My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2023-055
CBCC
>
Official Documents
>
2020's
>
2023
>
2023-055
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/14/2023 11:34:37 AM
Creation date
4/14/2023 11:31:53 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Agreement
Approved Date
03/28/2023
Control Number
2023-055
Agenda Item Number
8.R.
Entity Name
Florida Power & Light Company, a Florida Corporation (FPL)
Subject
Right-of-Way Consent Agreement for construction of the Trans-Florida Railroad
Trail thru FP&L Easement
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
40
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
NOTES: <br />1. SILT FENCE SHALL BE PLACED <br />ON SLOPE CONTOURS TO <br />MAXIMIZE PONDING <br />EFFICIENCY. <br />L INSPECT AND REPAIR FENCE <br />AFTER EACH STORM EVENT <br />AND REMOVE SEDIMENT WHEN <br />NECESSARY. p" MAXIMUM <br />RECOMMENDED STORAGE <br />HEIGHT. <br />3. REMOVED SEDIMENT SHALL BE <br />DEPOSITED TO AN AREA THAT <br />WILL NOT CONTRIBUTE <br />SEDIMENT OFFSITE AND CAN <br />BE PERMANENTLY STABILIZED. <br />EXTRA STRENGTH FILTER STEEL OR <br />MINIMUM STANDARDS <br />FABRIC NEEDED WITHOUT WIRE WOOD POST ---_. <br />MESH SUPPORT <br />1. SEDIMENT BARN AND TRAPS, PERIMETER DIKES, SEDIMENT BARRIERS AND OTHER MEASURES INTENDED TO TRAP SEDIMENT SHALL BE CONSTRUCTED ASA <br />FIRST STEP IN ANY LAID -DISTURBING ACTIVITY AND SHALL BE MADE FUNCTIONAL BEFORE UNSLOPE LAND DMIUF41-ME TAKES PLACE. <br />ATTACH FILTER FABRIC�.����- �� <br />SECURELY TO UPSTRFAm SIDE' - <br />L ALL SEDIMENT CONTROL MEASURES ARE TO BE ADJUSTED TO MEET FIELD CONDITIONS AT THE TIME OF CONSTRUCRON AND BE CONSTRUCTED PRIOR TO ANY <br />GRADING OR DISTURBANCE OF <br />OF POST —. ' <br />EXISTING SURFACE MATERIAL ON BALANCE OFSTE. PERIMETER SEDNENT BARRIERS SHALL BE CONSTRUCTED TO PREVENT <br />SEDIMENT OR TRASH FROM FLOWING OR FLOATING ON TO ADJACENT PROPERTIES. <br />PERMANENT OR TEMPORARY SOI STABILIZATION SHALLBEAPPLIEDTO DENUDED AREASWITMN SEVEN DAYSAFTER FINAL GRADE IS REACHED ON ANY <br />�L.�t--• ! <br />PORTION OF THE SITE. TEMPORARY SOL STABILIZATION SHALL BE APPLIED WITHIN SEVEN DAYS TO DENUDED AREAS THAT MAY NOT BE AT FINAL GRADE BUT <br />\ <br />WILL REMAIN UNDISTURBED FOR LONGER THAN 30 DAYS. PERMANENT STABILIZATION SHALL BE APPLIED TO AREAS THAT ARE TO BE LEFT UNDISTURBED FOR <br />MORE THAN ONE YEAR <br />'•,`- T', <br />DURING CONSTRUCTION OF THE PROJECT. SOL STOCKPLES SHALL BE STABILIZED OR PROTECTED WITH SEDIMENTTRAPPING MEASURES. THE APPLICANT IS <br />T�i!r <br />RESFONSIBLEFOR THE TEMPORARY PROTECTION AND PERMANENT STABLIZATIONOFALL SOL STOCKPILESON SITE ASWELLAS BOIL INTENTIONALLY <br />_•�i <br />:. >•-^'+' ' TO' MAOOIMUM SPACING WITH WIRE <br />TRANSPORTED FROM THE PROJECT SITE <br />• SUPPORT FENCE, 6 MAXIMUM <br />SPACING WITFpITT WIRE SUPPORT <br />S A PEiMANENTVEGETATNE COVER SHALL BE ESTABLISHED ON DENUDED AREAS NDTOTFERWISE PEAMANENRY STABLQ87. PERMANENT