My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2023-046B
CBCC
>
Official Documents
>
2020's
>
2023
>
2023-046B
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/27/2023 2:40:40 PM
Creation date
4/27/2023 2:40:17 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Work Order
Approved Date
02/21/2023
Control Number
2023-046B
Agenda Item Number
8.T.
Entity Name
Bowman Consulting Group, Ltd.
Subject
Bowman Consulting Group, Ltd. Work Order 14 for Replacement of the NWWTF 24” Force Main
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
4
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Work Order #14 — Bowman Consulting Group <br />IRCDUS 24 -inch Forcemain Replacement <br />SPECIFIC EXCLUSIONS <br />The scope of work is limited that described above. Additional professional services may be provided by <br />amendment to this work order. The following items are specifically excluded in the above Scope of <br />Services/Compensation: <br />A. Permit application fees (i.e.: FWC and FDEP; <br />B. As -Built Survey/Record Drawings. <br />EXHIBIT B — FEE SCHEDULE <br />Bowman will provide the services described above for the following lump sum fees: <br />Task 1—Special Purpose Survey $ 14,290.00 <br />Task 2 — Listed Species Survey $ 4,370.00 <br />Task 3 — Subsurface Soils Exploration $ 5,520.00 <br />Task 4 — Engineering Design $ 36,950.00 <br />Task 5 — Permitting (FDEP) $ 1,600.00 <br />Task 6 — Bid Documents & Bid Assistance $ 4,500.00 <br />Task 7 — Construction Observation & Certification: $ 21.000.00 <br />Total: $ 88,230.00 <br />EXHIBIT C —TIME SCHEDULE <br />This Task Order shall commence upon Notice to Proceed (NTP) with the work to be completed as follows: <br />Task 1— Special Purpose Survey 30 days <br />Task 2 — Listed Species Survey 30 days <br />Task 3 —Subsurface Soils Exploration 30 days <br />Task 4 — Engineering Design 30 days following Tasks 1-3 <br />Task 5 — Permitting (FDEP) 30 days <br />Task 6 — Bid Documents & Bid Assistance 30 days following Task 4 <br />Task 7 — Construction Observation & Certification: Estimated 90 days from Contractor's NTP <br />Total: 90 days plus Construction <br />Page 4 of 4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.