My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2022-231B
CBCC
>
Official Documents
>
2020's
>
2022
>
2022-231B
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/16/2023 1:13:04 PM
Creation date
6/16/2023 1:11:20 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Work Order
Approved Date
11/08/2022
Control Number
2022-231B
Agenda Item Number
12.C.2.
Entity Name
Gordian /Johnson-Laux Construction, LLC
Subject
Work Order for the elevation and stabilization of the Jones Pier Bungalow/Historic House &
Jones Pier Conservation Area Public use Improvements
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
19
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
JOHNSON o1u 1 -.Aux <br />C O N S T R U C T 1 0 N <br />Clarifications: <br />- Work to be performed during normal/regular business hours as defined: Monday through Friday, 7:00am <br />to 3:30pm with holidays excluded <br />- No interior work is to take place other than what is specifically stated in the detailed scope of work above <br />- Owner is responsible for all power, water, HVAC, and wastewater safe -off and disconnection <br />- Over excavation/57 stone is not included for the footers <br />- Lead, asbestos, and mold abatement not included. If TCLP sampling testing determines that the lead is <br />hazardous, hazardous waste removal will be addressed via supplemental change order <br />- Geotechnical evaluation is excluded <br />- Any specialty permitting is not included such as environmental, discharge permit for dewatering, <br />historical, etc. <br />- Building permit fee included <br />- Dumpster to be provided by GC <br />- Certified Payroll / Davis -bacon wages are to be applied per determination provided <br />- Liability insurance included <br />- Builder's risk insurance included <br />- Bond included <br />- Any engineering, design, or drawings by JLC are excluded <br />- Certified As-Builts survey included <br />- No Liquidated Damages <br />- Any unforeseen conditions are excluded <br />- Johnson-Laux Construction is not responsible for delays to the schedule caused by other contractors <br />www.johnson-laux.com <br />CGC 151.9701 <br />
The URL can be used to link to this page
Your browser does not support the video tag.