My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2023-050A
CBCC
>
Official Documents
>
2020's
>
2023
>
2023-050A
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/17/2023 2:49:11 PM
Creation date
4/17/2023 2:48:18 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Agreement
Approved Date
03/07/2023
Control Number
2023-050A
Agenda Item Number
8.M.
Entity Name
A. Thomas Construction, Inc.
Subject
Agreement for relocation of Lakes Course #10 Tee
Bid Number
2023027
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
16
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Agreement <br />THIS AGREEMENT is by and between INDIAN RIVER COUNTY, a Political Subdivision of the State of Florida <br />organized and existing under the Laws of the State of Florida, (hereinafter called OWNER) and A. Thomas <br />Const. Inc. (hereinafter called CONTRACTOR). OWNER and CONTRACTOR, in consideration of the mutual <br />covenants hereinafter set forth, agree as follows: <br />ARTICLE 1 - WORK <br />CONTRACTOR shall complete all Work as specified or indicated in the Contract Documents. The Work is <br />generally described as follows: <br />Relocation of tee boxes on hole #10 (Lakes Course), installation of cart path and curbing, removal of <br />palm trees and root balls, relocation of irrigation system controller, sodding and grassing. <br />ARTICLE 2 -THE PROJECT <br />The Project for which the Work under the Contract Documents may be the whole or only a part is generally <br />described as follows: <br />Project Name: <br />Bid Number: <br />Project Address: <br />ARTICLE 3 - CONTRACT TIMES <br />3.01 Time of the Essence <br />Relocation of #10 Tee (Lakes) <br />2023027 <br />530073 rd Street, Vero Beach, FL 32967 <br />A. All time limits for Milestones, if any, Substantial Completion, and completion and readiness for final <br />payment as stated in the specifications are of the essence of the Agreement. <br />3.02 Days to Achieve Substantial Completion, Final Completion and Final Payment <br />A. The Work will be completed and ready for final payment on or before the 90th day after the date <br />when the Contract Times commence to run. <br />3.03 Liquidated Damages <br />A. CONTRACTOR and OWNER recognize that time is of the essence of this Agreement and that OWNER <br />will suffer financial loss if the Work is not completed within the times specified in paragraph 3.02 <br />above, plus any extensions thereof allowed in writing as a change order to this Agreement. <br />Liquidated damages will commence for this portion of work. The parties also recognize the delays, <br />expense, and difficulties involved in proving in a legal proceeding the actual loss suffered by OWNER <br />if the Work is not completed on time. Accordingly, instead of requiring any such proof, OWNER and <br />CONTRACTOR agree that as liquidated damages for delay (but not as a penalty), CONTRACTOR shall <br />pay OWNER $388.00 for each calendar day that expires after the time specified in paragraph 3.02 <br />
The URL can be used to link to this page
Your browser does not support the video tag.