My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2022-231B
CBCC
>
Official Documents
>
2020's
>
2022
>
2022-231B
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/16/2023 1:13:04 PM
Creation date
6/16/2023 1:11:20 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Work Order
Approved Date
11/08/2022
Control Number
2022-231B
Agenda Item Number
12.C.2.
Entity Name
Gordian /Johnson-Laux Construction, LLC
Subject
Work Order for the elevation and stabilization of the Jones Pier Bungalow/Historic House &
Jones Pier Conservation Area Public use Improvements
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
19
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Contractor's Price Proposal - Detail Continues.. <br />Work Order Number: 108749.00 <br />Work Order Title: <br />Indian River County - Jones Pier Residence <br />Section - 04 <br />59 04 22 <br />23 13 0021 <br />SF 12" x 8" x 16", Cored, Normal Weight, Concrete Block <br />$3,975.82 <br />Quantity Unit Price <br />Factor <br />Total <br />Installation 322.00 x 9.98 x <br />1.2372 <br />3,975.82 <br />12"x12" CMU piers <br />60 04 22 <br />23 13 0021 <br />0023 <br />MOD For Stacked Bond, Add <br />$740.98 <br />Quantity Unit Price <br />Factor <br />Total <br />Installation 322.00 x 1.86 x <br />1.2372 <br />740.98 <br />61 04 22 <br />23 13 0021 <br />0028 <br />MOD For <10, Small Area Replacements (Individual Areas), Add <br />$4,370.21 <br />Quantity Unit Price <br />Factor <br />Total <br />Installation 322.00 x 10.97 x <br />1.2372 <br />4,370.21 <br />Subtotal for Section - 04 <br />$24,530.20 <br />Section - 05 <br />62 05 05 <br />19 00 0176 <br />EA 5/8" x 7" Long Chemically Adhered Anchor Rod <br />$930.42 <br />Quantity Unit Price <br />Factor <br />Total <br />Installation 36.00 x 20,89 x <br />1.2372 - <br />930.42 <br />threaded rod. multiplied quantity by 4. total length of each dowel is 24" <br />63 05 05 <br />19 00 0176 <br />0195 <br />MOD For >10 To 50, Deduct <br />-$21.38 <br />Quantity Unit Price <br />Factor <br />Total <br />Installation= <br />36.00 x -0.48 x <br />1.2372 <br />-21.38 <br />64 05 05 <br />19 00 0186 <br />EA 5/8" Chemical Adhesive For Bolt, Dowel Or Threaded Rod <br />$132.39 <br />Quantity Unit Price <br />Factor <br />Total <br />Installation 9.00 x 11.89 x <br />1.2372 = <br />132.39 <br />epoxy for new dowels <br />65 05 05 <br />19 00 0205 <br />EA 1/4" x 3-1/4" Tapcon Masonry Screw <br />$991.00 <br />Quantity Unit Price <br />Factor <br />Total <br />Installation 150.00 x 5.34 x <br />1.2372 <br />991.00 <br />tepcons to fasten Veranda lattice nailer <br />66 05 05 <br />19 000205 <br />0197 <br />MOD For >1 00, Deduct <br />-$178.16 <br />Quantity Unit Price <br />Factor <br />Total <br />Installation 150.00 x -0.96 x <br />1.2372 <br />-178.16 <br />67 05 05 <br />23 00 1167 <br />EA 1/4"-28 x 3", Hex Washer Head, Teks® 5 Self Drilling Screw <br />$802.60 <br />Quantity Unit Price <br />Factor <br />Total <br />Installation 204.00 x 3.18 x <br />1.2372 <br />802.60 <br />fasteners for the installation of the temporary plywood <br />68 05 05 <br />23 001167 <br />0197 <br />MOD For >100, Deduct <br />-$108.53 <br />Quantity Unit Price <br />Factor <br />Total <br />Installation 204.00 x -0.43 x <br />1.2372 <br />-108.53 <br />69 05 05 <br />23 00 1180 <br />EA #8 Diameter x 1-1/2" Length, 304/18-8 Stainless Steel, Security Screw <br />$736.13 <br />Quantity Unit Price <br />Factor <br />Total <br />Installation 250.00 x 2,38 x <br />1.2372 - <br />736.13 <br />screws to fasten Veranda divider and top and bottom caps <br />70 05 05 <br />23 00 1180 <br />0197 <br />MOD For >100, Deduct <br />-$89.70 <br />Quantity Unit Price <br />Factor <br />Total <br />Installation= <br />250.00 x -0.29 x <br />1.2372 <br />-89.70 <br />Contractor's Price Proposal - Detail <br />Page 7 of 12 <br />10/27/2022 <br />
The URL can be used to link to this page
Your browser does not support the video tag.