VEGETATION <br />FENCE <br />SHALL NOT BE C(NSIDERED ESTABLISHED UNTIL A GROUND COVER IS ACHIEVED THAT. IN THE OPINION OF THE REVIEWER, IS UNIFORM, NATURE ENOUGH TO <br />SURVIVE AND WILL INHIBIT EROSION. <br />- STEEL OR WOOD POST - <br />w HIGH MAX. <br />PONDING HEIGHT <br />FLOW <br />M Pt <br />- 4•X@` TRENCH WITH <br />COMPACTED RAMFILL <br />TRENCH DETAIL <br />-PONDING HEIGHT <br />FLOW <br />t. <br />1: a <br />, �W MIN. DRAW ROCK <br />INSTALLATION WITHOUT <br />TYPE IV SILT FENCE TRENCHING <br />-- NMTMS. <br />EROSION AND SEDIMENTATION CONTROL NOTES <br />CONSTRUCTION ACTIVITIES CAN RESULT IN THE GENERATION OF SIONIFIGIR AMOUNTS OF POLLUTANTS <br />WHICH MAY REACH SURFACE OR GROUND WATERS. ONE OF THE PRIMARY POLLUTANTS OF SURFACE <br />WATERS IS SEDIMENT DUE TO EROSION. EXCESSIVE QUANTITIES OF SEDIMENT VMHI)H REACH WATER <br />BODIES OF FLOOD PANS HAVE BEEN SHOWN TO ADVERSELY AFFECT THEIR PHYSICAL, BIOLOGICAL. AND <br />CHEMICAL PROPERTIES. TRANSPORTED SEDIMENT CAN OBSTRUCT STREAM CHANNELS, REDUCE <br />INYMAULIC CAPACITY OF WATER BODIES OF FLOOD PLANS, REDUCE THE DESIGN CAPACITY OF <br />CULVERTS AND OTHER WORKS, AND ELDMNATE BEHTFfC riVERTEBRATES MD FISH SPAWNING <br />SUBSTRATES BY SILTATION, EXCESSIVE SUSPENDED SEDIMENTS REDUCE UC9T PEETRATIONAND <br />THEREFORE, REDUCE PRIMARY PRODUCTIVITY. <br />ao ®��� 1�i B IOTA STREET <br />' VCTw BEACH. L'L J398D <br />d+N PH. (772),889-0835 <br />ENNOALAA <br />P,1N pTp,yR FX. (1-) 178-3817 <br />EERlNGI,INuC <br />GINvuArVeA.uoou�uansn-AMLII+I RASMew <br />vEn4mnMcllBDwToec.w, .—. o�mva M:rA� +mmeR wran.oeroaee~a .wma n-..MPm.wAom <br />B. STABILIZATION MEASURES SHALL BE APPLIED TO EARTHEN STRUCTURES SUCH AS DAMS, DIKES AND DIVERSIONS IMMEDIATELY AFTER INSTALLATION. <br />7. SURFACE RUNOFF FROM DISTURBED AREAS THAT IS COMPRISED OF FLOW FROM DRAINAGE AREAS GREATER THAN OR EQUAL TO THREE ACRES SHALL BE <br />CONTROLLED BY A SEDIMENT BASIN. THE SEDIMENT BASIN SHALL BE DESIGNED AND CONSTRUCTED TOACCOMMODATE THE ANTICIPATED SEDIMENT LOADING <br />FROM THE LANDOISTURBING ACTIVITY. THE OUTFALL DEVICE OR SYSTEM DESIGN SHALL TAKE INTO ACCURT THE TOTAL DRAINAGE AREA ROWING THROUGH <br />THE DISTURBED AREA TO BE SERVED BY THE BASIN. <br />Q AFTER ANY SIGNIFICANT RAINFALL, SEDIMENT CONTROL STRUCTURES WILL BE INSPECTED FOR INTEGRITY. ANY DAMAGED DEVICES SHALL BE CORRECTED <br />IMMEDIATELY. <br />A. CONCENTRATED RUNOFF SHALL NOT ROW DOWN CUT OR FILL SLOPES UNLESS CONTAINED WITHIN AN ADEQUATE TEMPORARY CIO PERMANENT CW MEL <br />FLUME OR SLOPE DRAM STRUCTURE <br />1 Q WHENEVER WATER SEEPS FROM A SLOPE FACE, ADEQUATE DRAINAGE OR OTHER PROTECTION SHALL BE PROVIDED. <br />II 11, SEDIMENT WILL BE PREVENTED FROM ENTERNO ANYSTORM DRAIN SYSTEM,DITCH OR CHANNEL. ALL STORM SEWER INLETS THAT ARE MADE OPERABLE <br />DURING CONSTRUCTION SHALL BE PROTECTED SO THAT SEDWENT•LADEN WATER CANNOT ENTER THE CONVEYANCE SYSTEM WITH CUT FIRST SENG <br />FILTERED OR OTHERWISE TREATED TO