Laserfiche WebLink
Contractor's Price Proposal - Detail Continues.. <br />Work Order Number: 108749.00 <br />Work Order Title: Indian River County - Jones Pier Residence <br />Section - 01 <br />30 01 54 23 00 0048 SF 1/2" CD Grade Plywood, Temporary Lumber $948.59 <br />Quantity Unit Price Factor Total <br />Installation 512.00 x 1.41 x 1,2372 893.16 <br />Demolition 160.00 x 0.28 x 1.2372 = 55.43 <br />plywood to cover existing openings after the removal of the windows. removal of existing plywood covering <br />windows <br />31 01 71 13 00 0002 <br />EA Equipment Delivery, Pickup, Mobilization And Demobilization Using A Rollback <br />$1,755.36 <br />Flatbed Trucklncludes loading, tie -down of equipment, delivery of equipment, <br />off loading on site, rigging, dismantling, loading for return and transporting <br />away. For equipment such as trenchers, skid -steer loaders (bobcats), industrial <br />warehouse forklifts, sweepers, scissor platform lifts, telescoping and <br />articulating boom man lifts with up to 40' boom lengths, etc. <br />Quantity Unit Price Factor <br />Total <br />Installation 6.00 x 236.47 x 12372 - <br />1,755.36 <br />equipment mobilization for skid steers and trencher <br />32 01 71 13 00 0003 <br />EA Equipment Delivery, Pickup, Mobilization And Demobilization Using A Tractor <br />$2,176.61 <br />Trailer With Up To 53' Bedlncludes loading, tie -down of equipment, delivery of <br />equipment, off loading on site, rigging, dismantling, loading for return and <br />transporting away. For equipment such as bulldozers, motor scrapers, <br />hydraulic excavators, gradalls, road graders, loader-backhoes, heavy duty <br />construction loaders, tractors, pavers, rollers, bridge finishers, straight mast <br />construction forklifts, telescoping boom rough terrain construction forklifts, <br />telescoping and articulating boom man lifts with >40' boom lengths, etc. <br />Quantity Unit Price Factor <br />Total <br />Installation 2.00 x 879.65 x 1.2372 <br />2,176.61 <br />mobilization of lull and excavator <br />33 01 71 36 00 0005 <br />EA >4 To 8 Hours On Site, Electromagnetic (SIR/GPR) Survey, Earth, Concrete, <br />$6,189.17 <br />Masonry Or Asphalt <br />Quantity Unit Price Factor <br />Total <br />Installation 200 x 2,501.28 x 1.2372 <br />6,189.17 <br />utility locating around the residence <br />34 01 71 36 00 0007 <br />EA Standard Report For Electromagnetic (SIR/GPR) Survey, Earth, Concrete, <br />$343.84 <br />Masonry Or Asphaltlncludes a detailed description of the scope of work, <br />inspection methods, and equipment used. Also includes visuals such as site <br />locations, images of data, and site photos. <br />Quantity Unit Price Factor <br />Total <br />Installation 1.00 x 277.92 x 1.2372 = <br />343.84 <br />reporting from utility locates <br />35 01 74 19 00 0014 EA 20 CY Dumpster (3 Ton) "Construction Debris"Includes delivery of dumpster, $2,478.16 <br />rental cost, pick-up cost, hauling, and disposal fee. Non -hazardous material. <br />Quantity Unit Price Factor Total <br />Installation 3.00 x 667.68 x 1.2372 2,478.16 <br />construction debris and waste <br />Subtotal for Section - 01 $150,053.58 <br />Section - 02 <br />36 02 41 16 13 0003 GSF Up To 2,000 SF Commercial Building Interior Demolition, Gutting And Placing $2,572.58 <br />Into Dumpster Or Truck <br />Quantity Unit Price Factor Total <br />Installation 288.00 x 7.22 x 1.2372 2,572.58 <br />selective interior demolition of walls to access sill plate for doweling areas <br />Contractor's Price Proposal - Detail Page 4 of 12 <br />10/27/2022 <br />