My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2023-072
CBCC
>
Official Documents
>
2020's
>
2023
>
2023-072
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/28/2023 10:24:51 AM
Creation date
4/28/2023 10:24:16 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Work Order
Approved Date
04/18/2023
Control Number
2023-072
Agenda Item Number
8.K.
Entity Name
Edlund, Dritenbas, Binkley Architects & Associates, Inc.
Subject
Architectural Services Work Order 9 for New Victor Hart Sr. Complex Restroom/Concession Building,
RFQ 2018063
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
5
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
EDLUND • DRITENBAS • BINKLEY <br />ARCHITECTS AND ASSOCIATES, P.A. <br />65 Royal Palm Pointe, Ste D <br />Vero Beach, FL 32960 <br />Ph: (772) 569-4320 Fax (772) 569-9208 <br />April 4, 2023 <br />TO: Indian River County Parks & Recreation <br />Attn: Joseph Tilton <br />RE: Proposal for Architectural Services Victor Hart Park Restroom <br />Architects Comm. 4010423VB <br />Dear Sir: <br />This letter shall serve as our proposal and agreement for the preparation of documents necessary <br />for building construction of the above referenced project. <br />I. SCOPE <br />The scope of work will consist of providing design and construction documents for a men and <br />women's public restroom approximately 950 S.F. The previously completed Hallstrom <br />House/I lobart Restrooms plans will be enlarged for space for four water closets in women's <br />restroom and two water closets/two urinals in men's restroom. <br />11. ARCHITECTS BASIC SERVICES <br />The Architect shall provide bill pen -nit documents for construction to be constructed by <br />subcontractors or general contractor of the Owner's choice. Documents and services provided by <br />the Architect and his employed Structural, Mechanical. Electrical and Plumbing Engineering <br />sub -consultants will include the following: <br />1) Data collection, additional field verifications, and meetings with Owner, if needed. <br />2) Construction documents, including all necessary plans for building permit <br />submission. <br />3) Provide electrical design for new lift station to serve this building, and coordinate <br />with FPL to provide electric service design for this project. <br />4) Address plan review comments and make revisions as required. <br />5) Assist in obtaining construction bids, bidding administration, and addendums as <br />needed. <br />6) Construction administration shall include a preconstruction meeting periodic <br />construction observations twice monthly, construction meeting with Owner and G.C.. <br />RFI responses. submittals review, review of pay applications and any changes in the <br />work. A punch list and final inspection will also be done. <br />
The URL can be used to link to this page
Your browser does not support the video tag.