My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2023-081
CBCC
>
Official Documents
>
2020's
>
2023
>
2023-081
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/23/2023 10:39:18 AM
Creation date
5/23/2023 10:27:37 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Change Order
Approved Date
05/02/2023
Control Number
2023-081
Agenda Item Number
8.J.
Entity Name
TLC Diversified, Inc.
Subject
Change Order No.3 for South County Water Treatment Plant Membrane and Retrofit Project
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
36
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CHANGE ORDER <br />PROJECT: South Oslo Road WTP Improvements No. 3 <br />DATE OF ISSUANCE: aril 19. 2023 EFFECTIVE DATE: <br />OWNER: Indian River County <br />OWNER's Contract No.: 2021026 Project No.: 044572102 <br />CONTRACTOR: TLC Diversified, Inc ENGINEER: Kimley-Horn & Associates, Inc. <br />You are directed to make the following changes in the Contract Documents: <br />1. Rehabilitation of feedwater pumps and bases <br />2. Replacement of feedwater pump suction valves (x5) <br />3. Installation of a 3rd transfer pump motor <br />4. Construction of light pole and receptacle by HSP 4&5 <br />5. Construction of new lab electrical circuits <br />6. Relocation of the electrical conduits in the chemical storage room <br />7. Fiber optic improvements for the Wells <br />8. Grounding investigation per IRCDUS request <br />Attachments: Quotations <br />CHANGE IN CONTRACT PRICE <br />CHANGE IN CONTRACT TIME <br />Original Contract Price <br />Original Contract Times: s <br />$ 10,665,515.65 <br />Substantial Completion: 760 <br />Ready for final payment: 820 <br />Net changes from previous Change Orders <br />Net change from previous Change Orders: <br />No. 1 & 2 $633,584 <br />No. to No. <br />Contract Price prior to this Change Order <br />Contract Time prior to this Change Order <br />$ 11,299,099.65 <br />Substantial Completion: 760 <br />Ready for final payment: 820 <br />Days or dates <br />Net Increase (decrease) in this Change Order <br />Net Increase in this Change Order <br />$ 387,037.72 <br />0 days <br />Contract Price with all approved Change <br />Contract Time with all approved Change <br />Orders <br />Orders <br />$ 11,686,137.37 <br />Substap ipletion: 760 <br />Reac�r>�a��pent: 820 <br />o��: • ?'s ; ays or dates <br />• n <br />RECOMMENDED: APP D. *? AtCGEPTED: <br />Ade- AdAt e- P. E. <br />By: rim/,By. C� ID9 irGL <br />Engineer (Authorized Signature) Owner Auth ized 3t ter, �'Obntractor (Authorized Signature) <br />Date: �'�$�2-3 Date: 05-04-2023 Date: 717- <br />Attest: Jeffrey R. Smith, ClerK o t.. <, -)� I—ED Ae,--, `'� Poi✓ N11 <br />EJ96R .9"" 96!ii i�nr"e' A4,� L AL Si., FFIGIE.I''X( <br />Prepared by the Engineers Joint Contract Documents Committee an ssociated General Contractors of America. <br />ey. I &Y - `fl0 0 <br />Deputy ClerkG,0._0 <br /><OC:UN 1 Y )k TOR,!4F-`1' <br />
The URL can be used to link to this page
Your browser does not support the video tag.