Laserfiche WebLink
STATE OF FLORIDA DEPARTMENT OF TRANSPORTATION <br />TRAFFIC SIGNAL MAINTENANCE AND COMPENSATION AGREEMENT <br />754.010-22 <br />TRAFFIC OPERATIONS <br />a/15 <br />E,hlblt A PaS-A otlt— <br />*Amount paid shall be the Total Lump Sum minus any retainage or forfeiture. <br />I certify that the above traffic signals will be maintained and operated In accordance with the requirements of the Traffic nal Maintenance <br />and Compensation Agreement. For satisfactory completion of all services detailed in this Agreement for this time perio <br />the Department will pay the Maintaining Agency a Total Lump Sum (minus any retainage or forfeiture) of $216,904.00 <br />Maintaining Agency <br />Date <br />District Traffic Operations Engineer <br />,� IS <br />Date <br />EXI IIBIT A <br />To: <br />Intersection Locations <br />Traffic <br />Signal <br />TS <br />Pedestrian <br />Traffic Signal - Intersection Flashing Emergency <br />Interconnected & Control Beacon Fire Dept, <br />Monitored (IMTS) Beacon (ICS) (pre) Signal (FDS) <br />pee <br />Activated <br />Warning <br />Display <br />(SAWD) <br />OR Blank <br />Out Sign <br />(BOS) <br />Traffic <br />Waming <br />Beacon <br />(TWB) <br />Travel <br />Time <br />Detector <br />Uninterruptible <br />Power Supplies <br />(UPS) <br />Compensation <br />Amount (using <br />Unit Races from <br />Exhibit B) <br />60 <br />SEA OAKS & AIA <br />TS <br />$3,040.00 <br />61 <br />SR 60 @ 53 Ave <br />TS <br />$3,040.00 <br />62 <br />SR60 @ 20 AVE <br />TS <br />$3,040.00 <br />63 <br />SR60 @ 27 AVE <br />TS <br />$3,040.00 <br />64 <br />SR60 @ 43 AVE <br />TS <br />$3,040.00 <br />65 <br />SR60 @ 58 AVE <br />TS <br />$3,040.00 <br />66 <br />SR60 @ 66 AVE <br />TS <br />$3,040.00 <br />67 <br />SR60 @ 74 AVE <br />TS <br />$3,040.00 <br />68 <br />SR60 @ 82 AVE <br />TS <br />_ <br />$3,040.00 <br />69 <br />SR60 @ 90 AVE <br />TS <br />$3,040.00 <br />70 <br />SR60 @ 98 AVE <br />TS <br />$3,040.00 <br />71 <br />SR60 @ 1-95 N8 <br />TS <br />$3,040.00 <br />72 <br />SR60 @ 1-95 SB <br />TS <br />$3,040.00 <br />73 <br />SR60 @ MALL <br />TS <br />$3,040.00 <br />74 <br />ST ED @ SR AIA <br />TS <br />$3,040.00 <br />75 <br />ST ED SCHOOL BEACON/ <br />SRA1A <br />TWB <br />$304.00 <br />76 <br />US 1 @ 10 AVE <br />TS <br />$3,040.00 <br />77 <br />US1 @ 11 AVE <br />TS <br />$3,040.00 <br />78 <br />VISTA @ U51 <br />TS <br />$3,040.00 <br />79 <br />69 ST @ US 1 <br />TS <br />$3,040.00 <br />Total Lump Sum <br />$216,904.00 <br />*Amount paid shall be the Total Lump Sum minus any retainage or forfeiture. <br />I certify that the above traffic signals will be maintained and operated In accordance with the requirements of the Traffic nal Maintenance <br />and Compensation Agreement. For satisfactory completion of all services detailed in this Agreement for this time perio <br />the Department will pay the Maintaining Agency a Total Lump Sum (minus any retainage or forfeiture) of $216,904.00 <br />Maintaining Agency <br />Date <br />District Traffic Operations Engineer <br />,� IS <br />Date <br />