My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1985-067
CBCC
>
Resolutions
>
1980'S
>
1985
>
1985-067
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/1/2023 11:13:07 AM
Creation date
5/1/2023 11:12:42 AM
Metadata
Fields
Template:
Resolutions
Resolution Number
1985-067
Approved Date
06/19/1985
Subject
Southeast Water & Sewer Company Franchise (Vero Grove)
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
19
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SECTION VII <br />® CERTIFICATION OF OPERATIONS AND MAINTENANCE <br />1. All of the facilities of the Utility shall be constructed in <br />accordance with the plans and specifications approved by the Department <br />40 of Environmental Regulation of the State of Florida and Indian River <br />County Utilities Department. The manner of the manner of collection, <br />treatment and disposal of wastewater shall at all time be and remain not <br />inferior to the quality standards for public sewage collection and other <br />rules, regulations and standards now or hereafter adopted by the <br />• . Department of Environmental Regulation of the State of Florida, or other <br />governmental body having jurisdiction, including Indian River County. <br />2. The Utility shall supply the County with an annual report of <br />operations and maintenance certified by the Utility Engineer who must be <br />registered in the State of Florida. <br />CPrrPTOW VTTT <br />UTILITY'S AUTHORITY TO PROMULGATE NECESSARY PROCEDURES <br />1. The Utility shall have the authority 1.3 promulgate such rules, <br />regulations, terms and conditions covering the conduct of its business as <br />shall be reasonable necessary to enable the Utility to exercise its <br />rights and perform its obligations under this franchise and to issue an <br />uninterrupted service to each and all of its consumers; provided, <br />however, that such rules, regulations, terms and conditions shall not be <br />in conflict with the provisions hereof or with the laws of the State of <br />Florida and all of the same shall be subject to the approval of the <br />Board. <br />2. At all times herein where discretionary power is left with the <br />Board of County Commissioners, the Utility, before discretionary action <br />is taken by the Board of County Commissioners, can request said Board <br />that a group of arbitrators be appointed and such group shall consist of: <br />a) County Utilities Director <br />b) Utility Engineer <br />c) One person selected by the above two persons <br />and this Board of Arbitrators shall make recommendations to the Board of <br />County Commissioners, but such recommendations are not mandatory. Any <br />arbitration shall be in accordance with the Florida Arbitration Code. <br />3. Any final decision the arbitrators or Board may have with <br />respect to this franchise can be appealed to the Circuit Court of Indian <br />River County by either party. <br />SECTION IX <br />DEDICATED EASEMENTS <br />All pipes, pumps, hydrants, mains, valves, blowoffs, sewer mains and <br />manholes and other fixtures laid or placed by the Utility for the <br />wastewater system shall be so located in the dedicated easements in the <br />5 <br />
The URL can be used to link to this page
Your browser does not support the video tag.