Contractor's Price Proposal - Detail Continues..
<br />Work Order Number: 108749.00
<br />Work Order Title: Indian River County - Jones Pier Residence
<br />Section - 01
<br />30 01 54 23 00 0048 SF 1/2" CD Grade Plywood, Temporary Lumber $948.59
<br />Quantity Unit Price Factor Total
<br />Installation 512.00 x 1.41 x 1,2372 893.16
<br />Demolition 160.00 x 0.28 x 1.2372 = 55.43
<br />plywood to cover existing openings after the removal of the windows. removal of existing plywood covering
<br />windows
<br />31 01 71 13 00 0002
<br />EA Equipment Delivery, Pickup, Mobilization And Demobilization Using A Rollback
<br />$1,755.36
<br />Flatbed Trucklncludes loading, tie -down of equipment, delivery of equipment,
<br />off loading on site, rigging, dismantling, loading for return and transporting
<br />away. For equipment such as trenchers, skid -steer loaders (bobcats), industrial
<br />warehouse forklifts, sweepers, scissor platform lifts, telescoping and
<br />articulating boom man lifts with up to 40' boom lengths, etc.
<br />Quantity Unit Price Factor
<br />Total
<br />Installation 6.00 x 236.47 x 12372 -
<br />1,755.36
<br />equipment mobilization for skid steers and trencher
<br />32 01 71 13 00 0003
<br />EA Equipment Delivery, Pickup, Mobilization And Demobilization Using A Tractor
<br />$2,176.61
<br />Trailer With Up To 53' Bedlncludes loading, tie -down of equipment, delivery of
<br />equipment, off loading on site, rigging, dismantling, loading for return and
<br />transporting away. For equipment such as bulldozers, motor scrapers,
<br />hydraulic excavators, gradalls, road graders, loader-backhoes, heavy duty
<br />construction loaders, tractors, pavers, rollers, bridge finishers, straight mast
<br />construction forklifts, telescoping boom rough terrain construction forklifts,
<br />telescoping and articulating boom man lifts with >40' boom lengths, etc.
<br />Quantity Unit Price Factor
<br />Total
<br />Installation 2.00 x 879.65 x 1.2372
<br />2,176.61
<br />mobilization of lull and excavator
<br />33 01 71 36 00 0005
<br />EA >4 To 8 Hours On Site, Electromagnetic (SIR/GPR) Survey, Earth, Concrete,
<br />$6,189.17
<br />Masonry Or Asphalt
<br />Quantity Unit Price Factor
<br />Total
<br />Installation 200 x 2,501.28 x 1.2372
<br />6,189.17
<br />utility locating around the residence
<br />34 01 71 36 00 0007
<br />EA Standard Report For Electromagnetic (SIR/GPR) Survey, Earth, Concrete,
<br />$343.84
<br />Masonry Or Asphaltlncludes a detailed description of the scope of work,
<br />inspection methods, and equipment used. Also includes visuals such as site
<br />locations, images of data, and site photos.
<br />Quantity Unit Price Factor
<br />Total
<br />Installation 1.00 x 277.92 x 1.2372 =
<br />343.84
<br />reporting from utility locates
<br />35 01 74 19 00 0014 EA 20 CY Dumpster (3 Ton) "Construction Debris"Includes delivery of dumpster, $2,478.16
<br />rental cost, pick-up cost, hauling, and disposal fee. Non -hazardous material.
<br />Quantity Unit Price Factor Total
<br />Installation 3.00 x 667.68 x 1.2372 2,478.16
<br />construction debris and waste
<br />Subtotal for Section - 01 $150,053.58
<br />Section - 02
<br />36 02 41 16 13 0003 GSF Up To 2,000 SF Commercial Building Interior Demolition, Gutting And Placing $2,572.58
<br />Into Dumpster Or Truck
<br />Quantity Unit Price Factor Total
<br />Installation 288.00 x 7.22 x 1.2372 2,572.58
<br />selective interior demolition of walls to access sill plate for doweling areas
<br />Contractor's Price Proposal - Detail Page 4 of 12
<br />10/27/2022
<br />
|