My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2023-059A
CBCC
>
Official Documents
>
2020's
>
2023
>
2023-059A
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/15/2023 9:35:15 AM
Creation date
5/15/2023 9:33:09 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Developer's Agreement
Approved Date
03/28/2023
Control Number
2023-059A
Agenda Item Number
8.W.
Entity Name
Griffon Residences, LLC
Subject
Developer’s Agreement for the construction of Lift Station Improvements
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
10
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1. Improvements to Existing Lift Station 5: <br />The DEVELOPER and COUNTY shall construct improvements to existing Lift Station 5 described herein as <br />directed by the Indian River County Utilities Department. The DEVELOPER shall provide and/or reimburse <br />the COUNTY the total sum of the material, equipment, and labor for the project as described in Section <br />1C: <br />A. Lift Station Improvements <br />The COUNTY and the DEVELOPER shall share in the construction of lift station improvements as <br />follows: <br />- The COUNTY's obligations are as follows: <br />o Temporary by-pass pumping during construction. <br />o Remove the existing Flygt CP -3201 Duplex Pumps rated at 322 GPM with 29 HP <br />motors in the existing wet well and install new Duplex NP 3202/460 45HP Flygt <br />pumps. <br />o Install a liner system (i.e.: Green Monster Liner or equal) in the existing concrete wet <br />well. <br />o Remove existing and install new pump control floats, pump bases, pump guide rails <br />with mounting brackets and accessories. <br />o Remove existing and install new wet well top slab with hatch covers. <br />o Remove existing and install new electrical duplex pump control panel. New panel will <br />provide soft start pump provisions for each 45 HP pump motor and time delay relay <br />to prevent both pumps starting simultaneously. <br />o Remove existing standby generator and automatic transfer switch and replace with <br />new standby generator and automatic transfer switch properly sized for the duplex <br />45HP motors. COUNTY shall retain ownership of the existing generator. <br />o Provide 8" connection valve adjacent to existing structure for new 8" force main <br />- The DEVELOPER's obligations are as follows: <br />o Construct new 8" discharge force main approximately 1,400 LF in length and parallel <br />to the existing 6" force main. The new 8" force main will wet tap into the existing <br />force main per the approved construction plans. <br />o Abandon the existing 6" force main after the new 8" force main is placed into <br />operation. <br />o Provide to the COUNTY and/or its assigned contractor the materials and equipment <br />identified in Exhibit "A". <br />All improvements shall comply with Indian River County Department of Utility Services (IRCDUS) <br />Water & Wastewater Utility Standards, May 2019 or latest edition. <br />B. Developer Cost Items <br />-Page 2 - <br />F \UTILITIES\00_LMLITY . AGENDA TEMPLATE & GUIDELINES\2023 AGENDA ITEMS\032823\GRIFFON DEVELOPERS AGREEMENI121f/109 DEV AGREEMENT GRIFFON REV 022223. DOCX <br />
The URL can be used to link to this page
Your browser does not support the video tag.