Laserfiche WebLink
WHEREAS, residual from leachate processing performed at the Evaporation Plant <br />("Residual") is collected in roll -off boxes ("Roll -Offs") at the Evaporation Plant by IRSC, and <br />SWDD is responsible for removing the Roll -Offs containing such Residual from their designated <br />location at the Evaporation Plant, transporting the Roll -Offs to the Landfill and disposing of such <br />Residual at the Landfill, transporting the Roll -Offs to the SWDD's on-site Wash Bay Facility (the <br />"WBF") for performance of washouts (as necessary) by IRSC's contractor, and transporting the <br />Roll -Offs back to the Evaporation Plant and replacing the Roll -Offs at their designated location at <br />the Evaporation Plant when such washouts have been completed (such obligations, collectively, <br />the "Residual Obligations"); and <br />WHEREAS, SWDD desires that the Contractor perform the Residual Obligations, and the <br />Contractor desires to perform the Residual Obligations; and <br />WHEREAS, the Contractor and SWDD have mutually agreed to revise the Contract as set <br />forth herein. <br />NOW THEREFORE, in consideration of the mutual undertakings herein and other good <br />and valuable consideration, the receipt and adequacy of which is hereby acknowledged, the parties <br />agree, as follows: <br />Recitals. The above recitals are true and correct and are incorporated herein. <br />2. Scope of Work. The existing Article 1 — SCOPE OF WORK of the Contract is modified <br />to include the following: <br />A. RESIDUAL OBLIGATIONS. The Contractor shall perform the Residual Obligations <br />as follows: <br />a. The Contractor shall remove the Roll -Offs from their designated location at the <br />Evaporation Plant, transport the Roll -Offs to the Landfill and dispose of Residual <br />contained in the Roll -Offs at the Landfill, transport the Roll -Offs to the WBF (if <br />necessary and as directed by IRSC or its contractor) for performance of washouts <br />of the Roll -Offs by IRSC's contractor, and then transport the Roll -Offs back to the <br />Evaporation Plant and replace the Roll -Offs at their designated location at the <br />Evaporation Plant. <br />b. The Contractor shall perform the Residual Obligations within a reasonable time <br />after notification from IRSC or its contractor that such performance is necessary. <br />c. The Contractor shall require its personnel to comply with the standard operating <br />procedures attached hereto as Exhibit A (the "Residual Removal SOPs") when <br />removing Roll -Offs and Residual from the Evaporation Plant. <br />3. Compensation. The existing Article 3 —COMPENSATION of the Contract is modified to <br />include the following: <br />a. Residual Obligation Rates. SWDD and the Contractor agree that beginning on the <br />date of this Twentieth Amendment, and during the Renewal Term, compensation <br />14Q8938 <br />Twentieth Amendment to Contract Page 2 of 6 <br />