Laserfiche WebLink
Work Order #14 — Bowman Consulting Group <br />IRCDUS 24 -inch Forcemain Replacement <br />SPECIFIC EXCLUSIONS <br />The scope of work is limited that described above. Additional professional services may be provided by <br />amendment to this work order. The following items are specifically excluded in the above Scope of <br />Services/Compensation: <br />A. Permit application fees (i.e.: FWC and FDEP; <br />B. As -Built Survey/Record Drawings. <br />EXHIBIT B — FEE SCHEDULE <br />Bowman will provide the services described above for the following lump sum fees: <br />Task 1—Special Purpose Survey $ 14,290.00 <br />Task 2 — Listed Species Survey $ 4,370.00 <br />Task 3 — Subsurface Soils Exploration $ 5,520.00 <br />Task 4 — Engineering Design $ 36,950.00 <br />Task 5 — Permitting (FDEP) $ 1,600.00 <br />Task 6 — Bid Documents & Bid Assistance $ 4,500.00 <br />Task 7 — Construction Observation & Certification: $ 21.000.00 <br />Total: $ 88,230.00 <br />EXHIBIT C —TIME SCHEDULE <br />This Task Order shall commence upon Notice to Proceed (NTP) with the work to be completed as follows: <br />Task 1— Special Purpose Survey 30 days <br />Task 2 — Listed Species Survey 30 days <br />Task 3 —Subsurface Soils Exploration 30 days <br />Task 4 — Engineering Design 30 days following Tasks 1-3 <br />Task 5 — Permitting (FDEP) 30 days <br />Task 6 — Bid Documents & Bid Assistance 30 days following Task 4 <br />Task 7 — Construction Observation & Certification: Estimated 90 days from Contractor's NTP <br />Total: 90 days plus Construction <br />Page 4 of 4 <br />