Laserfiche WebLink
Contractor's Price Proposal - Detail <br />Date: October 27, 2022 <br />Re: IQC Master Contract #: <br />FL-13I0-GC11-111821-JLC <br />Work Order #: <br />108272.00 <br />Owner PO #: <br />Title: <br />Indian River County - Archie Smith Fish House Pavilion / Demo <br />Contractor: <br />Johnson-Laux Construction, LLC <br />Proposal Value: <br />$508,407.90 <br />Sect. Item Mod. <br />UOM Description <br />Line Total <br />Labor Equip. Material (Excludes) <br />Alternate <br />1 01 22 23 00 0279 <br />DAY 1,500 LB Capacity, 60" Wide, Skid -Steer Loader With Full -Time Operator <br />$1,905.11 <br />Quantity Unit Price Factor <br />Total <br />Installation= <br />2.00 x 769.93 x 1.2372 <br />1,905.11 <br />material handling and fence pulling <br />2 01 22 23 00 0353 <br />DAY 7/8 To 1 CY Hydraulic Excavator With Full -Time Operator <br />$2,376.78 <br />Quantity Unit Price Factor <br />Total <br />Installation= <br />2.00 x 960.55 x 12372 <br />2,376.78 <br />excavation of the existing piers for the fish house <br />3 01 71 13 00 0002 <br />EA Equipment Delivery, Pickup, Mobilization And Demobilization Using A Rollback <br />$292.56 <br />Flatbed Trucklncludes loading, tie -down of equipment, delivery of equipment, <br />off loading on site, rigging, dismantling, loading for return and transporting <br />away. For equipment such as trenchers, skid -steer loaders (bobcats), industrial <br />warehouse forklifts, sweepers, scissor platform lifts, telescoping and <br />articulating boom man lifts with up to 40' boom lengths, etc. <br />Quantity Unit Price Factor <br />Total <br />Installation 100 x 236.47 x 1.2372 <br />292.56 <br />equipment delivery for the skid steer <br />4 01 71 13 00 0003 <br />EA Equipment Delivery, Pickup, Mobilization And Demobilization Using A Tractor <br />$1,088.30 <br />Trailer With Up To 53' Bedlncludes loading, tie -down of equipment, delivery of <br />equipment, off loading on site, rigging, dismantling, loading for return and <br />transporting away. For equipment such as bulldozers, motor scrapers, <br />hydraulic excavators, gradalls, road graders, loader-backhoes, heavy duty <br />construction loaders, tractors, pavers, rollers, bridge finishers, straight mast <br />construction forklifts, telescoping boom rough terrain construction forklifts, <br />telescoping and articulating boom man lifts with >40' boom lengths, etc. <br />Quantity Unit Price Factor <br />Total <br />Installation= <br />1.00 x 879.65 x 1.2372 <br />1,088.30 <br />excavator mobilization <br />5 01 74 19 00 0031 <br />CY Traditional Building Construction Materials Landfill Dump Fee <br />$12,716.50 <br />Quantity Unit Price Factor <br />Total <br />Installation 585.00 x 17.57 x 12372 = <br />12,716.50 <br />landfill dump fees. 1052 SF building footprint x 15' Height = 15780 CF / 27 = 584.44 CY <br />6 01 74 19 00 0037 <br />CYM Hauling On Paved Roads, First 15 Miles <br />$9,119.40 <br />Quantity Unit Price Factor <br />Total <br />Installation 8,775.00 x 0.84 x 12372 = <br />9,119.40 <br />hauling of debris from demolition. 585 CY x 15 <br />7 01 74 19 00 0038 <br />CYM Hauling On Paved Roads, Miles Over Initial 15 Miles <br />$2,062.72 <br />Quantity Unit Price Factor <br />Total <br />Installation 2,925.00 x 0.57 x 12372 = <br />2,062.72 <br />hauling of debris from demolition. 585 CY x 5 <br />8 02 41 16 13 0018 <br />CCF By Machine, Wood Frame Construction Building Demolition <br />$4,165.63 <br />Quantity Unit Price Factor <br />Total <br />Installation 158.00 x 21.31 x 12372 = <br />4,165.63 <br />demo of the fish house <br />Contractor's Price Proposal - Detail <br />Page 1 of 10 <br />10/27/2022 <br />