Laserfiche WebLink
COST OF CONS'PRUCTION OF llE;UIC.A i'iill WORK <br />FOR <br />- STIRLING LAKE ESFATES SUBDIVI BION <br />SITE WORK <br />Roadway and Swale Grading <br />- $ 2,675.00 <br />Sodding <br />= $ 270.00 <br />Seed and Mulch <br />= $ 3,000.00 <br />WATER DISTRIBUTION <br />6" P.V.C. Watermain <br />= $10,428.75 <br />8" D.I.P. Watermain <br />= $ 700.00 <br />8" P.V.C. Watermain <br />- $ 5,214.00 <br />20" X 811 f;.J. Wet Tap <br />= $ 2,770.00 <br />Blow Off <br />= $ 250.00 <br />Fire Hydrant <br />e $ 1,275.00 <br />1-1/2" Double Service <br />= $ 4,235.00 <br />P.V.C. Casing Pipe <br />= $ 270.00 <br />Hardware <br />= $ 2,250.00 <br />Open Cut Oslo Road <br />= $ 2,882.50 <br />Gate Valves <br />- $ 1,950.00 <br />DRATNAGE <br />12" CMP <br />$ 1,130.50 <br />1811 CMP <br />= $ 975.00 <br />Inlet <br />» $ 525.00 <br />Rip Rap Head Wall_ <br />$ 600.00 <br />PAVING <br />1" Asphalt <br />- $ 7,3?5.80 <br />Base <br />$10,877.30 <br />S ubgrade <br />_ $ 4,010.50 <br />Header Curbs <br />- $ 1,960.00 <br />TOTAL <br />= $65,624.35 <br />257 of the Construction <br />Cost <br />- $16,406.08 <br />Say <br />- $16,406.00 <br />NOTE: Seeding around the lake is not within <br />the <br />dedicated area <br />and therefore, is not included within the seed <br />and <br />mulch work. <br />CERTIFICATION <br />This is to certify that this cost estimate was prepared under my <br />direction and represents a true and accurate estimate of the cost <br />of improvements within the dedicated right-of-way associated with <br />the subject property and improvements constructed under the Land <br />Development Permit for this project. <br />/ !lc( 1111\�2L 11 �(_(•l, � <br />Michael P. Walther, P.L. <br />Florida P.E. # 32081 <br />(SEAL) <br />j COASTAL. TECH COASTAL STm ICTINiAL CIVIL LWMECHING ANO n-ANNINQ <br />