My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2023-081
CBCC
>
Official Documents
>
2020's
>
2023
>
2023-081
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/23/2023 10:39:18 AM
Creation date
5/23/2023 10:27:37 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Change Order
Approved Date
05/02/2023
Control Number
2023-081
Agenda Item Number
8.J.
Entity Name
TLC Diversified, Inc.
Subject
Change Order No.3 for South County Water Treatment Plant Membrane and Retrofit Project
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
36
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Kimley»>Horn <br />INDIAN RIVER COUNTY DEPARTMENT OF UTILITY SERVICES <br />PROGRESS MEETING MINUTES <br />South Oslo Road Water Treatment Plant Improvements <br />DATE: 3/8/2023 @ 9:00 am <br />PLACE: South Oslo WTP <br />Items discussed: <br />Upcoming work: <br />• Laboratory <br />o TLC to contact IRC Building Department for inspection <br />CEOWay : <br />Page 1 <br />o RWB bypass piping in AEREX shop. Delivery 4-6 weeks after release of shop drawing <br />■ TLC to send shop this week for KH review <br />• HSP4&5 <br />o TLC to finish piping <br />• Electrical <br />o VFDs shipping 3/13 <br />■ VFDs will sit in paragon warehouse until install <br />o Switchboard missing 800amp breakers. <br />■ Shipping to paragon factory, breakers will ship separately <br />o Feed water pump (FWP) motors on site <br />o V -port ball valve on site <br />o TLC to provide schedule of values for SCADA part A project <br />o C&W to send CAD for CP 1-4 to CC Controls <br />Shop drawings: <br />o KH to review <br />■ Acid room coatings <br />■ SST Piping <br />■ General arrangement drawings <br />Work change directive: TLC to provide <br />1. lmigkt Role-fer WSW 48-.5 w/ recce *per <br />2.—FWP-Sweden RPVs (5 <br />3 fWR-rehab ine{udimS pimp hates <br />I <br />S. Rebuild ef lost x fer ptim9p amd equip with metei--- <br />7. Repair at Well 3 <br />8 uit ____ute r__ L,..,m iand the room under the proposed CIP system <br />9. West GST 316 SST stanchion pipe support <br />
The URL can be used to link to this page
Your browser does not support the video tag.