My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
04/04/2023
CBCC
>
Meetings
>
2020's
>
2023
>
04/04/2023
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/5/2023 10:25:20 AM
Creation date
6/5/2023 10:15:07 AM
Metadata
Fields
Template:
Meetings
Meeting Type
BCC Regular Meeting
Document Type
Agenda Packet
Meeting Date
04/04/2023
Meeting Body
Board of County Commissioners
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
280
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ExhibitA <br />IRC North County Inline Pump Station Evaluation <br />• Updates to the 2015 wastewater hydraulic model will be required for Lift Station 203 <br />Basin. Other updates to the hydraulic model are not included in this scope but may be <br />recommended for future phases. <br />• The hydraulic capacity of Lift Station 203 will be verified for current operation. Future <br />capacities will be determined for the 2030 and 2045. Capacities between these modeled <br />scenarios will be extrapolated from the model results for those years. <br />• Field calibration of the hydraulic model is not included in this scope but may be <br />recommended for future phases. <br />• No site civil work beyond conceptual connections to the on-site force mains will be <br />required as part of this phase of the project. No survey activities are included in this <br />scope. <br />Exclusions <br />With the exception of the update to the hydraulic model of the Lift Station 203 Basin, the <br />activities associated with this Work Order are conceptual in nature, intended to clarify the ability <br />to create an in-line wastewater booster pump station and potential bypass operation at this <br />location. Information created and provided under this Work Order is intended as a guide for use <br />in performing the design and construction of the new master pump station. <br />Compensation <br />Atkins proposes to perform the work described in Tasks 1— 6 on a Fixed Fee basis with budgets <br />between the sub -tasks and expenses being interchangeable as needed. The estimated total <br />engineering fee including labor and expenses associated with the scope of work is not to exceed <br />$83,433 as summarized in the table below and presented in detail in Exhibit B. <br />Task <br />No. <br />Task <br />Fee <br />1 <br />Project Management <br />Data Collection <br />Hydraulic Evaluation, Tables & Figures <br />$17,030 <br />2 <br />$ 8,500 . <br />3 <br />$ 25,801). <br />4 <br />Equipment Selection and Operations <br />$ 14,580 <br />5 <br />Pump Station Siting. and Prelimina y1ayout <br />$16,192 <br />6 <br />Expenses <br />$ 1,331:. <br />Total Fee - <br />$ 83,433 <br />..6 <br />91 <br />
The URL can be used to link to this page
Your browser does not support the video tag.