Laserfiche WebLink
ExhibitA+ <br />IRC North County Inline Pump Station Evaluation ATKINIS <br />operation of the pumps and verifypump; motor and dire selections. Preliminary Cost f <br />Proposals from vendors will.be requested and provided to the .County <br />Deliverables: Workshop with the County. to review pump station. design criteria,: # <br />including bypass. capacity and: operations. Workshop. summary and vendor cost <br />proposals. <br />Task 05 Pump Station Sitingand Preliminaiylayout <br />Atkins will determine pump station. compenents; including booster pumps, drive <br />types, piping configurations, backup generator and fuel `tank, and control room based <br />on the decisions made at the Pump.OperationsWorkshop,: Atkins will .review options <br />for utilizing portions of the abandoned North WWTF to house components of the <br />pump station such as the electrical room and control room. A:draft layout will be <br />discussed with IRC Staff in a virtual meeting prior to creating a preliminary site plan <br />that includes.the proposed yard piping, new pump station.and associated. components <br />including bypass operations. A conceptual site plan will be submitted to the County <br />via email. <br />Deliverables: Submittal of a draft conceptual site plan, followed by a virtual meeting <br />to discuss County comments. An updated site plan will be submitted to the County via <br />email. <br />Deliverables - <br />Task Deliverable <br />1:Invoices, Status Reports, Meeting Agendas and Summaries ; <br />2 Data Request Memo <br />3 Hydraulic Model Workshop Presentation and Meeting Summary <br />4 Pump Station Operations Workshop Presentation and Meeting Summary <br />5 Draft Preliminary Site Plan and Review Meeting Agenda and Summary. <br />Schedule <br />The anticipated schedule shown below is based on the weeks after the formal issuance of the <br />signed Work Order and a Notice to Proceed by the County: <br />Task.. <br />Duration from NTP <br />Project Kick -Off Meeting and: Site Visit <br />2 weeks <br />Begin Data Collection <br />I Hydraulic Modeling Workshop <br />2 weeks <br />8 weeks <br />Pump Station Operations Workshop. <br />10 weeks <br />1 Draft PreliminarySite Plan Virtual Meeting g <br />Finalize Site Plan <br />12 weeks <br />16 weeks . <br />89 <br />