My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2023-104
CBCC
>
Official Documents
>
2020's
>
2023
>
2023-104
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/27/2023 1:22:16 PM
Creation date
6/27/2023 1:13:27 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Agreement
Approved Date
06/06/2023
Control Number
2023-104
Agenda Item Number
8.K.
Entity Name
Federal Department of Transportation (FDOT
Subject
State Highway System Project Funding Agreement for traffic monitoring
SystemTechnology update project
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
40
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
STATE OF FLORIDA DEPARTMENT OF TRANSPORTATION <br />STATE HIGHWAY SYSTEM <br />PROJECT FUNDING AGREEMENT <br />EXHIBIT E <br />TERMS AND CONDITIONS OF CONSTRUCTION <br />i. Design and Construction Standards and Required Approvals. <br />a. The Agency understands that it is responsible for the preparation and certification of all design <br />plans for the Project. The Agency shall hire a qualified consultant for the design phase of the <br />Project or, if applicable, the Agency shall require their design -build contractor or construction <br />management contractor to hire a qualified consultant for the design phase of the Project. <br />b. Execution of this Agreement by both Parties shall be deemed a Notice to Proceed to the Agency <br />for the design phase or other non -construction phases of the Project. If the Project involves a <br />construction phase, the Agency shall not begin the construction phase of the Project until the <br />Department issues a Notice to Proceed for the construction phase. Prior to commencing the <br />construction work described in this Agreement, the Agency shall request a Notice to Proceed from <br />the Department's Project Manager, Daniel A. Smith (email: Daniel.smith@dot.state.fl.us) or from <br />an appointed designee. Any construction phase work performed prior to the execution of this <br />required Notice to Proceed is not subject to reimbursement. <br />c. The Agency will provide one (1) copy of the final design plans and specifications and final bid <br />documents to the Department's Project Manager prior to bidding or commencing construction of <br />the Project. <br />d. The Agency shall require the Agency's contractor to post a payment and performance bond in <br />accordance with applicable law(s). <br />e. The Agency shall be responsible to ensure that the construction work under this Agreement is <br />performed in accordance with the approved construction documents, and that the construction <br />work will meet all applicable Agency and Department standards. <br />f. Upon completion of the work authorized by this Agreement, the Agency shall notify the <br />Department in writing of the completion of construction of the Project; and for all design work <br />that originally required certification by a Professional Engineer, this notification shall contain an <br />Engineer's Certification of Compliance, signed and sealed by a Professional Engineer, the form of <br />which is attached to this Exhibit. The certification shall state that work has been completed in <br />compliance with the Project construction plans and specifications. If any deviations are found from <br />the approved plans or specifications, the certification shall include a list of all deviations along <br />with an explanation that justifies the reason to accept each deviation. <br />2. Construction on the Department's Right of Way. If the Project involves construction on the <br />Department's right-of-way, then the following provisions apply to any and all portions of the Project that <br />are constructed on the Department's right-of-way: <br />a. The Agency shall hire a qualified contractor using the Agency's normal bid procedures to perform <br />the construction work for the Project. The Agency must certify that the installation of the Project <br />is completed by a Contractor prequalified by the Department as required by Section 2 of the <br />Page 22 of 29 <br />
The URL can be used to link to this page
Your browser does not support the video tag.