Laserfiche WebLink
• <br />s <br />s• <br />SEAGROVE WEST <br />Summary <br />(as of 1/85) <br />WORK TO DATE IN PLACE: <br />1. Grading (80% complete) <br />2. 8" P.V.C. Sewer (50% <br />complete) <br />3. Lift Station (308 com- <br />plete) <br />TOTAL WORK COMPLETED TO DATE: <br />GRAND TOTAL <br />Cost Estimate: <br />Less Work in Place: <br />Work to be bonded: <br />x 1.15 <br />0.8 x 10,000 <br />0.5 x 62,220 <br />0.2964 x 17,500 <br />$481,854.83 <br />- 44,297.23 <br />$437,557.60 <br />$503,191.24 <br />r_ .0b <br />$ 8,000.00 <br />31,110.00 <br />5,187.23 <br />$44,297.23 <br />3� <br />