My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1984-069
CBCC
>
Resolutions
>
1980'S
>
1984
>
1984-069
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/21/2023 10:10:12 AM
Creation date
4/21/2023 10:09:43 AM
Metadata
Fields
Template:
Resolutions
Resolution Number
1984-069
Approved Date
09/26/1984
Subject
Amending the GDU water 7 sewer franchise agreement to increase the main extension
service availability charges & adopt the main extension service availability policy
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
24
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
40 <br />•• <br />General Development Utilities, Inc. First Revised Sheet No. 5.0 <br />Vero Shores and Vero Beach Highlands Cancels Original Sheet No. 5.0 <br />Division <br />offsite line capacity as set forth in the agreement. If, for example, the <br />contributor shall calculate demand of 350 gallons of water per day per - <br />single family residence, that capacity will be '.uilt or reserved for the <br />contributor. Utility will not be obligated to provide capacity or service <br />in excess of that allocation and may require consumers to curtail use which <br />exceeds such allocated capacity. <br />In those areas where the experience of Utility has demonstrated that the <br />demand characteristics of customers of the community exceed those daily <br />rated gallons of demand set forth in Exhibit A, Utility shall require that <br />the contributor pay those fees and make the necessary commitments Leased on <br />the actual and experienced demand, and not the average demand. Thus, when <br />Utility shall demonstrate to the developer that its records and experience <br />show, for example, that a single-family residence of the type which the <br />contributor proposes to build in the specific community places demand <br />during certain times of the year equal to 600 gallons of water per day, <br />then the charges per gallons demand set forth in Paragraph 3.0 of this <br />Policy shall be multiplied by 600 gallons. In no event shall Utility be <br />required to build or accept plans, specifications, fees, charges or <br />agreements predicated upon demand for water service of less than 215 <br />gallons per single-family residential equivalent or sewer service or less <br />than 200 gallons per residential equivalent per day. (25-10.121(13, F.A.C.) <br />7.0 WATER SERVICE ONLY - SEWER SERVICE ONLY <br />In any instance where either water or sewer service only is furnished <br />without the companion service, then the connection (plant capacity) charge <br />shall be computed for that service only. <br />8.0 WATER METER INSTALLATION FEES <br />Meter Size <br />Charge <br />Maximum Water Use Demand <br />5/8" x 3/4" <br />$150.00 <br />20 <br />gallons per <br />minute <br />1it <br />1-1/2" <br />200.00 <br />50 <br />gallons per <br />minute <br />300.00 <br />100 <br />gallons per <br />minute <br />211 <br />400.00 <br />160 <br />gallons per <br />minute <br />Gordon J. Pfersich <br />Senior Vice President <br />VS SERVICE AVAILABILITY <br />
The URL can be used to link to this page
Your browser does not support the video tag.