Laserfiche WebLink
Kimley»>Horn <br />INDIAN RIVER COUNTY DEPARTMENT OF UTILITY SERVICES <br />PROGRESS MEETING MINUTES <br />South Oslo Road Water Treatment Plant Improvements <br />DATE: 3/8/2023 @ 9:00 am <br />PLACE: South Oslo WTP <br />Items discussed: <br />Upcoming work: <br />• Laboratory <br />o TLC to contact IRC Building Department for inspection <br />CEOWay : <br />Page 1 <br />o RWB bypass piping in AEREX shop. Delivery 4-6 weeks after release of shop drawing <br />■ TLC to send shop this week for KH review <br />• HSP4&5 <br />o TLC to finish piping <br />• Electrical <br />o VFDs shipping 3/13 <br />■ VFDs will sit in paragon warehouse until install <br />o Switchboard missing 800amp breakers. <br />■ Shipping to paragon factory, breakers will ship separately <br />o Feed water pump (FWP) motors on site <br />o V -port ball valve on site <br />o TLC to provide schedule of values for SCADA part A project <br />o C&W to send CAD for CP 1-4 to CC Controls <br />Shop drawings: <br />o KH to review <br />■ Acid room coatings <br />■ SST Piping <br />■ General arrangement drawings <br />Work change directive: TLC to provide <br />1. lmigkt Role-fer WSW 48-.5 w/ recce *per <br />2.—FWP-Sweden RPVs (5 <br />3 fWR-rehab ine{udimS pimp hates <br />I <br />S. Rebuild ef lost x fer ptim9p amd equip with metei--- <br />7. Repair at Well 3 <br />8 uit ____ute r__ L,..,m iand the room under the proposed CIP system <br />9. West GST 316 SST stanchion pipe support <br />