Laserfiche WebLink
A TRUE COPY <br />CERTIFICATION ON LAST PAGE <br />J.R. StAITH, CLERK <br />Control processing and resulting error reports will assist the county GIS data providers in <br />identifying appropriate values with which to attribute the GIS data. Quality Control checks <br />include synchronization between the GIS, MSAG, and ALI database to assist each agency in <br />achieving the recommended NENA 98% synchronization level. <br />GeoComm will support the project with a dedicated GIS professional to meet with local agencies <br />to review the error reports and results and provide coaching on updates that need to be made. <br />Meetings will be held remotely; in-state travel may be required, approved, and reimbursed <br />following the guidelines of the GSA. <br />Upon submission of the GIS data by a participating county, GeoComm GIS Data Hub will be <br />configured to run Quality Control Checks based on NENA i3 data standards, GIS data <br />management best practices, the needs and requirements of the Region, and GeoComm's <br />experience working on similar projects. This will include checking the geometry and attribution <br />of the NENA NG9-1-1 required layers listed above; and checking for gaps and overlaps within <br />the data once it is merged into a regional dataset. Once the GIS data is processed in GeoComm <br />GIS Data Hub, a report will be provided of anomalies and errors. GeoComm's GIS team along <br />with the local GIS professional based in Florida will be available to meet with local agencies to <br />review suggested corrections for the local agency to pursue. <br />The regional GIS dataset will be available for download by regional participants. The GIS data <br />may be shared, based on memorandum of understanding or other authorizations with other <br />regions and the State of Florida. Copies of the GIS datasets will be available for Next <br />Generation 9-1-1 Core Services providers to access and load into their systems. <br />GeoComm proposes to complete the following phases for a timely completion of the Region 5 <br />project: <br />• Onboarding and Implementation Meeting <br />• Hub Configuration and Data Load <br />• Hub System and Process Training <br />• Go Live <br />• Data Submission, Analysis, and Merged Dataset Creation <br />• Ongoing Operational Support Services <br />Application and instructions for 911 Grant Programs, revised July 2021 <br />W Form 3A, incorporated by reference in Fla. Admin. Code R. 60FF1-5.003 911 Grant Programs <br />18 <br />