My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
03/07/2023
CBCC
>
Meetings
>
2020's
>
2023
>
03/07/2023
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/5/2023 10:24:11 AM
Creation date
5/5/2023 10:14:15 AM
Metadata
Fields
Template:
Meetings
Meeting Type
BCC Regular Meeting
Document Type
Agenda Packet
Meeting Date
03/07/2023
Meeting Body
Board of County Commissioners
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
275
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Contractor's Price Proposal - Detail <br />Date: February 23, 2023 <br />Re: IQC Master Contract #: <br />FL-R10-GC11-111821-JLC <br />Work Order #: <br />108749.01 <br />Owner PO #: <br />Title: <br />Indian River County - Jones Pier Residence- Supplemental # 1 <br />Contractor: <br />Johnson-Laux Construction, LLC <br />Proposal Value: <br />$7,436.93 <br />Sect. Item Mod. <br />uOM Description <br />Line Total <br />Labor Equip. Material (Excludes) <br />Section - 01 <br />1 01 22 23 00 0282 <br />DAY 2,400 LB Capacity, 72" Wide, Skid -Steer Loader With Full -Time Operator <br />$1,966.53 <br />Quantity Unit Price <br />Factor <br />Total <br />Installation 2,00 x 794.75 x <br />12372 - <br />1,966.53 <br />additional time for lifting and transporting footers to dumpster location <br />2 01 74 19 00 0014 <br />EA 20 CY Dumpster (3 Ton) "Construction Debris" Includes delivery of dumpster, <br />$1,652.11 <br />rental cost, pick-up cost, hauling, and disposal fee. Non -hazardous material. <br />Quantity Unit Price <br />Factor <br />Total <br />Installation 2.00 x 667.68 x <br />12372 - <br />1,652.11 <br />Additional dumpsters for footers. <br />17 tons of concrete <br />3 01 74 19 00 0014 0003 <br />MOD For Each Ton Over Indicated Amount, Add <br />$1,412.50 <br />Quantity Unit Price <br />Factor <br />Total <br />Installation 11.00 x 103.79 x <br />1.2372 <br />1,412.50 <br />Subtotal for Section - 01 <br />$5,031.14 <br />Section - 02 <br />4 02 41 16 13 0024 <br />CF Reinforced Concrete Foundation Demolition <br />$2,637.39 <br />Quantity Unit Price <br />Factor <br />Total <br />Installation 234.00 x 9.11 x <br />1.2372 <br />2,637.39 <br />162 CF of 3'x3'x6" footers. 72 CF of 3'x3'x2' footers <br />5 02 41 16 13 0024 0080 <br />MOD For >135 To 405, Deduct <br />-$231.60 <br />Quantity Unit Price <br />Factor <br />Total <br />Installation 234.00 x -0.80 x <br />12372 - <br />-231.60 <br />Subtotal for Section - 02 <br />$2,405.79 <br />Proposal Total <br />$7,436.93 <br />This total represents the correct total for the proposal. Any discrepancy between line totals, <br />sub -totals and the proposal total is due to rounding. <br />Contractor's Price Proposal - Detail Page 1 of 1 <br />93 2123,2023 <br />
The URL can be used to link to this page
Your browser does not support the video tag.