Laserfiche WebLink
Friday, March 10, 2023 <br />0 CONSOR <br />Attachment B <br />Proposed llalfllonl» I Nova <br />Caelucfm Enginesinp and Insi (CEI) Semces for RC -15058 With Ave (Oft St so CR510) <br />2. <br />Oka costa are based on 1 S mos (2 mos overlap tom IRC -1505) <br />IubconsulOnt <br />3. <br />Stalfrg horn and laboratory oats are based on FDOT COG SpeaScakae <br />The Caradno Group <br />TenaomCmaulmnts, Inc. <br />Foundebm & Geotechnical Enpn ownq (FGE) - Geotech <br />SURVEY <br />Unwell Enpineairtp Sdenoss, no - Mat Taking <br />—kops: <br />Betsy Lindsay, Inc MLS) - Survey <br />1. <br />Recover and vady hehonmntsl and verow cmtol <br />2 <br />Perform Pre-cmnucecn am Name of be road right ofway at500-footin*wi. <br />3. <br />Perform Ylo Pre-catstucean eon seem of each offoM proposed ponds. The am sechonswll be taken at 11heml0-pont of the pond in too dreelaw. <br />!. <br />Perform Post con aaesseckansof Ivaroad right ofwoy at 500-kwt ntervak. <br />5 <br />Perform Wo post-onstucOm aces secem of each offour proposed ponds. The eon swoonswill betoken at the mdpont of tw pond in Wo dr000ns. <br />6 <br />Provide temporary benchmarks at 1000fton 60 and one moat ads of nest <br />7 <br />Stake he ROW at 100 slasms and of ROW Ina chappas <br />Scopr. <br />1 <br />D Ied Shane, review PP and In stalaUm oflogs, adsrdled pre-operasoos mseenp, CSL bslnp and on -ate ks demareWetlm shaft <br />r : <br />r r <br />�_ <br />rr <br />hh <br />hr <br />rh <br />rh <br />rr <br />hh <br />hh <br />rr <br />rh <br />rr <br />rr <br />rh <br />nh <br />hh <br />rr <br />rr <br />rh <br />rh <br />:�_ .•. "s •.u�.. <br />��_ <br />rr <br />rr <br />rr <br />hh <br />rh <br />� <br />ih <br />hh <br />�1:� <br />rr <br />rr <br />��14!•�lii•�l'� <br />rd <br />rr <br />rr <br />illi <br />.:.. •••: <br />�®_______�� <br />n <br />rr <br />rh <br />rh <br />rr <br />a <br />rr <br />n <br />®" <br />rn <br />rr <br />�1 <br />2. <br />Oka costa are based on 1 S mos (2 mos overlap tom IRC -1505) <br />IubconsulOnt <br />3. <br />Stalfrg horn and laboratory oats are based on FDOT COG SpeaScakae <br />The Caradno Group <br />TenaomCmaulmnts, Inc. <br />Foundebm & Geotechnical Enpn ownq (FGE) - Geotech <br />SURVEY <br />Unwell Enpineairtp Sdenoss, no - Mat Taking <br />—kops: <br />Betsy Lindsay, Inc MLS) - Survey <br />1. <br />Recover and vady hehonmntsl and verow cmtol <br />2 <br />Perform Pre-cmnucecn am Name of be road right ofway at500-footin*wi. <br />3. <br />Perform Ylo Pre-catstucean eon seem of each offoM proposed ponds. The am sechonswll be taken at 11heml0-pont of the pond in too dreelaw. <br />!. <br />Perform Post con aaesseckansof Ivaroad right ofwoy at 500-kwt ntervak. <br />5 <br />Perform Wo post-onstucOm aces secem of each offour proposed ponds. The eon swoonswill betoken at the mdpont of tw pond in Wo dr000ns. <br />6 <br />Provide temporary benchmarks at 1000fton 60 and one moat ads of nest <br />7 <br />Stake he ROW at 100 slasms and of ROW Ina chappas <br />Scopr. <br />1 <br />D Ied Shane, review PP and In stalaUm oflogs, adsrdled pre-operasoos mseenp, CSL bslnp and on -ate ks demareWetlm shaft <br />