My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2023-131
CBCC
>
Official Documents
>
2020's
>
2023
>
2023-131
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/5/2023 11:05:37 AM
Creation date
7/5/2023 11:04:37 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Work Order
Approved Date
06/20/2023
Control Number
2023-131
Agenda Item Number
12.G.3.
Entity Name
Tetra Tech, Inc.
Subject
Work Order 1 Indian River County Management Plan Project for
professional water resource engineering support services
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
5
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Mr. Eric Charest <br />June 1, 2023 <br />Page 2 of 4 <br />meeting, take notes, and log comments from each commissioner. These meetings will be held in- <br />person at the IRC office in a single day to minimize travel time and costs. Tetra Tech will assist <br />IRC staff to ensure that the commissioners' comments are included in the draft Lagoon <br />Management Plan. <br />Task 2: Facilitation and Support for Two Public Workshops <br />Tetra Tech will work collaboratively with IRC staff during plan development to prepare for two <br />public workshops. At least one of these workshops will be held in the evening hours. Tetra Tech <br />will assist in preparing a presentation summarizing the draft Lagoon Management Plan. The <br />workshops will seek input for data gaps, projects, and topics for the draft plan. Tetra Tech will <br />prepare an agenda, facilitate each meeting, take notes, and log comments. In addition, Tetra Tech <br />can assist with providing online tools to allow for virtual participation in the workshops if IRC <br />desires. <br />The public comment and review period for the draft Lagoon Management Plan will be open for <br />30 days during which time Tetra Tech will work with IRC staff to gather additional comments. <br />All comments received will be tracked in an Excel document that notes the commenter, location <br />in draft plan, and comment. Tetra Tech will work with IRC to provide a response to each <br />comment, which will include noting how the plan was revised, if applicable. <br />Task 3: Meetings with Specific Interest Groups <br />Tetra Tech will also support IRC staff in 6 to 8 meetings with specific interest groups in the <br />County. These meetings will be held with individual groups to discuss the draft Lagoon <br />Management Plan and obtain input. IRC staff will identify the key interest groups to meet with, <br />such environmental organizations and homeowner's associations, and provide contacts for each <br />group. Tetra Tech will work with IRC staff to set up these meetings, facilitate each meeting, take <br />notes, and log comments received. Tetra Tech will participate in half of these meetings in-person <br />and half of the meetings virtually. <br />PROJECT SCHEDULE <br />The approximate duration noted for each task is based on our current understanding and best <br />estimates of time required to perform the basic services and may be subject to change upon <br />agreement between IRC and Tetra Tech. <br />Task <br />Timeline <br />Notice to Proceed TP <br />June 20, 2023 <br />Meetings with IRC Commissioners <br />July 2023 <br />Public Workshops <br />August 2023 <br />Meetings with Specific Interest Groups <br />I August — September 2023 <br />ASSUMPTIONS <br />Tetra Tech's scope of services and project costs were developed with the following assumptions: <br />TETRA TECH <br />
The URL can be used to link to this page
Your browser does not support the video tag.