Attachment A <br />Financial Project ID (s): 436379-2-54-01 <br />of acceptance or recommendations of the production pile installation is issued in <br />accordance with CPAM. <br />• Inspect and verify the requirements on the Construction Plans and applicable <br />specifications are followed throughout the auger cast pile installation. <br />• Cast cylinders for grout strength testing in accordance with the specifications <br />• Complete the FDOT auger cast pile field installation logs and forward them to the <br />DGE upon completion of the auger cast pile installation. <br />• Verify the quality control processes of the Auger Cast Pile Installation Plan are <br />followed during construction. <br />• Examine the records and evaluate problems encountered during construction and <br />coordinate with the DGE and the Contractor to resolve such problems, including <br />possible withdrawing the Auger Cast Pile Installation Plan approval. <br />10.0 PERSONNEL: <br />10.1 General Reauirements: <br />Provide prequalified personnel necessary to efficiently and effectively carry out its <br />responsibilities under this Agreement. Method of compensation for personnel assigned to <br />this project shall be outlined in Exhibit `B — Lump Sum payment for CCEI Services". <br />Lump Sum costs shall be based upon the assumption of a standard work week as follows: <br />• 7 AM to 5PM Monday through Friday <br />• IRC & FDOT Holidays are to be observed. <br />An hourly burdened rate schedule is to be provided for the purpose of billing the <br />Contractor, at the discretion of the IRC Public Works Director or their designee, for work <br />outside of normal work hours, failed tests, or failure to pursue work. <br />10.2 PersonnelOualifications: <br />Provide competent personnel qualified by experience and education. Submit in writing to <br />the Construction Project Manager the names of personnel proposed for assignment to the <br />project, including a detailed resume for each containing at a minimum: salary, education, <br />and experience. The Consultant Action Request form for personnel approval shall be <br />submitted to the Construction Project Manager at least two weeks prior to the date an <br />individual is to report to work. <br />Personnel identified in the Consultant technical proposal are to be assigned as proposed <br />and are committed to performing services under this Agreement. Personnel changes will <br />require written approval from Indian River County. Staff that has been removed shall be <br />replaced by the Consultant within one week of Indian River County notification. <br />Before the project begins, all project staff shall have a working knowledge of the current <br />CPAM and must possess all the necessary qualifications/certifications for fulfilling the <br />duties of the position they hold. Cross training of the Consultant's project staff is highly <br />recommended to achieve a knowledgeable and versatile project inspection team but shall <br />Stage 1, 11 or III A- 16 Version 1.0 <br />