My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
04/04/2023
CBCC
>
Meetings
>
2020's
>
2023
>
04/04/2023
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/5/2023 10:25:20 AM
Creation date
6/5/2023 10:15:07 AM
Metadata
Fields
Template:
Meetings
Meeting Type
BCC Regular Meeting
Document Type
Agenda Packet
Meeting Date
04/04/2023
Meeting Body
Board of County Commissioners
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
280
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
North County Inline Pump Station Evaluation <br />IRCDUS PID 21-23010 <br />Background <br />Increases in current and anticipated future growth in the north end of the County's service area <br />have resulted in the need to address the replacement of the master lift station for this area, Lift <br />Station 203. In October 2022, Indian River County Department of Utility Services (IRC) requested <br />that Atkins provide technical services to evaluate the option of replacing the existing master <br />pump station, Lift Station 203, with an above -ground booster pump station, Capital Improvement <br />Project Identification Number (PID) 21-23010. Lift Station 203 is located at the decommissioned <br />North Wastewater Treatment Facility (WWTF) and consists of two submersible pumps located in <br />the equalization tank that was part of the abandoned North WWTF. The equalization tank is <br />open to atmosphere, causing major odor issues, and there is concern about the structural <br />integrity of the concrete tank. For these reasons, Lift Station 203 is considered unsuitable for <br />expansion or rehabilitation. Figure 1 shows the existing pump station and tank configuration. <br />Figure 1. Lift Station 203 at the North WWTF <br />IRC would like to replace the deteriorating existing pump station with an in-line above -grade <br />wastewater pump station similar to the configuration of IRC's Lift Station 89. The new pump <br />station will address the increase in pump station capacity as well as the odor issues associated <br />with the current pump station. <br />Lift Station 203 functions as a master pump station, collecting flows from three areas. From the <br />north, there are 59 lift stations that feed into a 24" force main which reduces to a 12" force main <br />1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.