Laserfiche WebLink
Kimley-Horn 20 -MARCH -2023 <br />1920 Wekiva Way, Suite 200 <br />West Palm Beach, FI 33411 <br />Attn: Mr. Nick Black, P.E. Nick.Black(a)-Kimley-Horn.com <br />Reference: RFP feed pump re -build, transfer pump motor and re -build, area light, relocate chem <br />room conduits, new lab elect. Circuits, fiber work, grounding & lightning check out confirmation. <br />Dear Mr. Black, <br />Please find a quotation for the changes requested as reference above. <br />Labor = <br />$ <br />10,437.00 <br />Material = <br />$ <br />231,216.05 <br />Subcontract = <br />$ <br />70,297.10 <br />Equipment = <br />$ <br />4,000.00 <br />Other= <br />$ <br />0.00 <br />Labor Burden = <br />$ <br />3,652.95 <br />Tax = <br />$ <br />16,465.12 <br />OH & P subs 5% _ <br />$ <br />3,514.86 <br />OH & P @ Self Perform 15% _ <br />$ <br />39,865.67 <br />Subtotal = <br />$ <br />379,448.75 <br />Bond = <br />$ <br />7,588.97 <br />Total ADD = <br />$ <br />387,037.72 <br />With the current supply chain delays that have been discussed in the project meetings it is <br />difficult to quantify the additional time required to quote this change. TLC is therefore reserving <br />our rights to additional time for the project that will be determined at a later date. Please provide <br />your acceptance of this additional work and issue a change order so that TLC can release the <br />required items for production. <br />Sincerely Yours, <br />C24oP <br />John P. Elder (Project Manager) <br />PALMETTO WEST PALM BEACH <br />Corporate Office 7233 Southern Blvd <br />2719 17th St. East Suite B-1 <br />Palmetto, FL 34221 West Palm Beach, FL 33413 <br />TAMPA <br />12814 Dupont Circ Le <br />Building B, Suite 4-A <br />Tampa, FL 33626 <br />%- 941.722.0621 <br />ry 941.722.1382 <br />CG C041816 CU C053963 <br />