M J MASTELLER & MOLER, INC. <br />M1 — CIVIL ENGINEERS <br />165527 1h Street, Ste. 2, Vero <br />FL 32960 <br />(772) 567-5300 <br />advertise and bid the proposed Site Improvements Project. Additionally, we will provide engineering <br />services during the project's bidding process generally including but not limited to the following: <br />1. Preparation for and attendance at a mandatory pre-bid meeting and preparation of a <br />letter of response to include in an addendum. <br />2. Revise and/or amend Contract Plans and Specifications and prepare written addendum / <br />addenda during bidding to reflect any comments and/ or requirements by permitting <br />agencies. <br />3. Research and responses to bidders' questions to be incorporated into written addenda <br />during the bidding process. <br />4. Review submitted bids, evaluate for correctness and completion, compile bid comparison <br />by line item for each bidder, contact references (if applicable), and provide Letter of <br />Findings and Recommendation of Contract Award. <br />Task F — Construction Administration and Observation <br />Masteller & Moler, Inc. shall provide engineering services as needed during the construction of the <br />project generally including but not limited to the following: <br />1. Preparation for and attendance of a mandatory pre -construction meeting; <br />2. Periodic construction observations as needed; <br />3. Perform the walkthrough at the end of the construction; <br />4. Provide a punch list to the Contractor; <br />5. Review the As -built drawings; <br />6. Prepare Project Close-out/Certification documents. <br />Deliverables — The ENGINEER shall provide the COUNTY: <br />a. 60% Construction Plans and Preliminary Specifications — 1 Hard Copy + PDF <br />b. Final Construction Plans - 2 Sets + PDF <br />C. Bid Documents and Final Specifications necessary for Advertisement and Bidding of the work <br />d. Related digital AutoCAD, DOC, and PDF files <br />TIME SCHEDULE <br />Project shall be completed as follows: <br />Engineering Design & Preparation of Construction Plans (after NTP Receipt) 60 Working Days <br />Submittal of Permit Applications (after NTP Receipt) 80 Working Days <br />Page 3 of 4 <br />