRANSPORTED FROM THE PREVIOUS TREATMENT
<br />SITE. ALL HAND-Ha0 EQUIPMENT SUCH AS CHAIN SAWS, LOPPERS, ETC. TO BE USED
<br />FOR TREATMENT ACTIVITIES MUST BE WIPED DOWN AND CLEANED SO THAT THEY ARE
<br />FREE OF OEERL4.
<br />A IN AREAS OF KNOWN LYGOD IM POPULATIONS, CONCERTED EFFORT WILL BE MADE
<br />TO REMOVE SPORES FROM CATHING AND BOOTS BY USE OF COMPRESSED AIR ON
<br />GARMENTS AND CLEANING BOOT LUGS PRIOR TO LEAVING THE TREATMENT SITE.
<br />3 QUARANTINEEQUIPMENT ATASTAGING ARENAND SPRAY EQUIPMENT THOROUGHLY,
<br />INCLUDING THE UNDERCARRIAGE AND TIRES,
<br />US F)§H /y�0 YYIj�IJFI; SERVICE SPECIAL CON67RNTI04 NOTES:
<br />1. ALL CONSTRUCTION AND PAVING ACTIVITIES WILL OCCUR OUTSIDE OF THE FLORIDA
<br />SCRUB -JAY NESTING SEASON FROM JULY ISM TO FEBRUARY 15TH.
<br />Z STORAGE OF MATERIALS AND EQUIPMENT ASSOCIATED WITH THE PROJECT WILL NOT
<br />OCCUR IN NEAR SUITABLE HABITAT FOR THE FLORIDA SCRUB -.NY AND WILL BE UMITED
<br />TO DISTURBED AREAS TO HAVE THE GREATEST EXTENT PRACTICABLE,
<br />FLORIDA
<br />GENERAL NOTES AND
<br />SPECIAL CONDITIONS
<br />C9