Laserfiche WebLink
EDLUND • DRITENBAS • BINKLEY <br />ARCHITECTS AND ASSOCIATES, P.A. <br />65 Ployal Palrn Parte, Ste D <br />Vero Beach, FL 32960 <br />Ph. (772) 569-4320 Fax (772) 569-9208 <br />April 4.2023 <br />TO: Indian lZiver County Parks & Recreation <br />Attn: Joseph Tilton <br />RE: Proposal for Architectural Services Victor Hart Park Restroom <br />Architects Comm. #010423VB <br />Dear Sir: <br />This letter shall serve as our proposal and agreement for the preparation of documents necessary <br />for building construction of the above referenced project. <br />I. SCOPE <br />The scope of work will consist of providing design and construction documents for a men and <br />women's public restroom approximately 950 S.F. The previously completed i-iallstrom <br />House/I lobart Restrooms plans will be enlarged for space for four water closets in women's <br />restroom and two water closets/thvo urinals in men's restroom. <br />1I. ARCHITECTS BASIC SERVICES <br />The Architect shall provide full permit documents for construction to be constructed by <br />subcontractors or general contractor of the Owner's choice. Documents and services provided by <br />the Architect and his employed Structural. Mechanical. Electrical and Plumbing Engineering <br />sub -consultants will include the following: <br />I) Data collection. additional field verifications. and meetings with Owner. if needed. <br />2) Construction documents. including all necessary plans liar building permit <br />submission. <br />3) Provide electrical design for new lift station to serve this building, and coordinate <br />with FPL to provide electric service design for this project. <br />4) Address plan review comments and make revisions as required. <br />5) Assist in obtaining construction bids. bidding administration. and addcndums as <br />needed. <br />6) Construction administration shall include a preconstruction meeting periodic <br />construction observations twice monthly. construction meeting with Owner and G.C.. <br />RFi responses. submittals review. review of pay applications and any changes in the <br />work. A punch list and final inspection will also be done. <br />103 <br />