Laserfiche WebLink
5. In no event shall the District be liable for any damages done or caused by the District <br />to the public, to Permittee or any other person, using right-of-way or property subject to this <br />Permit, and Permittee shall save the District, its officers, agents, supervisors, and employees <br />harmless from any costs, charge or expense or claim or demand of any person against the District <br />arising from or pertaining to any use made of the property or structures subject to this Permit. <br />Permittee shall, as a condition to the effectiveness of this Permit, provide to District evidence <br />satisfactory to District, of liability insurance coverage in amounts and with companies as may be <br />required by District, protecting the interest of District and naming District as an additional <br />insured. The certificate of insurance must contain a provision that thirty (30) days notice will be <br />given to the District at its address in Vero Beach, Florida, before any cancellation of such <br />insurance may become effective. This Permit shall be null and void if adequate reserves are not <br />maintained by the Permittee. <br />6. Permittee is cautioned that electrical, water, sewer, gas or other installations or utilities <br />may be located within the permit are, and Permittee shall use diligent efforts to first detect and <br />locate all such installations and shall coordinate construction with all other lawful users of said <br />right-of-way. Permittee shall be liable for all damages proximately resulting from its <br />interference with or interruption of services provided by other lawful right-of-way users. <br />7. The District may, on thirty days' written notice to the Permittee, require cessation of <br />use into District's facilities, removal or alteration of any installation or construction on District <br />right-of-way. <br />S. Any construction on District right-of-way or property and cleanup shall be completed <br />promptly by Permittee and in a workmanlike manner with minimum disturbance to existing <br />berm, channel slopes and grade with proper restoration and planting of any disturbed areas to <br />prevent erosion within ten days after completion of construction or installation. <br />9. The Permittee shall at all times maintain markers above ground at 100 foot intervals to <br />show the location of any underground objects. The fiber-optic cable shall be constructed and <br />installed to permit the crossing of heavy equipment used by the District for the maintenance of <br />its laterals, sublaterals and canals and for any similar heavy equipment used by land ownca <br />within the District. In any case where the force main crosses a pipe or culvert used for drainage <br />or irrigation purposes, or a pipe or culvert is needed hereafter for drainage or irrigation of <br />2 <br />