Laserfiche WebLink
CHANGE ORDER NO. 1 <br />DESCRIPTION OF ITEMIZED CHANGES <br />PROJECT NAME: 66TH AVE. AND 8TH STREET SIGNALIZATION IMPROVEMENTS <br />PROJECT NO. IRC -2002 BID NO. 2022007 <br />WCD 1 TRAFFIC ENGINEERING REQUESTED ADDITIONAL EQUIPMENT <br />LS <br />1 <br />4,738.09 <br />4,738.09 <br />WCD 3 <br />327-70-6 ASPHALT PAVEMENT MILLING 1.5 -INCH AVG. DEPTH <br />SY <br />71.50 <br />29.75 <br />2127.13 <br />WCD 3 <br />337-7-83 ASPHALT CONCRETE FC -12.5 TRAFFIC C PG 76-22 1.5 -INCH <br />TN <br />4.94 <br />301.96 <br />1,491.68 <br />630-2-12 CONDUIT SIGNAL) (F&I) (DIRECTIONAL BORE <br />LF <br />45.00 <br />29.35 <br />1,320.75 <br />635-2-11 PULL BOX (F&I) (TRAFFIC SIGNAL <br />EA <br />7 <br />1,534.00 <br />10 738.00 <br />FA FORCE ACCOUNT <br />LS <br />1 <br />50,000.00 <br />50 000.00 <br />SUBTOTALS <br />1 <br />1 8,356.90 <br />1 62,058.75 <br />NET DECREASE OF CONTRACT AMOUNT TOTAL <br />I $ 53,701.85 <br />137 <br />F:WuDlic Worim ENGINEERING DIVISION PROJECTS000288th Ave sd 8N St SignWcmWnkl-AdminWgende ltemsPmject ClossouNRC-2002_COt ITEM_CFIANOES_20230307 <br />