My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2022-231B
CBCC
>
Official Documents
>
2020's
>
2022
>
2022-231B
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/16/2023 1:13:04 PM
Creation date
6/16/2023 1:11:20 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Work Order
Approved Date
11/08/2022
Control Number
2022-231B
Agenda Item Number
12.C.2.
Entity Name
Gordian /Johnson-Laux Construction, LLC
Subject
Work Order for the elevation and stabilization of the Jones Pier Bungalow/Historic House &
Jones Pier Conservation Area Public use Improvements
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
19
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Contractor's Price Proposal - Detail Continues.. <br />Work Order Number: 108749.00 <br />Work Order Title: <br />Indian River County - Jones Pier Residence <br />Section - 01 <br />7 <br />01 22 <br />20 00 0049 <br />HR Surveyor (Rod Person) <br />$3,704.18 <br />Quantity Unit Price <br />Factor <br />Total <br />Installation 120.00 x 24.95 x <br />1,2372 - <br />3,704.18 <br />survey, column line layout, grade staking, layout staking <br />8 <br />01 22 <br />20 00 0058 <br />HR Principal Engineer <br />$1,051.72 <br />Quantity Unit Price <br />Factor <br />Total <br />Installation 4.00 x 212.52 x <br />12372 = <br />1,051.72 <br />A/E to modify the existing structural drawings for permit to depict our specific scope of work <br />9 <br />01 22 <br />20 00 0058 <br />HR Principal Engineer <br />$2,103.44 <br />Quantity Unit Price <br />Factor <br />Total <br />Installation 8.00 x 212.52 x <br />1.2372 <br />2,103.44 <br />signed and sealed shoring plan <br />10 <br />01 22 <br />20 00 0059 <br />HR Senior Engineer <br />$1,602.62 <br />Quantity Unit Price <br />Factor <br />Total <br />Installation 800 x 16192 x <br />12372 = <br />1,602.62 <br />evaluation and review of material testing <br />11 <br />01 22 <br />20 00 0059 <br />HR Senior Engineer <br />$1,602.62 <br />Quantity Unit Price <br />Factor <br />Total <br />Installation 8.00 x 161.92 x <br />1.2372 = <br />1,602.62 <br />edit existing structural drawings for permit <br />12 <br />01 22 <br />20 00 0061 <br />HR Draft Person <br />$757.46 <br />Quantity Unit Price <br />Factor <br />Total <br />Installation 800 x 76.53 x <br />1,2372 <br />757.46 <br />edit existing structural drawings for permit <br />13 <br />01 22 <br />20 00 0061 <br />HR Draft Person <br />$2,272.39 <br />Quantity Unit Price <br />Factor <br />Total <br />Installation= <br />24.00 x 76.53 x <br />1.2372 <br />2,272.39 <br />creation of shoring plan <br />14 <br />01 22 <br />23 00 0155 <br />WK Up To 2,000 CFM, Portable Negative Air Machine <br />$884.92 <br />Quantity Unit Price <br />Factor <br />Total <br />Installation= <br />2.00 x 357.63 x <br />1.2372 <br />884.92 <br />2 negative air machines for mold sanitation x 1 week <br />15 <br />01 22 <br />23 00 0159 <br />EA High Efficiency Particulate Air (NEPA) Filter, 99.99% Efficient At 0.3 Micron For <br />$469.20 <br />Portable Negative Air Machines <br />Quantity Unit Price <br />Factor <br />Total <br />Installation= <br />2.00 x 189.62 x <br />1.2372 <br />469.20 <br />filter <br />16 <br />01 22 <br />23 00 0160 <br />LF Flexible Exhaust Duct For Portable Negative Air Machines <br />$115.06 <br />Quantity Unit Price <br />Factor <br />Total <br />Installation 100.00 x 0.93 x <br />1,2372 <br />115.06 <br />exhaust duct for negative air machine <br />17 <br />01 22 <br />23 00 0284 <br />MO 2,400 LB Capacity, 72" Wide, Skid -Steer Loader With Full -Time Operator <br />$39,661.30 <br />Quantity Unit Price <br />Factor <br />Total <br />Installation 3.00 x 10,685.77 x <br />1,2372 <br />39,661.30 <br />skid steer used by multiple trades for the purposes of material handling, <br />disposal, loading, grading, <br />clearing, <br />excavation, etc. <br />18 <br />01 22 <br />23 00 0291 <br />DAY Hydraulic Hammer Attachment For Skid -Steer Loaders <br />$1,023.59 <br />Quantity Unit Price <br />Factor <br />Total <br />Installation= <br />3.00 x 275.78 x <br />1.2372 <br />1,023.59 <br />hammer attachment to demo concrete stairs <br />Contractor's Price Proposal - Detail <br />Page 2 of 12 <br />10/27/2022 <br />
The URL can be used to link to this page
Your browser does not support the video tag.