My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2023-053C
CBCC
>
Official Documents
>
2020's
>
2023
>
2023-053C
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/28/2023 12:11:35 PM
Creation date
4/28/2023 12:08:27 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Change Order
Approved Date
03/07/2023
Control Number
2023-053C
Agenda Item Number
15.B.6.
Entity Name
Crom Corporation
Subject
Change Order for wall pipe and concrete pipe supports at the Solid Waste Disposal District Landfill
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
3
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
February 9, 2023 <br />Via Email jill.grimaldi@kimley-horn.com <br />Jill Grimaldi <br />Kimley Horn <br />445 24th Street, Suite 200 <br />Vero Beach, Florida 32960 <br />Subject: Change Order Proposal No. 2 — Wall Pipe and Concrete Pipe Supports <br />PO# 90543-00 — Indian River County SWDD Landfill Division <br />CCR Job No. 2021 R044 <br />Dear Ms. Grimaldi: <br />CROM Coatings and Restorations ("CCR"), a Division of CROM, LLC, is submitting this change order for the <br />work as described below in accordance with all applicable codes and standards including OSHA, AWWA, <br />SSPC, and NACE standard practices. <br />SERVICES TO BE FURNISHED BY CCR <br />CCR proposes to furnish all supervision, labor, material, and equipment required to complete the work, <br />except as noted in Paragraph 3. The services to be furnished by CCR are specifically: <br />This scope of work is to be performed on the following tank: <br />500,000 -Gallon Ground Storage Tank <br />60'-0" ID x 23'-6" SWD <br />(CROM Job No. 2009-M-015) <br />Work to be deducted under this change order: <br />a. 3 — 8" SS FLG-FLG Wall Pipes through tank wall at manhole elevation. <br />Work to be added under this change order: <br />a. Additional mobilization. <br />b. 1 — 10" SS FLG-FLG Wall Pipes through tank wall at manhole elevation. <br />c. Four SS adjustable pipe supports with new engineered concrete floor pads. <br />d. Two concrete pads underneath the mixer nozzles 2 x 2 x 2. <br />2. COMMENCEMENT AND COMPLETION <br />Upon your execution of this change order, CCR will be prepared to start work 20 days after approval of <br />our submittal information; and will undertake to furnish sufficient labor, materials, and equipment to <br />complete this work within approximately 8 Days working time thereafter. Acceptance of this change <br />order proposal will add the aforementioned time to the current contract duration. <br />3. MATERIALS AND SERVICES FURNISHED BY OTHERS <br />It is understood that the following services shall be provided by others without expense to CCR: <br />a. Adequate access to the tank including open storage space for our equipment and materials, <br />conveniently located near the tank to be repaired. <br />250 S.W. 36TH TERRACE I GAINESVILLE, FLORIDA 1 32807-2889 <br />PHONE 352.372.3436 1 PAX 252.372.62091 WWW.CROMCORP.COM <br />CHATTANOOGA, TN - FORT MYERS, PL - GAINESVILLE, PL - RALEIGH, NC - WEST PALM BEACH, FL <br />
The URL can be used to link to this page
Your browser does not support the video tag.