My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2022-153B
CBCC
>
Official Documents
>
2020's
>
2022
>
2022-153B
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/12/2023 12:18:06 PM
Creation date
6/12/2023 12:15:24 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Grant
Approved Date
08/16/2023
Control Number
2022-153B
Agenda Item Number
8.AG.
Entity Name
State of Florida Department of Environmental Protection (FDEP)
Subject
FDEP Cost-Share Funding Agreement for Floravon Shores Septic to Sewer
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
36
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ATTACHMENT 3 <br />GRANT WORK PLAN <br />PROJECT TITLE: Floravon Shores Septic to Sewer Conversion <br />PROJECT LOCATION: The project will be located from the end of 110`h Street (cul-de-sac) to the east <br />side of the intersection of US Hwy 1 and 110th Street, north along the east right-of-way of US -1 and east <br />along 110th PI to an Indian River County Lift Station, within Indian River County. Lat/Long (27.7952, - <br />80.4581). See Figure 1. for a location map. <br />PROJECT BACKGROUND: Floravon Shores is a small community of 19 lots on septic adjacent to the <br />Indian River Lagoon. The septic to sewer conversion will route the wastewater from this community to a <br />county system for collection and treatment at a regional wastewater facility that is operated by Indian River <br />County Department of Utility Services. The conversion will reduce the nutrient loading, improve water <br />quality, and promote seagrass growth in the Indian River Lagoon by routing septic effluent into a regional <br />sanitary sewer collection and treatment system. <br />PROJECT DESCRIPTION: The Floravon Shores Septic to Sewer Conversion will construct <br />approximately 1,211 LF of gravity sewer main and approximately five manholes. This project will connect <br />up to approximately 18 homes. <br />TASKS: All documentation should be submitted electronically unless otherwise indicated. <br />Task 1: Construction <br />Deliverables: The Grantee will construct Floravon Shores Septic to Sewer Conversion in accordance with <br />the construction contract documents.This will include the items necessary to construct the project minus <br />the connection to central sewer. <br />Documentation: The Grantee will submit 1) a copy of the final design; 2) a signed acceptance of the <br />completed work to date, as provided in the Grantee's Certification of Payment Request; and 3) a signed <br />Engineer's Certification of Payment Request. <br />Performance Standard: The Department's Grant Manager will review the documentation to verify that <br />the deliverables have been completed as described above. Upon review and written acceptance by the <br />Department's Grant Manager, the Grantee may proceed with payment request submittal. <br />Payment Request Schedule: The Grantee may submit a payment request for cost reimbursement no more <br />frequently than monthly. <br />Task 2: Connection to Central Sewer <br />Deliverables: The Grantee will properly abandon the septic systems and connect approximately 18 single <br />family residences to a central sanitary sewer system for wastewater treatment by the Indian River County <br />Central Wastewater Treatment facility. <br />Documentation: The Grantee will submit: 1) a signed acceptance of the completed work to date, as <br />provided in the Grantee's Certification of Payment Request; 2) a list of addresses and types of the properties <br />connected; and 3) proof of septic abandonment and connection for each property, as evidenced by copies <br />of invoices for the abadonments and connections by a licensed plumber, utility contractor, or building <br />contractor. <br />DEP Agreement No. WG023, Attachment 3, Page 1 of 3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.