My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2023-096
CBCC
>
Official Documents
>
2020's
>
2023
>
2023-096
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/1/2023 1:11:54 PM
Creation date
6/1/2023 1:07:54 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Work Order
Approved Date
05/16/2023
Control Number
2023-096
Agenda Item Number
8.V.
Entity Name
Kimley-Horn and Associates, Inc.
Subject
Work Order 10 for Professional Services for Oslo Road Water Treatment Plant Sand
Strainer Replacement, RFQ 2019070
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
10
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
C & W engineering Inc. <br />Consulting Engineers — Electrical • HVAC • Plumbing <br />6903 Vista Parkway North, #10 <br />West Palm Beach, FL 33411 <br />(561) 642-5333 <br />April 5, 2023 <br />Nick Black, P.E. <br />Kimley-Horn & Associates, Inc. <br />1920 Wekiva Way <br />West Palm Beach, FL 33411 <br />Subject: IRC Oslo WTP Sand Strainer Filter Equipment Replacement <br />Electrical Design and Construction Engineering Services Proposal <br />C&W Ref. 236610 <br />Dear Nick: <br />I am pleased to submit this proposal to provide design through construction of <br />the replacement of the existing sand strainer filter equipment; this would include <br />replacing the existing strainer equipment along with related pumps, and field <br />instruments, and control panel with similar capacity equipment at the Oslo WTP. We <br />would include 90% and 100% design documents, including specs and drawings, and <br />opinion of construction costs. We will also include construction services that would <br />provide review of equipment shop drawings, attend a pre -construction meeting, and <br />attend a monthly meeting, and provide a visit during equipment startup and prepare a <br />punch list. <br />It is our understanding that this project would be provided as part of a change <br />order to TLC under the current water plant improvements, instead of normal bidding <br />phase. Our design drawings would include a new control panel and field equipment, <br />along with status signal connections to the nearest existing PLC panel. <br />Coordination with Kimley Horn Engineers, Owner and Vendors. <br />DESIGN PHASE SERVICES <br />Coordination <br />Kimley Horn and Associates, Inc. <br />Owner <br />Vendors <br />Engineering <br />
The URL can be used to link to this page
Your browser does not support the video tag.