My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2023-104
CBCC
>
Official Documents
>
2020's
>
2023
>
2023-104
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/27/2023 1:22:16 PM
Creation date
6/27/2023 1:13:27 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Agreement
Approved Date
06/06/2023
Control Number
2023-104
Agenda Item Number
8.K.
Entity Name
Federal Department of Transportation (FDOT
Subject
State Highway System Project Funding Agreement for traffic monitoring
SystemTechnology update project
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
40
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
STATE OF FLORIDA DEPARTMENT OF TRANSPORTATION 750-010.22 <br />TRAFFIC SIGNAL MAINTENANCE AND COMPENSATION AGREEMENT TRAFFIC <br />S <br />04/15 <br />Page 2 of 5 <br />incurred due to traffic impacts to mast arms, which reimbursements will be processed after the Department receives a properly <br />completed and supported invoice from the Maintaining Agency. The Department will pursue reimbursements from individuals <br />and/or the third parties who cause damages to mast arms and are liable for replacement/repair costs. Failure to perform <br />preventative maintenance after notification of an inspection deficiency will result in the Maintaining Agency being responsible for <br />the corrective actions. If spot painting or any other described preventative maintenance is not carried out, there shall be a 25% <br />retainage of the annual compensation amount for the affected signal locations until the preventative maintenance is performed. <br />For each month subsequent to the expiration of the 90 -day notice given to the Maintaining Agency that preventative maintenance <br />deficiencies exist, 1/121' of the annual compensation amount for the affected signal locations will be forfeited up to 25% of the <br />annual compensation amount. In the case of a total paint failure on a mast arm installed prior to the date of this Agreement, the <br />Department will fund the cost of repainting. This does not include any mast arm that was installed with a separate mast arm <br />painted finish agreement. The terms of that agreement will control. <br />Periodic maintenance includes but is not limited to: repair of cracks in the mast arm structure; removal and/or repair of grout <br />pads; resetting of anchor bolts; and repair or replacement of deteriorated anchor bolts and nuts. For any new mast arm <br />installations after the date of this Agreement, if a Maintaining Agency requests a painted mast arm, the Maintaining Agency <br />agrees to perform all required periodic and preventative maintenance. Any periodic maintenance performed on the mast arm <br />structure by the Maintaining Agency needs Department approval prior to commencement of work and shall be performed within <br />90 days unless under an emergency situation. Any and all work performed by the Maintaining Agency must conform to the <br />current Department Standard Specifications for Road and Bridge Construction as applicable. Mast arms that the Department <br />determines to be at the end of its useful life will be replaced by the Department so long as documented preventative maintenance <br />and any applicable periodic maintenance was satisfactorily performed by the Maintaining Agency. <br />The Table below summarizes the roles of the Maintaining Agency and the Department with regard to preventative and periodic <br />maintenance of mast arms: <br />Maintaining Agency <br />Florida DOT <br />Preventative maintenance of all mast arm structures <br />Periodic maintenance of all mast arm structures (except for <br />any new painted and existing painted structures with signed <br />separate Agreement) <br />Periodic maintenance of structures (for any new <br />painted and existing painted structures with signed <br />separate Agreement) <br />Damage repair or replacement of structures <br />Compensate Maintaining Agency for damage repair or <br />replacement of structures <br />Replacement at end of life cycle of the structure <br />The Department will reimburse the Maintaining Agency for costs incurred due to traffic impacts to traffic signal controller cabinet <br />assemblies, traffic signal battery backup, UPS cabinet assemblies, pedestrian flashing beacons, strain pole repair or <br />replacement, and all devices shown in Exhibit A, if the Maintaining Agency is not successful in recovering damage costs from <br />responsible parties. The Maintaining Agency will be responsible for pursuing reimbursements from individuals and/or the third <br />parties that cause damages. However, if the Maintaining Agency is not successful in recovering damage costs from responsible <br />party(ies) within 180 days from the occurrence of damage, the Department will pursue reimbursements from individuals and/or <br />the third parties who cause damages and are liable for replace ment/repair costs to the traffic signal controller cabinet assemblies, <br />traffic signal battery backup, UPS cabinet assemblies, pedestrian flashing beacons, strain poles, and all devices shown in Exhibit <br />A. Applicable reimbursements will be processed afterthe Department receives a properly completed and supported invoice from <br />the Maintaining Agency. <br />8. The Maintaining Agency may remove any component of the installed equipment for repair or testing; however, it shall only make <br />permanent modifications or equipment replacements and only if the equipment provided is capable of performing at minimum <br />the same functions as the equipment being replaced. The Department shall not make any modifications or equipment <br />replacements without prior written notice to and consultation with the Maintaining Agency. <br />a. The Maintaining Agency shall implement and maintain the timing and phasing of the traffic signals in accordance with <br />the Department's timing and phasing plans, specifications, special provisions, Department re -timing projects, and the <br />Department's Traffic Engineering Manual. The Maintaining Agency shall obtain prior written approval from the <br />Department for any modification in phasing of signals and flash times (where applicable). Signal Systems timings <br />(cycle length, split, offsets, sequence) are considered operational changes and may be changed by the Maintaining <br />Agency to accommodate changing needs of traffic. The Maintaining Agency may make changes in the signal timing <br />provided these changes are made under the direction of a qualified Professional Engineer registered in the State of <br />Florida. The Maintaining Agency shall make available a copy of the timings to the Department upon request. The <br />Department reserves the right to examine equipment, timing and phasing at any time and, after consultation with the <br />Maintaining Agency, may specify modifications. If the Department specifies modification in timing or phasing, <br />implementation of such modifications will be coordinated with, or made by, the Maintaining Agency. All signal timing <br />and phasing records shall be retained by the Maintaining Agency for at least three (3) years, and will be made available <br />to the Department upon request. <br />
The URL can be used to link to this page
Your browser does not support the video tag.