My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2023-094
CBCC
>
Official Documents
>
2020's
>
2023
>
2023-094
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/1/2023 12:57:57 PM
Creation date
6/1/2023 12:56:47 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Agreement
Approved Date
05/16/2023
Control Number
2023-094
Agenda Item Number
8.N.
Entity Name
Florida Department of Transportation (FDOT)
Subject
FDOT Transportation Regional Incentive Program (TRIP) Supplemental Agreement No. 1
for CEI and construction of 66th Avenue from 69th Street to CR-510/85th Street
FM No. 436379-2-54-01
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
6
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Alt Forth 525-010-60eA STATE OF FLORIDA DEPARTMENT OF TRANSPORTATION 525 -011 -OA <br />STATE -FUNDED GRANT AGREEMENT PROGRAM MANAGEMENT <br />05/21 <br />EXHIBIT A <br />PROJECT DESCRIPTION AND RESPONSIBILITIES <br />FPN: 436379-2-54-01 <br />This exhibit forms an integral part of the Agreement between the State of Florida, Department of Transportation and <br />Indian River County (the Recipient) <br />PROJECT LOCATION: <br />❑ The project is on the National Highway System. <br />❑ The project is on the State Highway System. <br />PROJECT LENGTH AND MILE POST LIMITS: 66TH AVE FROM 69TH ST TO CR-510/85TH ST <br />88530000 COMPOSITE 2 <br />5.526 / 6.918 <br />1.392 <br />88530000 LEFT RDWY 1 <br />6.918 / 7.128 <br />0.210 <br />88530000 RIGHT RDWY 1 <br />6.918 / 7.128 <br />0.210 <br />88530000 COMPOSITE 2 <br />7.128 / 7.463 <br />0.335 <br />88530000 LEFT RDWY 1 <br />7.463 / 7.546 <br />0.083 <br />88530000 RIGHT RDWY 1 <br />7.463 / 7.546 <br />0.083 <br />PROJECT DESCRIPTION: CEI and Construction of the proposed improvements to 66th Avenue from north of 69th Street <br />to 85th Street (CR510) consisting of the widening and reconstruction of the existing roadway to a 4 -lane divided roadway <br />section within the project limits. Curb and gutter and a raised median will be provided. An 8' wide concrete sidewalk will be <br />provided on the west side of the roadway. Also included will be stormwater drainage improvement, pavement markings, <br />traffic signals and landscape and irrigation improvements. <br />SPECIAL CONSIDERATIONS BY RECIPIENT: <br />The Recipient is required to provide a copy of the design plans for the Department's review and approval to coordinate <br />permitting with the Department, and notify the Department prior to commencement of any right-of-way activities. <br />The Recipient shall commence the project's activities subsequent to the execution of this Agreement and shall perform in <br />accordance with the following schedule: <br />a) Study to be completed by N/A. <br />b) Design to be completed by N/A. <br />c) Right -of -Way requirements identified and provided to the Department by N/A. <br />d) Right -of -Way to be certified by N/A. <br />e) Construction contract to be let by N/A. <br />D Construction to be completed by June 30, 2024 <br />If this schedule cannot be met, the Recipient will notify the Department in writing with a revised schedule or the project is <br />subject to the withdrawal of funding. <br />SPECIAL CONSIDERATIONS BY DEPARTMENT: <br />Issuance of the Notice to Proceed is held until the Local agency Right of Way aquisition is complete. <br />2of5 <br />
The URL can be used to link to this page
Your browser does not support the video tag.