My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2023-081
CBCC
>
Official Documents
>
2020's
>
2023
>
2023-081
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/23/2023 10:39:18 AM
Creation date
5/23/2023 10:27:37 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Change Order
Approved Date
05/02/2023
Control Number
2023-081
Agenda Item Number
8.J.
Entity Name
TLC Diversified, Inc.
Subject
Change Order No.3 for South County Water Treatment Plant Membrane and Retrofit Project
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
36
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Barney's Pumps Inc. <br />B PO Box 3529 <br />Lakeland, FL 33802 <br />' (863)665-8500 <br />Lakeland <br />Bill To: <br />Indian River County BOCC <br />finance@ircgov.com cpeacock@ircgov.com <br />1840 25th Street <br />Vero Beach, FL 32958 <br />772-226-1201 <br />Customer ID: 10795 <br />QUOTATION <br />QUOTE NUMBER <br />1011284 <br />QUOTE DATE Page <br />3/16/2023 4-1 of 2 <br />Quote Expires On: 04/15/2023 <br />Quoted by: LKMATT <br />Ship To: <br />Indian River County BOCC <br />South Regional WWTP <br />2500 6th Ave SW <br />Vero Beach, FL 32962 <br />Destination Country: <br />PO Number <br />Terms <br />Freight Code <br />Job Name <br />Net 30 <br />Freight Allowed <br />Oslo WTP VTP Transfer Pump Rebuild <br />Quantities <br />Item ID <br />Item Description <br />Unit <br />Prue <br />Extended <br />Price <br />Ordered <br />Allocate <br />Remaining <br />UOM <br />4 <br />Unit Size <br />q <br />Order Note: **** <br />Pick-up and delivery is included in quoted price. <br />Pump must be pulled and re -installed by others. <br />**** <br />Estimated lead time is 6-8 weeks ARO, but due to <br />continued turmoil in the market, this cannot be <br />guaranteed. <br />**** <br />Quote assumes customer's discharge head, <br />column, bowl, and impeller are in acceptable <br />condition and do not require replacement. <br />Condition of these items will be evaluated during <br />inspection and if replacements are required, <br />customer will be notified and work will be <br />requoted. <br />**s* <br />0 1 EA REPAIR <br />1.0 Barney's Pumps Repair <br />Layne Vertiline 18GM 1 -stage, 50 HP, 1200 <br />RPM rated for potable water <br />Order Line Notes: Disassemble <br />Sand blast to SP6 finish <br />Inspect (check clearances and tolerances) <br />Reassemble with the following parts and <br />procedures: <br />New bowl shaft <br />New head shaft <br />New line shaft <br />New suction and discharge case bearings <br />New line shaft bearings <br />New bronze stuffing box bearing <br />New 416ss bowl wear ring <br />EA 18,785.0000 18,785.00 <br />1.0 <br />
The URL can be used to link to this page
Your browser does not support the video tag.