My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1984-030
CBCC
>
Resolutions
>
1980'S
>
1984
>
1984-030
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/18/2023 2:04:49 PM
Creation date
4/18/2023 2:04:25 PM
Metadata
Fields
Template:
Resolutions
Resolution Number
1984-030
Approved Date
05/02/1984
Subject
Approving the Final Order for Hutchinson Utilities Inc. as recommended by Staff
with modification in Par. 7 as suggerstrd by County Attorney
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
21
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
111 <br />T�: The Honorable Members of th®AiE: April 30, 1984 FILE: <br />Board of County Commissioners <br />II <br />n <br />TNROUGH:IMkGFIk1E GTT, <br />NNiiroli IIIISTRATOR SUBJECT: FINAL ORDER — <br />HUTCHINSON UTILITIES, INC. <br />FROM: Terrilm o RFF�RGhw`S. A) Consultant's Opinion <br />Utility Services Directoi B) Final Order <br />DESCRIPTION AND CONDITIONS: <br />The Board instructed the Utility Staff to hire a consultant to <br />evaluate the request for a change in rates requested by Hutchinson <br />Utilities, Inc., on January 18, 1984. <br />This consultant, Mr. Warren E. Silverman, has evaluated and reviewed <br />the books and records of Hutchinson Utilities, Inc. His findings <br />are attached as Exhibit "A". <br />ALTERNATIVES AND ANALYSES: <br />Consultant is of the opinion that the requested rates are fair <br />and reasonable; the rate of return shall be 12.449 which includes <br />an unweighted return on equity capital of 15.7%; that the <br />authorized rate of return be applied to the net rate base of <br />$217,368; that the Utility is authorized to design tariffs so as <br />to generate $222;652 in gross Wastewater revenues from customers <br />enrolled as of December 31, 1983; and that the Utility be permitted <br />to include in its allowable costs rate case ,expense deferred in the <br />current case amounting to $17,835. <br />RECOMMENDATION: <br />Staff recommends that the consultant's opinion and final order <br />be accepted by the Board and that the Board authorize the Chairman <br />to sign the attached final order(Exhibit "B"). <br />
The URL can be used to link to this page
Your browser does not support the video tag.