REMOVE SEDIMENT. <br />12 BEFORE TEMPORARY OR NEWLY CONSTRUCTED STORMWATER CONVEYANCE CHANNELS ARE MADE OPERATIONAL, ADEQUATE CUTLET PROTECTION AND ANY <br />REQUIRED TEMPORARY OR PERMANENT CHANNEL LINING SHALL BE INSTALLED IN BOTH THE CONVEYANCE CHANNEL AND REEVING CHANNEL, <br />13. WHEN WORK INA LINE WATERCOURSE IS PERFORMED, <br />PRECAUTIONS SHALL LGE TAKEN TO MINIMIZE ENCROACHMENT, CONTROL SEDIMENT TRANSPORT AND STABILUZE THE WOW AREA TO THE GREATEST EXTENT <br />POSSIBLE DURING CONSTRUCTION. NONERODBLE MATERIAL SHALL BE USED FOR THE CONSDRUCTIONOF CAUSEWAYS AND COFFERDAMS EARTHEN FILL WAY <br />BE USED FOR THESE STRUCTURES IFARMORF.D BY NONEROOIBLE COVERMATERIALS. <br />14. WHEN A LIVE WATERCOURSE MUST BE CROSSED BY CONSTRUCTION VEHICI.ES,ATE MPORARY STREAM CROSSING CONSTRUCTED OF NONEROOBLE <br />MATERIAL SHALLBE PROVIDED. <br />18. THE BED AND BANKS OF A WATERCOURSE SWILL BE STABILIZED IMMEDIATELY AFTER WORK N THE WATERCOURSE IS COMPLETED. <br />1B. PERIODIC INSPECTION AND MAINTENANCE OF ALL SEDIMENT CONTROL STRLICTURESMUST BE PROVIDED TO ENSURE INTENDED PURPOSE IS ACCONPU5HED. <br />THE DEVELOPER OWNER MDAOR CONTRACTOR SHALL BE CONTINUALLY RESPONSIBLE FOR ALL SEDIMENT LEAVING THE PROPERTY. SEDIMENT CONTROL <br />MEASURES SHALL BE IN WORKING CONDITION AT THE END OF EACH WORKING DAY. <br />17. WHERE CONSTRUCTION VEHICLE ACCESS ROUTES INTERSECT PAVED PUBLIC MADE, PROVISIONS SHALL BE MADE TO MINIMAE THE TRANSPORT OF <br />SFOIMENTSY TRACIOMG ONTO THE PAVED SURFACE, WHERE SEDIMENT 5 TRANSPORTED ONTO A PUBLIC ROAD SURFACE WITH CURBS AND GUTTERS, THE <br />ROAD SMALL BE GLEANED THOROUGHLY AT THE END OF EACH DAY. SEDIMENT SHALL BE REMOVED FROM THE ROADS BY SHOVELING OR SWEEPING AND <br />TRANSPORTED TO A SEDIMENT CONTROL DISPOSAL AREA STREET WASHING SHALL BE ALLOWED ONLYAFTER SEDIMENT IS REMOVED N THIS MANNBt THIS <br />PROVISION SHALLAPPLY TO INDIVIDUAL SUBDIVISION LOTS AS WELL AS TO LARGER LAND-0OWIURBING ACTIVITIES. <br />18. ALL TEMPORARY EROSION AND SEDIMENT CONTROL MEASURES SHALL BE REMOVED WITHIN 30 DAYS AFTER FINAL SITE STABILIZATION OR AFTER THE <br />TEMPORARY MEASURES ARE NO LONGER NEEDED, N TME OPIMON OF THE REVEWER DISTURBED SOILAREAS RESULTING FROM THE DISPOSITION OF <br />TEMPORARY MEASURES SHALL BE PERMANENTLY STABILIZE] TO PREVENT FURTHER EROSION AND SEDIMENTATION. <br />19 PROPERTIES AND WATERWAYS DOWNSTREAM FROM CONSTRUCTION SITE SHALL BE PROTECTED FROM SEDIMENT DISPOSITION ANO EROSION. <br />20. EROSION CONTROL DESIGN AND CONSTRUCTION SHALL FOLLOW THE REQUIREMENTS N INDEX NOS, IDH AND 1050E FOOT ROADWAY AND TRAFFIC DESIGN <br />STANDARDS. <br />21. THE REVIEWER MAY APPROVE MODIRGATIONS OR ALTER PLANS TO THESE EROSION CONTROL CRITERIA DUE TOSITE SPECIFIC CONDITIONS. <br />HISTORIC TRANS -FLORIDA RAIL <br />TRAIL EXTENSION <br />VOXATI COVER COUNTY <br />FLORIDA <br />EROSION CONTROL DETAILS <br />C16 <br />
The URL can be used to link to this page
Your browser does not support the video tag.