Laserfiche WebLink
1. Improvements to Existing Lift Station 5: <br />The DEVELOPER and COUNTY shall construct improvements to existing Lift Station 5 described herein as <br />directed by the Indian River County Utilities Department. The DEVELOPER shall provide and/or reimburse <br />the COUNTY the total sum of the material, equipment, and labor for the project as described in Section <br />1C: <br />A. Lift Station Improvements <br />The COUNTY and the DEVELOPER shall share in the construction of lift station improvements as <br />follows: <br />- The COUNTY's obligations are as follows: <br />o Temporary by-pass pumping during construction. <br />o Remove the existing Flygt CP -3201 Duplex Pumps rated at 322 GPM with 29 HP <br />motors in the existing wet well and install new Duplex NP 3202/460 45HP Flygt <br />pumps. <br />o Install a liner system (i.e.: Green Monster Liner or equal) in the existing concrete wet <br />well. <br />o Remove existing and install new pump control floats, pump bases, pump guide rails <br />with mounting brackets and accessories. <br />o Remove existing and install new wet well top slab with hatch covers. <br />o Remove existing and install new electrical duplex pump control panel. New panel will <br />provide soft start pump provisions for each 45 HP pump motor and time delay relay <br />to prevent both pumps starting simultaneously. <br />o Remove existing standby generator and automatic transfer switch and replace with <br />new standby generator and automatic transfer switch properly sized for the duplex <br />45HP motors. COUNTY shall retain ownership of the existing generator. <br />o Provide 8" connection valve adjacent to existing structure for new 8" force main <br />- The DEVELOPER's obligations are as follows: <br />o Construct new 8" discharge force main approximately 1,400 LF in length and parallel <br />to the existing 6" force main. The new 8" force main will wet tap into the existing <br />force main per the approved construction plans. <br />o Abandon the existing 6" force main after the new 8" force main is placed into <br />operation. <br />o Provide to the COUNTY and/or its assigned contractor the materials and equipment <br />identified in Exhibit "A". <br />All improvements shall comply with Indian River County Department of Utility Services (IRCDUS) <br />Water & Wastewater Utility Standards, May 2019 or latest edition. <br />B. Developer Cost Items <br />-Page 2 - <br />F \UTILITIES\00_LMLITY . AGENDA TEMPLATE & GUIDELINES\2023 AGENDA ITEMS\032823\GRIFFON DEVELOPERS AGREEMENI121f/109 DEV AGREEMENT GRIFFON REV 022223. DOCX <br />