My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2023-029
CBCC
>
Resolutions
>
2020's
>
2023
>
2023-029
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/7/2023 12:14:01 PM
Creation date
7/3/2023 1:57:13 PM
Metadata
Fields
Template:
Resolutions
Resolution Number
2023-029
Approved Date
06/20/2023
Agenda Item Number
12.H.1.
Resolution Type
Revise Utility Services Rate Schedule
Entity Name
Indian River County Department of Utility Services (IRCDUS),
Subject
Revise Utility Services Rate Schedule
Rate increase of 5.5%
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
6
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Other Rates, Fees, and Charges <br />Deposits — Except hydrant meter $ 50.00 <br />Required upon opening, transferring or <br />reconnecting service — per ERU <br />Deposits — per hydrant meter $ 345.00 <br />Charge for returned check As per Florida Statute <br />section 832.08 <br />New Account fee (due opening or re -opening an account) $ 28.41 <br />Issuance of duplicate bill $ 1.71 <br />Meter removal fee $ 85.23 <br />Water service connection — 5/8" to 1.5" meter $ 2,785.00 <br />Water service connection — larger than 1.5" meter Cost plus overhead <br />Sewer service connection — single family $2,895.00 <br />Sewer service connection — commercial Cost plus overhead <br />Unauthorized use of fire hydrants -per occurrence $ 130.69 <br />Unauthorized use of fire hydrants volumetric charge - Indian River County Department of Utility Services <br />(IRCDUS) shall be the sole determinant of usage as per County code <br />Fire Protection (per month) $ 17.23 <br />Meter installation - 5/8" <br />Meter installation -1" <br />Meter installation - 1.5" <br />Meter installation - 2"and larger <br />Meter installation — hydrant meter <br />Line extension fees - water <br />Line extension fees — sewer <br />Water service disconnection determined by IRCDUS/includes reconnect <br />$ 130.00 <br />$ 250.00 <br />$ 500.00 <br />Cost plus overhead <br />Cost plus overhead <br />Cost plus overhead <br />Cost plus overhead <br />$ 85.23 <br />
The URL can be used to link to this page
Your browser does not support the video tag.