My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2023-059A
CBCC
>
Official Documents
>
2020's
>
2023
>
2023-059A
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/15/2023 9:35:15 AM
Creation date
5/15/2023 9:33:09 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Developer's Agreement
Approved Date
03/28/2023
Control Number
2023-059A
Agenda Item Number
8.W.
Entity Name
Griffon Residences, LLC
Subject
Developer’s Agreement for the construction of Lift Station Improvements
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
10
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Exhibit "B'I <br />(561) 640-3503 - Phone <br />Hinterland Group. Inc. <br />2051 W Blue Heron Blvd <br />Riviera Beach, FL 33404 <br />ALL PO's/Contractual Issuances are to be emailed to infoo(�hinterlandgrouricom <br />or <br />c r.?3 u <br />ADDRESS <br />Indian River County <br />Harrison Youngblood <br />hvoun¢bl ood.r2,,irceov. com <br />JOB NAME: LS #5 Rehab/The Griffon <br />Line Item #3 - Mobilization/Demobilization <br />1 <br />LS <br />$1,701.90 <br />$1,701.90 <br />Line Item #6 - Video Recording, Pre Construction <br />1 <br />LS <br />$680.76 <br />$680.76 <br />Line Item #8 - Trench Safety and Confined Space <br />1 <br />LS <br />$113.46 <br />$113.46 <br />Line Item #19 - Construction Warning Fence <br />30 <br />DAY <br />$56.73 <br />$1,701.90 <br />Line Item #33 - 6" By -Pass Pumping Initial Setup <br />1 <br />EA <br />$340.38 <br />$340.38 <br />Line Item #34 - 6" Bypass Pumping Operation <br />28 <br />DAY <br />$794.22 <br />$22,238.16 <br />Line Item #42 - Force Main Installation <br />40 <br />LF <br />$73.75 <br />$2,950.00 <br />Line Item #51 - 6" Mega -Lug Joint Restraint <br />7 <br />EA <br />$136.15 <br />$953.05 <br />Line Item #99 - Duplex Remote Terminal Unit (Install Only) <br />1 <br />EA <br />$6,807.60 <br />$6,807.60 <br />Line Item #104 - Duplex Motor Control Panel (Install Only) <br />0.5 <br />EA <br />$70,345.00 <br />$35,172.50 <br />Line Item #112 - 6" Plug Valve <br />3 <br />EA <br />$1,588.44 <br />$4,765.32 <br />Line Item #128 - 6" HDPE Vertical Discharge Pipe <br />2 <br />EA <br />$4,311.48 <br />$8,622.96 <br />Line Item #129 - 6" HDPE Discharge Piping (in Excess of 15 LF) <br />A <br />26 <br />LF <br />$226.92 <br />$5,899.92 <br />Line Item #130 - Horiz. Support Bracket for 6" Discharge Piping <br />1 <br />EA <br />$907.68 <br />$907.68 <br />Line Item #141 - 6" HDPE Discharge Fittings and Adapters <br />6 <br />EA <br />$567.30 <br />$3,403.80 <br />Line Item #146 - 6" Pump Discharge Base (Install Only) <br />1 <br />EA <br />$3,630.72 <br />$3,630.72 <br />Line Item #152 - 3" Pump Guide Rails (Install Only) <br />40 <br />LF <br />$85.10 <br />$3,404.00 <br />Line Item #154 - 3" Guide Rail Upper Support Bracket (Install Only) <br />1 <br />EA <br />$510.57 <br />$510.57 <br />Line Item #160 - 3/4" ST STL Lifting Chain (Install Only) <br />20 <br />LF <br />$73.75 <br />$1,475.00 <br />Line Item #162 - 6 Hook - Stainless Cable Hanger (Install Only) <br />0.5 <br />EA <br />$680.76 <br />$340.38 <br />Line Item #165 - 8' Diam Wet Well Hydroblast <br />700 <br />SF <br />$5.67 <br />$3,969.00 <br />Line Item #168 - Valve Vault Hydroblast <br />146 <br />SF <br />$5.67 <br />$827.82 <br />Line Item #171 - 8' Diam Wet Well Coal Slag Blast <br />700 <br />SF <br />$5.67 <br />$3,969.00 <br />Line Item #174 - Valve Vault Coal Slag Blast <br />146 <br />SF <br />$5.67 <br />$827,82 <br />Line Item #178 - 8' Diameter Wet Well Calcium Aluminate Coating <br />700 <br />SF <br />$22.69 <br />$15,883.00 <br />Line Item #181 - Valve Vault, Calcium Aluminate Coating <br />146 <br />SF <br />$22.69 <br />$3,312.74 <br />Line Item #193 - Cast In Place Concrete <br />150 <br />CF <br />$56.73 <br />$8,509.50 <br />Line Item #193 - Form Work for Cast In Place Concrete <br />85 <br />SF <br />$56.73 <br />$4,822.05 <br />Line Item #194 - Reinforcing Steel for Cast In Place Concrete <br />150 <br />LB <br />$11.35 <br />$1,702.50 <br />Line Item #204 - 4" PVC J -Vent w/ Riser & St Stl Bug Screen <br />1 <br />EA <br />$567.30 <br />$567.30 <br />Line Item #219 - Vacuum Truck <br />16 <br />HR <br />$255.29 <br />$4,084.64 <br />
The URL can be used to link to this page
Your browser does not support the video tag.