My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1984-039
CBCC
>
Resolutions
>
1980'S
>
1984
>
1984-039
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/18/2023 2:51:55 PM
Creation date
4/18/2023 2:51:45 PM
Metadata
Fields
Template:
Resolutions
Resolution Number
1984-039
Approved Date
06/06/1984
Subject
Approving the Preliminary Assessment Roll for SR 60 Waterline, prepared by the engineers
for assessable water distribution improvements in IRC; fixing the time & place for an
equalization hearing on the preliminary assessment roll
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
9
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
issuance of revenue bonds by the County (hereinafter called <br />"Project"). <br />The Project will be constructed in the following unin- <br />corporated area of the County: Water line from Oslo Road to <br />43rd Avenue north to 8th or 12th Street, then west. to Kings High- <br />way, then north to St. Road 60, water tower to be constructed <br />along route of water line. <br />The Board has examined the assessment roll and has <br />determined that a portion of the entire cost of the Project in <br />the amount of $2,050,000 shall be assessed against the properties <br />specially benefited thereby. The Board has approved the preliminary <br />assessment roll as required by law. The description of each pro- <br />perty to be assessed and the amount to be assessed to each parcel <br />of property may be ascertained at the office of the Clerk of the <br />Board. <br />The special assessments to be levied against the proper- <br />ties specially benefited from the Project may be paid in cash in <br />not exceeding 10 equal yearly installments with interest at a rate <br />not to exceed 1% above the interest rate on the bonds of notes, as <br />the case may be, to be issued to finance the cost of the Project. <br />If the special assessments are not paid when due, there shall be <br />added a penalty at the rate of 1% per month until paid; provided, <br />however, that such assessments may be prepaid at any time within <br />30 days after the Project is completed and a resolution accepting <br />the same has been adopted by the Board, but such prepaid assessments <br />shall bear interest at the rate borne by the bonds or the notes, as <br />the case may be, described above, and shall include, if deemed <br />necessary by the Board, a prepayment fee not to exceed the applicable <br />redemption premium, if any, for such notes or bonds, as the case may <br />be, if they were to be redeemed on the next available redemption date. <br />The special assessments shall be levied against such benefited pro- <br />perties on an available tap basis to the properties receiving benefit <br />by virtue of the availability of potable water. Any special. assess- <br />-3- <br />
The URL can be used to link to this page
Your browser does not support the video tag.