My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2022-231A
CBCC
>
Official Documents
>
2020's
>
2022
>
2022-231A
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/16/2023 1:06:15 PM
Creation date
6/16/2023 12:57:26 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Work Order
Approved Date
11/08/2022
Control Number
2022-231A
Agenda Item Number
12.C.1.
Entity Name
Gordian /Johnson-Laux Construction, LLC
Subject
Archie Smith Fish House Pavilion Construction & Demolition of the Archie Smith Fish house
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
16
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Contractor's Price Proposal - Detail Continues.. <br />Work <br />Order <br />Number: <br />108272.00 <br />Work Order Title: <br />Indian River County - Archie Smith Fish House Pavilion / Demo <br />Base Bid <br />40 <br />01 22 <br />20 000058 <br />HR Principal Engineer <br />$2,103.44 <br />Quantity Unit Price <br />Factor <br />Total <br />Installation 8.00 x 212.52 x <br />1,2372 = <br />2,103.44 <br />stamped and sealed engineered structural drawings <br />41 <br />01 22 <br />20 00 0059 <br />HR Senior Engineer <br />$9,615.72 <br />Quantity Unit Price <br />Factor <br />Total <br />Installation 48.00 x 161.92 x <br />1.2372 <br />9,615.72 <br />engineering for new dock and pavilion <br />42 <br />01 22 <br />20 00 0059 <br />HR Senior Engineer <br />$1,602.62 <br />Quantity Unit Price <br />Factor <br />Total <br />Installation 8.00 x 161.92 x <br />1.2372 = <br />1,602.62 <br />geotechnical evaluation <br />43 <br />01 22 <br />20 00 0061 <br />HR Draft Person <br />$4,544.78 <br />Quantity Unit Price <br />Factor <br />Total <br />Installation 48.00 x 76.53 x <br />12372 = <br />4,544.78 <br />drafting of new design drawings for teh dock and pavilion <br />44 <br />01 22 <br />23 00 0909 <br />DAY 50' Deck Cargo Barge <br />$1,059.55 <br />Quantity Unit Price <br />Factor <br />Total <br />Installation 1.00 x 856.41 x <br />1.2372 <br />1,059.55 <br />barge to collect geotechnical sample <br />45 <br />01 22 <br />23 00 0910 <br />DAY 90' Deck Cargo Barge <br />$30,083.51 <br />Quantity Unit Price <br />Factor <br />Total <br />Installation 20.00 x 1,215.79 x <br />12372 = <br />30,083.51 <br />material cargo barge for the logistics of construction materials to the construction site <br />46 <br />01 22 <br />23 00 0913 <br />DAY Barge Rental With Mounted Crane And Full-time Operatorincluding barge. <br />$133,242.11 <br />Quantity Unit Price <br />Factor <br />Total <br />Installation x x <br />50.00 2,153.93 <br />= <br />1.2372 <br />133,242.11 <br />constructing the new dock and pavilion from water. platform with equipment for material handling <br />47 <br />01 45 <br />23 00 0065 <br />EA Standard Penetration With Split Spoon <br />$51.27 <br />Quantity Unit Price <br />Factor <br />Total <br />Installation 2.00 x 20.72 x <br />1.2372 = <br />51.27 <br />geotechnical sampling <br />48 <br />01 45 <br />23 00 0066 <br />EA Split Spoon (Tripod) <br />$95.69 <br />Quantity Unit Price <br />Factor <br />Total <br />Installation= <br />2.00 x 38.67 x <br />1.2372 <br />95.69 <br />geotechnical sampling <br />49 <br />01 45 <br />23 00 0188 <br />HR Pile Driving Inspection4 hour minimum. <br />$2,078.50 <br />Quantity Unit Price <br />Factor <br />Total <br />Installation 48.00 x 35.00 x <br />1.2372 <br />2,078.50 <br />pile inspection <br />50 <br />01 45 <br />29 00 0019 <br />EA Soil Bearing Ratio, ASTM D1883 <br />$910.21 <br />Quantity Unit Price <br />Factor <br />Total <br />Installation 2.00 x 367.85 x <br />1.2372 <br />910.21 <br />geotechnical sampling <br />51 <br />01 45 <br />29 00 0029 <br />EA Permeability, ASTM D2434, Soil Borings Laboratory Test <br />$805.89 <br />Quantity Unit Price <br />Factor <br />Total <br />Installation= <br />2.00 x 325.69 x <br />1.2372 <br />805.89 <br />geotechnical sampling <br />Contractor's Price Proposal - Detail Page 5 of 10 <br />10/27/2022 <br />
The URL can be used to link to this page
Your browser does not support the video tag.