Laserfiche WebLink
SECTION 00520 - Agreement <br />THIS AGREEMENT is by and between INDIAN RIVER COUNTY, a Political Subdivision of the <br />State of Florida organized and existing under the laws of the State of Florida, (hereinafter called <br />OWNER) and Indian River Docks, 1-1C (hereinafter called CONTRACTOR). <br />OWNER and CONTRACTOR, in consideration of the mutual covenants hereinafter set forth, agree <br />as follows: <br />ARTICLE 1 -WORK <br />1.01 CONTRACTOR shall complete all Work as specified or indicated in the Contract <br />Documents. The Work is generally described as follows: <br />The PROJECT entails (a) removal of the existing Pontoon Boat Dock, and (b) new dock <br />construction with water and electric service, an entrance gate, and adjacent sidewalk. <br />ARTICLE 2 - THE PROJECT <br />2.01 The Project for which the Work under the Contract Documents may be the whole or only a <br />part is generally described as follows: <br />Project Name: <br />Replacement Pontoon Boat Dock at the Environmental <br />Learning Center <br />County Project Number: <br />N/A <br />FM Number: <br />NIA <br />Bid Number: <br />2023021 <br />Project Address: <br />255 Live Oak Drive <br />Vero Beach, FL 32963 <br />ARTICLE 3 - ENGINEER <br />3.01 The Indian River County Public Works Department is hereinafter called the ENGINEER and <br />will act as OWNER's representative, assume all duties and responsibilities, and have the <br />rights and authority assigned to ENGINEER in the Contract Documents in connection with <br />the completion of the Work in accordance with the Contract Documents. <br />ARTICLE 4 - CONTRACT TIMES <br />4.01 Time of the Essence <br />A. All time limits for Milestones, if any, Substantial Completion, and completion and readiness <br />for final payment as stated in the Contract Documents are of the essence of the Contract. <br />4.02 Days to Achieve Substantial Completion, Final Completion and Final Payment <br />A. The Work will be substantially completed on or before the 90 calendar days after the date <br />when the Contract Times commence to run as provided in paragraph 2.03 of the General <br />Conditions, and completed and ready for final payment in accordance with paragraph 14.07 <br />of the General Conditions on or before the 120 calendar day after the date when the <br />Contract Times commence to run. <br />00520-1 <br />