My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1984-069
CBCC
>
Resolutions
>
1980'S
>
1984
>
1984-069
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/21/2023 10:10:12 AM
Creation date
4/21/2023 10:09:43 AM
Metadata
Fields
Template:
Resolutions
Resolution Number
1984-069
Approved Date
09/26/1984
Subject
Amending the GDU water 7 sewer franchise agreement to increase the main extension
service availability charges & adopt the main extension service availability policy
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
24
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
40 <br />40 <br />6• <br />GENERAL DEVELOPMENT UTILITIES, INC. First Revised Sheet No. 8.0 <br />VERO SHORES AND VERO BEACH HIGHLANDS Cancels Original Sheet No.8.0 <br />DIVISION <br />12.0 INSPECTION OF PLUMBER'S HOOK-UP <br />It shall be the responsibility of the contributor or its plumbing <br />contractor to connect contributor's plumbing installation with the <br />water or sewer system. Utility reserves the right to inspect all <br />such connections to be assured that the same are properly made in <br />accordance with Utility's rules governing such connections, and <br />that the connection, as made, is free from infiltration. <br />The contributor shall notify Utility of any proposed <br />interconnection with the facilities of Utility, and connection <br />may be made without the presence of Utility's inspector. However, <br />such connection shall remain open until inspection by Utility and <br />until notice of the approval of such connection is furnished to <br />the developer in accordance with the practices and procedures of <br />Utility. Any connection covered without the benefit of inspection <br />will result in the contributor being required to reopen the <br />connection for subsequent inspection. If Utility fails to inspect <br />the connection within 48 hours after notice that the same is ready <br />to inspect, the connection shall be deemed approved by Utility. <br />13.0 ADJUSTMENT PROVISIONS <br />Governmental Authority: The charges set forth in this Policy are <br />subject to adjustment by appropriate action of the governmental <br />agency having jurisdiction of this Policy, either upon the <br />initiative of the governmental agency or by request of Utility. <br />(25-10.141, F.A.C.) <br />14.0 PRIOR POLICY <br />Prior to the adoption of this Policy, Utility had established <br />other policies which will remain in effect until the obligations <br />pursuant to those policies have been fulfilled. Under those <br />policies, Utility is committed to provide water service to <br />approximately 270 lots and to provide sewer service to approxi- <br />mately 270 lots upon payment of a charge which may be less than <br />the charges established in this Policy. The difference between <br />the charges actually collected for lots subject to those prior <br />policies and the amount which would have been charged under this <br />Policy is borne by Utility as an investment. The amount so <br />invested by utility for connections made on and after the effec- <br />tive date of this Policy may be treated for ratemaking purposes as <br />a contribution in aid of construction rather than as an investment <br />by Utility. These commitments by Utility were based upon con- <br />tracts made in the past and are not available to <br />VERO SERVICE AVAILABILITY <br />(Continued to Sheet No. 9.0) <br />Gordon J. Pfersich <br />Senior Vice President <br />
The URL can be used to link to this page
Your browser does not support the video tag.