My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
04/04/2023
CBCC
>
Meetings
>
2020's
>
2023
>
04/04/2023
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/5/2023 10:25:20 AM
Creation date
6/5/2023 10:15:07 AM
Metadata
Fields
Template:
Meetings
Meeting Type
BCC Regular Meeting
Document Type
Agenda Packet
Meeting Date
04/04/2023
Meeting Body
Board of County Commissioners
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
280
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
follow the schedule outlined below: <br />1. Off-site watermain identified as km IRC -lin Exhibit B to be paid orIC6,00MOWon of all <br />necessary testing, acceptance of 06rida Department of lEnviroranental Protection <br />(FDEP)Cerltfication Of Completion, final close outdf the FEC permit for work within the <br />FEC right of way, and acceptance of the watermain dedication to Indian Rim County <br />Department of Utility Services (IRCDU through a Bill of .Sale, per(iRCDUS) Wot-er& <br />Wastewater Utility Standards, May 21 or latest edition, grantingof all items setforth <br />in section 9 below, and payment to the COUNTY of $5,43556 for the fees paid by <br />COUNTY to FEC'. <br />2_ Amendment: <br />This Agreement maybe modified only by a written instrument executed by all parties to the <br />Agreement. <br />3. Assignability: <br />Either party may assign this Agreement. However, the rights granted herein shall run with the <br />land and are not the personal property of the DEVELOPER. Therefore, while the DEVELOPER <br />has the right under this Agreement to freely transfer the rights and obligations granted by this <br />Agreement, the assignee shall not have the right, to transfer these rights to another property <br />unless this Agreement is amended in writing by the assignee and the COUNTY., j <br />4. Authority <br />Each party hereto represents and warrants to the other that the execution' ofthiii Agreement <br />and any other documents required or necessaryla be executed pursuant ter. f$e provi <br />hereof are valid, binding obligations and are enferceebte to accordance with their tenm <br />S. Captions: <br />Captions, if Included, In this Agreement are included for convenience only and are not to be <br />considered in any construction or interpretation of this Agreement or any of its provisionf. <br />6. Construction Pians, Technical Specifications and Contract Documents: <br />The DEVELOPER agrees to complete a final set of construction drawings and make submission <br />for a. Utilities Construction Permit (.UCP) to the Indian River County Utilities Department, Florida <br />Department of Environmental Protection (FDEP) and all other necessary permits. The <br />DEVELOPER shall not commence construction until all permits are approved and obtained. <br />7. Definition <br />All pronouns shall be deemed to refertothe masculine, feminine, or neuter, singular or plural, <br />as the identity of the party or parties may require. <br />8. DEVELOPER'S Obligations: <br />19 <br />- -Page 2 - <br />C:\U5k7LS1(iCM51:C1AP1'UA't'A\LUCALIMlC1tUSUY1IW(NWWSYINI;'ICACiIb'1WNIY.N'f.UV'fLWKWLXUtlUiLNL'V AURL�EA1liM111AWKx NIiSI-ll12AVl'-111-2U23.UfK <br />
The URL can be used to link to this page
Your browser does not support the video tag.