My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
05/16/2023
CBCC
>
Meetings
>
2020's
>
2023
>
05/16/2023
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/23/2023 11:56:38 AM
Creation date
6/23/2023 10:29:02 AM
Metadata
Fields
Template:
Meetings
Meeting Type
BCC Regular Meeting
Document Type
Agenda Packet
Meeting Date
05/16/2023
Meeting Body
Board of County Commissioners
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
568
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
C & W engineering Inc. <br />Consulting Engineers — Electrical - HVAC - Plumbing <br />6903 Vista Parkway North, #10 <br />West Palm Beach, FL 33411 <br />(561) 642-5333 <br />April 5, 2023 <br />Nick Black, P.E. <br />Kimley-Horn & Associates, Inc. <br />1920 Wekiva Way <br />West Palm Beach, FL 33411 <br />Subject: IRC Oslo WTP Sand Strainer Filter Equipment Replacement <br />Electrical Design and Construction Engineering Services Proposal <br />C&W Ref. 236610 <br />Dear Nick: <br />I am pleased to submit this proposal to provide design through construction of <br />the replacement of the existing sand strainer filter equipment; this would include <br />replacing the existing strainer equipment along with related pumps, and field <br />instruments, and control panel with similar capacity equipment at the Oslo WTP. We <br />would include 90% and 100% design documents, including specs and drawings, and <br />opinion of construction costs. We will also include construction services that would <br />provide review of equipment shop drawings, attend a pre -construction meeting, and <br />attend a monthly meeting, and provide a visit during equipment startup and prepare a <br />punch list. <br />It is our understanding that this project would be provided as part of a change <br />order to TLC under the current water plant improvements, instead of normal bidding <br />phase. Our design drawings would include a new control panel and field equipment, <br />along with status signal connections to the nearest existing PLC panel. <br />Coordination with Kimley Horn Engineers, Owner and Vendors. <br />DESIGN PHASE SERVICES <br />Coordination <br />Kimley Horn and Associates, Inc. <br />Owner <br />Vendors <br />Engineering <br />221 <br />
The URL can be used to link to this page
Your browser does not support the video tag.