My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1986-035
CBCC
>
Resolutions
>
1980'S
>
1986
>
1986-035
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/10/2023 12:47:16 PM
Creation date
5/10/2023 12:46:45 PM
Metadata
Fields
Template:
Resolutions
Resolution Number
1986-035
Approved Date
06/18/1986
Subject
Providing for acquisition & construction of additions, extension & improvements to the combined
water & sewer system of IRC; authorizing the issuance by such county of not exceeding
$9,200,000 water & sewer revenue bonds
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
26
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
U <br />,,.�� <br />Series 1980 (South County Water System), dated Septeirher 30, 1982; and Water and <br />Sewer Revenue Bonds, Series 1982, dated April 30, 1985, of the Issuer. <br />"Pledged Funis" shall mean the Gross Revenues. <br />"Project" shall mean the additions, extensions and improvements to the <br />System to be acquired and constructed pursuant to the authorization contained in <br />this Instrument in accordance with certain plans and specifications now on file <br />with the Clerk. <br />1.02 Authority for this Instrument. This Instrument is adopted <br />pursuant to the provisions of Ch. 159, Fla. Stat. (1985), and other applicable <br />provisions of law, and pursuant to Subsection 3.04(J) of the Original <br />Resolution, and is supplemental to the Original Resolution. <br />1.03 Findings. It is hereby found and determined that: <br />(A) The Issuer presently owns and operates a combined water and sewer <br />system for the benefit of its inhabitants, and the Project is necessary for the <br />continued preservation of the health, welfare, convenience and safety of the <br />Issuer and its inhabitants. <br />(B) The Issuer has been advised by its consulting engineers and it is <br />hereby found and determined that the estimated Cost of the Project is $9,200,000 <br />which shall be paid with the proceeds of the sale of the Bonds. <br />- 3 - <br />
The URL can be used to link to this page
Your browser does not support the video tag.